ROADWORKS SUMMARY
Church Field Road, SUDBURY, CO10 2YA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Church Field Road, CO10 2YA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Church Field Road, SUDBURY, CO10 2YA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Church Field Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Hall Street

Anglian Water are carrying out Utility repair and maintenance works on Hall Street, Long Melford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 08:04 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 22 Mar 2024 at 14:44.

Anglian Water logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Little St Marys

Anglian Water are carrying out Utility repair and maintenance works on Little St Marys, Long Melford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 08:04 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 22 Mar 2024 at 14:44.

Gigaclear logo
Until
9 May 2024
Details
View Map
Share
Follow
Lavenham Road

Gigaclear are carrying out Utility asset works on Lavenham Road, The Heath, Great Waldingfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 06:00 and could run through until 9 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 23 Apr 2024 at 07:55.

Suffolk County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
King Street

Suffolk County Council are carrying out Highway repair and maintenance works on King Street, Sudbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 07:00 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 23 Apr 2024 at 12:13.

Suffolk County Council logo
Between
22 Apr and 4 May 2024
Details
View Map
Share
Follow
Nayland Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Nayland Road, Leavenheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 15 Mar 2024 at 08:54.

Suffolk County Council logo
Between
22 Apr and 4 May 2024
Details
View Map
Share
Follow
Colchester Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Colchester Road, Assington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 15 Mar 2024 at 08:53.

Suffolk County Council logo
Between
22 Apr and 4 May 2024
Details
View Map
Share
Follow
Further Street

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Further Street, Assington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 15 Mar 2024 at 08:52.

Cadent Gas logo
Between
22 Apr and 10 May 2024
Details
View Map
Share
Follow
Butt Road

Cadent Gas are proposing to carry out Utility asset works on Butt Road, Great Cornard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Feb 2024 at 11:10.

Gigaclear logo
Between
29 Apr and 20 May 2024
Details
View Map
Share
Follow
Folly Road

Gigaclear are proposing to carry out Utility asset works on Folly Road, Great Waldingfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 23 Apr 2024 at 10:25.

Essex County Council logo
Between
8 and 13 May 2024
Details
View Map
Share
Follow
Bulmer Tye

Essex County Council are proposing to carry out Highway improvement works on Bulmer Tye, Bulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Apr 2024 at 08:12.

Gigaclear logo
Between
25 May and 1 Jun 2024
Details
View Map
Share
Follow
Bull Lane

Gigaclear are proposing to carry out Utility asset works on Bull Lane, Long Melford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 1 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 19 Mar 2024 at 16:12.

UK Power Networks Eastern & London logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Boxford Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Boxford Road, Milden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 13:38.

Cadent Gas logo
Between
29 May and 17 Jun 2024
Details
View Map
Share
Follow
Lindsey Avenue

Cadent Gas are proposing to carry out Utility asset works on Lindsey Avenue, Great Cornard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 13:14.

Cadent Gas logo
Between
29 May and 13 Jun 2024
Details
View Map
Share
Follow
Poplar Road

Cadent Gas are proposing to carry out Utility asset works on Poplar Road, Great Cornard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 09:35.

Gigaclear logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Prentice Street

Gigaclear are proposing to carry out Utility asset works on Prentice Street, Lavenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 23 Apr 2024 at 09:29.

Anglian Water logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Powney Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Powney Street, Milden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 18 Apr 2024 at 12:34.

Anglian Water logo
Between
4 and 6 Jun 2024
Details
View Map
Share
Follow
Croft Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Croft Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 12:10.

Anglian Water logo
Between
4 and 6 Jun 2024
Details
View Map
Share
Follow
Gainsborough Road

Anglian Water are proposing to carry out Remedial works on Gainsborough Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 12:10.

Gigaclear logo
Between
10 and 14 Jun 2024
Details
View Map
Share
Follow
Hall Road

Gigaclear are proposing to carry out Utility asset works on Hall Road, Lavenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 20 Mar 2024 at 15:52.

Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Acton Lane

Open Fibre Networks are proposing to carry out New service connection on Acton Lane, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Open Fibre Networks on 25 Mar 2024 at 12:49.

Suffolk County Council logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Meadow View Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Meadow View Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 22 Apr 2024 at 10:20.

Suffolk County Council logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Lark Rise

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Lark Rise, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 22 Apr 2024 at 10:20.

Suffolk County Council logo
Between
17 and 19 Jun 2024
Details
View Map
Share
Follow
Lavenham Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Lavenham Road, Great Waldingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Apr 2024 at 13:41.

Anglian Water logo
Between
17 and 19 Jun 2024
Details
View Map
Share
Follow
Barracks Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Barracks Road, Assington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Mar 2024 at 11:10.

Anglian Water logo
Between
1 and 3 Jul 2024
Details
View Map
Share
Follow
Blackhouse Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Blackhouse Lane, Great Cornard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Mar 2024 at 14:57.

Anglian Water logo
Between
3 and 5 Jul 2024
Details
View Map
Share
Follow
Boxford Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Boxford Lane, Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Apr 2024 at 14:43.

Between
8 and 12 Jul 2024
Details
View Map
Share
Follow
Acton Lane

Open Fibre Networks are proposing to carry out New service connection on Acton Lane, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Open Fibre Networks on 2 Apr 2024 at 14:05.

Between
8 and 12 Jul 2024
Details
View Map
Share
Follow
Acton Lane

Open Fibre Networks are proposing to carry out New service connection on Acton Lane, Chilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Open Fibre Networks on 4 Apr 2024 at 13:01.

Suffolk County Council logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Wells Hall Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Wells Hall Road, Great Cornard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 23 Apr 2024 at 10:21.

Suffolk County Council logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Nursery Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Nursery Road, Great Cornard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 23 Apr 2024 at 10:20.

Suffolk County Council logo
Between
24 and 26 Jul 2024
Details
View Map
Share
Follow
Woodhall Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Woodhall Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Apr 2024 at 07:40.


Roadworks Map near to Church Field Road, SUDBURY, CO10 2YA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 17:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Church Field Road, SUDBURY, CO10 2YA (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
CHERRYTREE ROAD UNASSOCIATED FOOTWAY 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 21 Apr 2024 - 2 May 2024
0.7
Details
Share
Follow
2
Cadent Gas logo
CHERRYTREE ROAD UNASSOCIATED FOOTWAY 
(0.7 miles)
Cadent Gas
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 1 May 2024
0.7
Details
Share
Follow
3
Anglian Water logo
NEWTON CROFT 
(0.7 miles)
Anglian Water
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 26 Apr 2024 07:20
(Scheduled: 25 Apr 2024 - 29 Apr 2024)
0.7
Details
Share
Follow
4
Cadent Gas logo
SYCAMORE ROAD UNASSOCIATED FOOTWAY 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 1 May 2024
0.7
Details
Share
Follow
5
Cadent Gas logo
CHERRYTREE ROAD UNASSOCIATED FOOTWAY 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 1 May 2024
0.7
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
SYCAMORE ROAD UNASSOCIATED FOOTWAY 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Verge - No carriageway incursion
In Progress
Since: 13 Mar 2024 09:09
(Scheduled: 11 Mar 2024 - 9 May 2024)
0.7
Details
Share
Follow
7
UK Power Networks Eastern & London logo
URGENT
  
CHELSWORTH AVENUE UNASSOCIATED FOOTWAY 
(0.7 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 26 Apr 2024 08:55
(Scheduled: 26 Apr 2024 - 2 May 2024)
0.7
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
FOOTWAY BETWEEN POPLAR ROAD AND HAWTHORN ROAD 
(0.7 miles)
Cadent Gas
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 14 Apr 2024 - 26 May 2024
0.7
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
BUTT ROAD 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 22 Apr 2024 - 10 May 2024
0.8
Details
Share
Follow
10
Gigaclear logo
MAJOR
  
LAVENHAM ROAD, THE HEATH 
(1.0 miles)
Gigaclear
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 15 Apr 2024 06:00
(Scheduled: 11 Apr 2024 - 9 May 2024)
1.0
Details
Share
Follow