ROADWORKS SUMMARY
Little Waldingfield, SUDBURY, CO10 0TD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for CO10 0TD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Little Waldingfield, SUDBURY, CO10 0TD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
The Croft

Cadent Gas are carrying out Utility repair and maintenance works on The Croft, Sudbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 December 2024 at 20:38 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 11:16.

Anglian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Lavenham Road

Anglian Water are carrying out Utility repair and maintenance works on Lavenham Road, Lindsey.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 08:00 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Feb 2025 at 08:05.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Folly Road

Anglian Water are carrying out Utility repair and maintenance works on Folly Road, Great Waldingfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 February 2025 at 13:58 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 15 Feb 2025 at 14:18.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Woodhall Road

Cadent Gas were proposing to carry out Remedial works on Woodhall Road, Sudbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 13:57.

Suffolk County Council logo
Between
18 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Boxford Lane

Suffolk County Council are proposing to carry out Highway improvement works on Boxford Lane, Newton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 09:09.

Suffolk County Council logo
Between
18 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Further Street

Suffolk County Council are proposing to carry out Highway improvement works on Further Street, Assington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 09:09.

Anglian Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Mill Green

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Green, Edwardstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 15:58.

Anglian Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Mill Green

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Green, Edwardstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 13 Feb 2025 at 12:55.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Road From B1115 To A1141

Suffolk County Council are proposing to carry out Highway improvement works on Road From B1115 To A1141, Monks Eleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:20.

Suffolk County Council logo
Between
3 and 15 Mar 2025
Details
View Map
Share
Road From B1115 To A1141

Suffolk County Council were proposing to carry out Highway improvement works on Road From B1115 To A1141, Monks Eleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:12.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coombes Hill

Suffolk County Council are proposing to carry out Highway improvement works on Coombes Hill, Monks Eleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 12:12.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Road From B1115 To A1141

Suffolk County Council are proposing to carry out Highway improvement works on Road From B1115 To A1141, Monks Eleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 12:13.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coombes Hill

Suffolk County Council are proposing to carry out Highway improvement works on Coombes Hill, Monks Eleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:20.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coombes Hill

Suffolk County Council are proposing to carry out Highway improvement works on Coombes Hill, Milden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 12:12.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Milden Hall

Suffolk County Council are proposing to carry out Highway improvement works on Milden Hall, Milden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:18.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coombes Hill

Suffolk County Council are proposing to carry out Highway improvement works on Coombes Hill, Milden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:19.

Suffolk County Council logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Windmill Hill

Suffolk County Council are proposing to carry out Highway improvement works on Windmill Hill, Long Melford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 10:47.

Suffolk County Council logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Windmill Hill

Suffolk County Council are proposing to carry out Highway improvement works on Windmill Hill, Long Melford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Jan 2025 at 16:17.

Suffolk County Council logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Clare Road

Suffolk County Council are proposing to carry out Highway improvement works on Clare Road, Long Melford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 10:48.

Suffolk County Council logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Clare Road

Suffolk County Council are proposing to carry out Highway improvement works on Clare Road, Long Melford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Jan 2025 at 16:17.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Milden Hall

Suffolk County Council are proposing to carry out Highway improvement works on Milden Hall, Milden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 12:12.

Suffolk County Council logo
Between
3 and 15 Mar 2025
Details
View Map
Share
Milden Hall

Suffolk County Council were proposing to carry out Highway improvement works on Milden Hall, Milden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:08.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Humble Green

Suffolk County Council are proposing to carry out Highway improvement works on Humble Green, Little Waldingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 12:11.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Humble Green

Suffolk County Council are proposing to carry out Highway improvement works on Humble Green, Little Waldingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:18.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Humble Green

Suffolk County Council were proposing to carry out Highway improvement works on Humble Green, Little Waldingfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 12:32.

Suffolk County Council logo
Between
5 and 10 Mar 2025
Details
View Map
Share
Follow
Woodhall Road

Suffolk County Council are proposing to carry out Highway improvement works on Woodhall Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 4 Feb 2025 at 13:53.

Suffolk County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Coombes Hill

Suffolk County Council were proposing to carry out Highway improvement works on Coombes Hill, Monks Eleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:01.

Suffolk County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Coombes Hill

Suffolk County Council were proposing to carry out Highway improvement works on Coombes Hill, Milden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 13:05.

UK Power Networks Eastern & London logo
Between
13 and 16 Mar 2025
Details
View Map
Share
Follow
Boxford Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Boxford Road, Milden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 12:46.

UK Power Networks Eastern & London logo
Between
13 and 19 Mar 2025
Details
View Map
Share
Follow
Boxford Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Boxford Road, Milden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jan 2025 at 10:15.

Suffolk County Council logo
LONG TERM
Between
24 Mar and 13 Jun 2025
Details
View Map
Share
Follow
Lower Road

Suffolk County Council are proposing to carry out Works for road purposes on Lower Road, Lavenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 9 Jan 2025 at 13:36.

Suffolk County Council logo
LONG TERM
Between
24 Mar and 13 Jun 2025
Details
View Map
Share
Lower Road

Suffolk County Council were proposing to carry out Works for road purposes on Lower Road, Lavenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Feb 2025 at 14:48.

Suffolk County Council logo
LONG TERM
Between
24 Mar and 13 Jun 2025
Details
View Map
Share
Prentice Street

Suffolk County Council were proposing to carry out Works for road purposes on Prentice Street, Lavenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 8 Jan 2025 at 16:52.

Suffolk County Council logo
Between
25 and 28 Mar 2025
Details
View Map
Share
Follow
Woodhall Road

Suffolk County Council are proposing to carry out Highway improvement works on Woodhall Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 15:34.

Suffolk County Council logo
Between
25 and 28 Mar 2025
Details
View Map
Share
Follow
Woodhall Road

Suffolk County Council are proposing to carry out Highway improvement works on Woodhall Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 10:08.

Anglian Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Sherbourne Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Sherbourne Street, Boxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 7 Feb 2025 at 10:06.

Suffolk County Council logo
Between
5 and 11 May 2025
Details
View Map
Share
Follow
Stone Street

Suffolk County Council are proposing to carry out Works for road purposes on Stone Street, Boxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 11 May 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 5 Feb 2025 at 14:50.

Anglian Water logo
Between
13 and 16 May 2025
Details
View Map
Share
Follow
The Causeway

Anglian Water are proposing to carry out Utility repair and maintenance works on The Causeway, Hitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Feb 2025 at 16:26.


Roadworks Map near to Little Waldingfield, SUDBURY, CO10 0TD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 17 Feb 2025 04:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Little Waldingfield, SUDBURY, CO10 0TD (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)