ROADWORKS SUMMARY
Gifford Close, CM9 6JP
Introduction
View current and future planned roadworks and road closures for Gifford Close, CM9 6JP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Gifford Close, CM9 6JP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Gifford Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Essex County Council are carrying out Highway improvement works on The Causeway, Woodham Walter.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 July 2021 at 13:45 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2024 at 09:03.
11 Dec 2024
Essex County Council are carrying out Highway improvement works on Nounsley Road, Hatfield Peverel.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 October 2024 at 12:53 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 16:02.
28 Oct and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on The Street, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Aug 2024 at 11:32.
28 Oct and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on The Street, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 09:19.
11 Nov and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Wycke Hill Business Park, Maldon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Oct 2024 at 13:49.
11 Nov and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Wycke Hill Business Park, Maldon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 09:14.
21 Dec 2024
Essex County Council are carrying out Highway improvement works on Wycke Hill Business Park, Maldon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 00:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:25.
Monday
Essex County Council are carrying out Highway improvement works on Limebrook Way, Maldon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 00:00 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 11:57.
Monday
Essex County Council are carrying out Highway improvement works on Limebrook Roundabout, Maldon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 00:00 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 12:00.
25 Nov and 14 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Oct 2024 at 19:13.
25 Nov and 14 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 11:34.
14 Dec 2024
Essex County Council are carrying out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 14:11 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 14:16.
2 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:03.
2 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:00.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Hatfield Peverel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 08:39.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Hatfield Peverel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 14:03.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Hatfield Peverel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 10:06.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Green, Wickham Bishops.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 12:53.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Wickham Bishops.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 11:30.
4 and 9 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Curling Tye Lane, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:21.
4 and 9 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Curling Tye Lane, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:00.
4 and 9 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Blue Mill Lane, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:21.
4 and 9 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Blue Mill Lane, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:01.
9 and 13 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Cold Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:51.
9 and 13 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Cold Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:14.
9 and 13 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:51.
9 and 13 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:14.
9 and 13 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Marlpits Road, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:51.
9 and 13 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Marlpits Road, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:14.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on London Road, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 12:10.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Old London Road, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 12:10.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Herbage Park Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:56.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Herbage Park Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:52.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Hill, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:59.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Hill, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:52.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on The Street, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:51.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on The Street, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:52.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:05.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:52.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hoe Mill Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:49.
12 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hoe Mill Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:52.
13 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Old London Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:08.
13 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Old London Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:52.
13 and 17 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Mowden Hall Lane, Hatfield Peverel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 11:24.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on New Hall Lane, Mundon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:26.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on New Hall Lane, Mundon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Mundon Road, Mundon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:24.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Mundon Road, Mundon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Limebrook Way, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:25.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Limebrook Way, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Park Drive, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:18.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Park Drive, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Mundon Road, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 16:09.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Mundon Road, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:22.
19 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Mundon Road, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
6 Jan and 1 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 13:05.
6 Jan and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 12:00.
6 Jan and 1 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 12:40.
6 Jan and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 12:03.
6 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 08:05.
6 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 07:58.
6 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 08:01.
6 Jan and 1 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 12:50.
6 Jan and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 11:55.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 Oct 2024 at 08:29.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 Oct 2024 at 08:47.
6 and 10 Jan 2025
Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 14:34.
11 and 13 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Spital Road, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:40.
11 and 13 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:40.
11 and 13 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Bypass, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.
11 and 13 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Spital Road Roundabout, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.
11 and 13 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Bypass, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:02.
11 and 13 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Bypass, Heybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.
11 and 13 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Heybridge Approach, Heybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.
11 and 13 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Pond Roundabout, Heybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.
11 and 19 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 14:27.
11 and 19 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 10:47.
13 Jan and 8 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:23.
13 Jan and 8 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:23.
13 Jan and 8 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:24.
13 and 16 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on North Hill, Little Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:06.
13 and 16 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on North Hill, Little Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 08:24.
13 and 16 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Worlds End, Hatfield Peverel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:08.
13 and 16 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Worlds End, Hatfield Peverel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 08:54.
20 Jan and 15 Feb 2025
Essex County Council were proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:23.
20 Jan and 15 Feb 2025
Essex County Council were proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:38.
20 Jan and 15 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:58.
20 Jan and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 15:00.
22 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Old Church Road, East Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 10:26.
22 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Old Church Road, East Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 08:13.
27 Jan and 7 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.
27 Jan and 7 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.
27 Jan and 7 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 14:56.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Everest Way, Heybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 15:15.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hillary Close, Heybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 15:10.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hunt Avenue, Heybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 15:17.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Heywood Way, Heybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 15:19.
1 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.
1 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.
1 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 14:57.
3 and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Main Road, Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 15:49.
3 and 7 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 14:50.
3 and 7 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 09:39.
7 Feb and 20 Mar 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 20 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.
7 and 20 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.
7 and 20 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 14:55.
7 and 10 Feb 2025
BT are proposing to carry out Utility asset works on North Hill, Essex, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 12 Nov 2024 at 10:56.
7 and 10 Feb 2025
BT are proposing to carry out Utility asset works on North Hill, Essex, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 22 Nov 2024 at 14:21.
10 and 28 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 11:50.
10 and 28 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 11:20.
10 and 21 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 12 Nov 2024 at 10:45.
15 and 28 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 13:26.
17 and 19 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Wash Lane, Goldhanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:11.
17 and 28 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Ulting Lane, Langford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:03.
21 Feb and 6 Mar 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 12 Nov 2024 at 10:45.
24 Feb and 1 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 13:00.
24 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 08:32.
24 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:05.
Roadworks Map near to Gifford Close, CM9 6JP
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Gifford Close, CM9 6JP (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Nov 2024 - 2 Dec 2024)
(Scheduled: 14 Nov 2024 - 2 Dec 2024)
(Scheduled: 11 Nov 2024 - 21 Dec 2024)
(Scheduled: 27 Nov 2024 - 29 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.