ROADWORKS SUMMARY
Wilkinson Grove, BRAINTREE, CM77 8RB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wilkinson Grove, CM77 8RB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wilkinson Grove, BRAINTREE, CM77 8RB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wilkinson Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Courtauld Road

Cadent Gas are proposing to carry out Utility asset works on Courtauld Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 08:26.

Cadent Gas logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Braintree And Bocking, Braintree.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 13:34.

Cadent Gas logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Braintree And Bocking, Braintree.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 30 May 2025
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Braintree And Bocking, Braintree.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:28.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Gosfield Road

Cadent Gas are proposing to carry out Utility asset works on Gosfield Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Dec 2024 at 09:42.

Cadent Gas logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Cressing Road

Cadent Gas are proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 16:21.

Cadent Gas logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Cressing Road

Cadent Gas are proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Dec 2024 at 22:00.

Cadent Gas logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Cressing Road

Cadent Gas are proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Dec 2024 at 09:17.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Dorewards Avenue

Cadent Gas were proposing to carry out Utility asset works on Dorewards Avenue, Braintree And Bocking, Braintree.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 13:37.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:35.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Collingwood Road

Cadent Gas were proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:37.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Avenue Road

Cadent Gas were proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:27.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
The Avenue

Cadent Gas were proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:22.

Cadent Gas logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Courtauld Road

Cadent Gas were proposing to carry out Utility asset works on Courtauld Road, Braintree And Bocking, Braintree.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:45.

Cadent Gas logo
LONG TERM
Between
3 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out New service connection on Church Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:20.

Cadent Gas logo
LONG TERM
Between
3 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out New service connection on Church Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:57.

Cadent Gas logo
LONG TERM
Until
6 Apr 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are carrying out New service connection on Church Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 13:15 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 13:21.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Chantry Close

Cadent Gas were proposing to carry out Utility asset works on Chantry Close, Braintree And Bocking, Braintree.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:08.

Cadent Gas logo
Between
6 and 26 Feb 2025
Details
View Map
Share
Follow
Gosfield Road

Cadent Gas are proposing to carry out Utility asset works on Gosfield Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 11:24.

Cadent Gas logo
Between
6 and 26 Feb 2025
Details
View Map
Share
Follow
Gosfield Road

Cadent Gas are proposing to carry out Utility asset works on Gosfield Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jan 2025 at 12:45.

Cadent Gas logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Gosfield Road

Cadent Gas are carrying out Utility asset works on Gosfield Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 11:51 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 11:54.

Cadent Gas logo
LONG TERM
Between
10 Feb and 2 Apr 2025
Details
View Map
Share
Guithavon Valley

Cadent Gas were proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 2 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:43.

LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Garden Village Way

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Garden Village Way, Great Notley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 30 Dec 2024 at 09:50.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hollies Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hollies Road, Bradwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Feb 2025 at 10:09.

UK Power Networks Eastern & London logo
Between
14 and 23 Feb 2025
Details
View Map
Share
Follow
Bakers Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bakers Lane, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 15:40.

UK Power Networks Eastern & London logo
Between
14 and 23 Feb 2025
Details
View Map
Share
The Street

UK Power Networks Eastern & London were proposing to carry out Utility asset works on The Street, Black Notley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 23 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 16:22.

UK Power Networks Eastern & London logo
Between
14 and 23 Feb 2025
Details
View Map
Share
Follow
The Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on The Street, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 08:34.

UK Power Networks Eastern & London logo
Between
14 and 23 Feb 2025
Details
View Map
Share
Follow
Church Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Church Road, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 16:01.

UK Power Networks Eastern & London logo
Between
14 and 23 Feb 2025
Details
View Map
Share
Follow
Buck Hill

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Buck Hill, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 15:38.

Essex County Council logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Cranham Road

Essex County Council are proposing to carry out Highway improvement works on Cranham Road, Boreham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Jan 2025 at 14:13.

Essex County Council logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Cranham Road

Essex County Council are proposing to carry out Highway improvement works on Cranham Road, Boreham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 18:49.

Essex County Council logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Waltham Road

Essex County Council were proposing to carry out Remedial works on Waltham Road, Boreham, Chelmsford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 2 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Dec 2024 at 11:27.

Essex County Council logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Waltham Road

Essex County Council are proposing to carry out Highway improvement works on Waltham Road, Boreham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Jan 2025 at 14:27.

Gigaclear logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Bulford Mill Lane

Gigaclear are proposing to carry out Remedial works on Bulford Mill Lane, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 7 Jan 2025 at 09:33.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Courtauld Road

Cadent Gas are proposing to carry out Utility asset works on Courtauld Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 11:00.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Courtauld Road

Cadent Gas are proposing to carry out Utility asset works on Courtauld Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 14:58.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Courtauld Road

Cadent Gas are proposing to carry out Utility asset works on Courtauld Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 12:07.

Essex County Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Church Lane

Essex County Council are proposing to carry out Highway improvement works on Church Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 13:51.

Essex County Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Church Street

Essex County Council are proposing to carry out Highway improvement works on Church Street, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 13:53.

Essex County Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Bovingdon Road

Essex County Council are proposing to carry out Highway improvement works on Bovingdon Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 11:56.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Church Lane

Anglian Water were proposing to carry out Remedial works on Church Lane, Braintree And Bocking, Braintree.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 11:50.

Anglian Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Braintree Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Braintree Road, Cressing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 09:23.

Essex County Council logo
Between
22 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Essex County Council are proposing to carry out Highway improvement works on Mill Lane, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Dec 2024 at 14:51.

Gigaclear logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Bulford Mill Lane

Gigaclear are proposing to carry out Remedial works on Bulford Mill Lane, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 9 Jan 2025 at 12:22.

Cadent Gas logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Phillips Chase

Cadent Gas are proposing to carry out Utility asset works on Phillips Chase, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 09:03.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Bradford Street

Cadent Gas are proposing to carry out Utility asset works on Bradford Street, Braintree And Bocking, Braintree.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 09:55.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Bradford Street

Cadent Gas are proposing to carry out Utility asset works on Bradford Street, Braintree And Bocking, Braintree.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 00:10.

Essex County Council logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Long Green

Essex County Council are proposing to carry out Highway improvement works on Long Green, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 11:05.

Essex County Council logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Long Green

Essex County Council are proposing to carry out Highway improvement works on Long Green, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 09:52.

Essex County Council logo
Between
27 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Panfield Lane

Essex County Council are proposing to carry out Highway improvement works on Panfield Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:28.

Essex County Council logo
Between
27 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Panfield Lane

Essex County Council are proposing to carry out Highway improvement works on Panfield Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Jan 2025 at 14:34.

Essex County Council logo
Between
27 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Panfield Lane

Essex County Council are proposing to carry out Highway improvement works on Panfield Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 13:57.

Essex County Council logo
Between
27 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Panfield Lane

Essex County Council are proposing to carry out Highway improvement works on Panfield Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 07:49.

Cadent Gas logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Guithavon Street

Cadent Gas were proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:48.

Cadent Gas logo
LONG TERM
Between
3 Mar and 10 Oct 2025
Details
View Map
Share
Follow
Braintree Road

Cadent Gas are proposing to carry out Utility asset works on Braintree Road, Gosfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 09:48.

Cadent Gas logo
LONG TERM
Between
3 Mar and 10 Oct 2025
Details
View Map
Share
Follow
Braintree Road

Cadent Gas are proposing to carry out Utility asset works on Braintree Road, Gosfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 11:29.

Cadent Gas logo
LONG TERM
Between
3 Mar and 10 Oct 2025
Details
View Map
Share
Follow
Braintree Road

Cadent Gas are proposing to carry out Utility asset works on Braintree Road, Gosfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 13:30.

Gigaclear logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Ranks Green Road

Gigaclear are proposing to carry out Utility asset works on Ranks Green Road, Fairstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 13 Dec 2024 at 10:40.

Gigaclear logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Ranks Green Road

Gigaclear are proposing to carry out Utility asset works on Ranks Green Road, Fairstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 24 Dec 2024 at 12:17.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Guithavon Road

Cadent Gas were proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
10 Mar and 15 Apr 2025
Details
View Map
Share
Mill Lane

Cadent Gas were proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:06.

Essex County Council logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Boreham Road

Essex County Council are proposing to carry out Highway improvement works on Boreham Road, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Dec 2024 at 07:56.

Affinity Water logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Stevens Lane

Affinity Water are proposing to carry out Remedial works on Stevens Lane, Felsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 3 Jan 2025 at 10:20.

Cadent Gas logo
LONG TERM
Between
10 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Cressing Road

Cadent Gas are proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 10:45.

Cadent Gas logo
LONG TERM
Between
10 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Cressing Road

Cadent Gas are proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 17:24.

Cadent Gas logo
LONG TERM
Between
10 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Cressing Road

Cadent Gas are proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 18:34.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Coggeshall Road

Cadent Gas were proposing to carry out Utility asset works on Coggeshall Road, Braintree And Bocking, Braintree.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 21:56.

Essex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Churchill Road

Essex County Council are proposing to carry out Highway improvement works on Churchill Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 14:31.

Cadent Gas logo
Between
17 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Collingwood Road

Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:10.

Cadent Gas logo
Between
17 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Collingwood Road

Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:44.

Cadent Gas logo
Between
17 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Collingwood Road

Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:23.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:45.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 09:49.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:11.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:44.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 10:17.

Essex County Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Boreham Road

Essex County Council are proposing to carry out Highway improvement works on Boreham Road, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Dec 2024 at 11:07.

Essex County Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Boreham Road

Essex County Council are proposing to carry out Highway improvement works on Boreham Road, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Jan 2025 at 15:36.

Gigaclear logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Bulford Mill Lane

Gigaclear are proposing to carry out Remedial works on Bulford Mill Lane, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 28 Jan 2025 at 09:35.

BT logo
Between
21 and 24 Mar 2025
Details
View Map
Share
Follow
Hatfield Road

BT are proposing to carry out Utility asset works on Hatfield Road, Essex, Terling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 24 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 16 Jan 2025 at 11:55.

BT logo
Between
21 and 24 Mar 2025
Details
View Map
Share
Follow
Hatfield Road

BT are proposing to carry out Utility asset works on Hatfield Road, Essex, Terling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 24 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 Jan 2025 at 17:28.

Cadent Gas logo
LONG TERM
Between
24 Mar and 19 May 2025
Details
View Map
Share
Follow
Guithavon Valley

Cadent Gas are proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:41.

Cadent Gas logo
LONG TERM
Between
24 Mar and 19 May 2025
Details
View Map
Share
Follow
Guithavon Valley

Cadent Gas are proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:29.

Cadent Gas logo
LONG TERM
Between
24 Mar and 19 May 2025
Details
View Map
Share
Guithavon Valley

Cadent Gas were proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 10:35.

Essex County Council logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Great Leighs Bypass Roundabout South

Essex County Council are proposing to carry out Highway improvement works on Great Leighs Bypass Roundabout South, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Jan 2025 at 13:25.

Essex County Council logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Great Leighs Bypass Roundabout South

Essex County Council are proposing to carry out Highway improvement works on Great Leighs Bypass Roundabout South, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 10:24.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Cressing Road Roundabout

Essex County Council are proposing to carry out Highway improvement works on Cressing Road Roundabout, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 17 Jan 2024 at 11:36.

Cadent Gas logo
Between
24 Mar and 10 Apr 2025
Details
View Map
Share
Trinovantian Way

Cadent Gas were proposing to carry out Utility asset works on Trinovantian Way, Braintree And Bocking, Braintree.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 13:57.

Cadent Gas logo
Between
24 Mar and 10 Apr 2025
Details
View Map
Share
East Street

Cadent Gas were proposing to carry out Utility asset works on East Street, Braintree And Bocking, Braintree.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 13:56.

Cadent Gas logo
Between
24 Mar and 10 Apr 2025
Details
View Map
Share
Manor Street

Cadent Gas were proposing to carry out Utility asset works on Manor Street, Braintree And Bocking, Braintree.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 13:55.

Cadent Gas logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Guithavon Street

Cadent Gas were proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:26.

Cadent Gas logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Guithavon Court

Cadent Gas were proposing to carry out Utility asset works on Guithavon Court, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:20.

Cadent Gas logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Coggeshall Road

Cadent Gas were proposing to carry out Utility asset works on Coggeshall Road, Braintree And Bocking, Braintree.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 13:57.

Essex County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 13:05.

Essex County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 16:11.

Essex County Council logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Oak Road

Essex County Council are proposing to carry out Highway improvement works on Oak Road, Rivenhall End, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 10:14.

Anglian Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Church Hill

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Hill, White Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Feb 2025 at 11:15.

Anglian Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Church Lane

Anglian Water are proposing to carry out Remedial works on Church Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 15:49.

UK Power Networks Eastern & London logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Bakers Lane

UK Power Networks Eastern & London are proposing to carry out Remedial works on Bakers Lane, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 09:32.

UK Power Networks Eastern & London logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Bakers Lane

UK Power Networks Eastern & London are proposing to carry out Remedial works on Bakers Lane, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 15:27.

Cadent Gas logo
Between
14 Apr and 13 May 2025
Details
View Map
Share
Follow
Collingwood Road

Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.

Cadent Gas logo
Between
14 Apr and 5 May 2025
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.

Cadent Gas logo
Between
14 Apr and 5 May 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.

Essex County Council logo
Between
14 and 24 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Essex County Council are proposing to carry out Section 50 on Mill Lane, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:08.

Cadent Gas logo
LONG TERM
Between
14 Apr and 19 May 2025
Details
View Map
Share
Follow
Cressing Road

Cadent Gas are proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 11:27.

Cadent Gas logo
LONG TERM
Between
14 Apr and 19 May 2025
Details
View Map
Share
Cressing Road

Cadent Gas were proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 13:58.

Cadent Gas logo
LONG TERM
Between
14 Apr and 1 Aug 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 10:30.

UK Power Networks Eastern & London logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Hollies Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hollies Road, Bradwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jan 2025 at 17:31.

Anglian Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Panfield Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Panfield Lane, Braintree And Bocking, Braintree.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Jan 2025 at 11:19.

Anglian Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Panfield Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Panfield Lane, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 1 Feb 2025 at 20:41.

Cadent Gas logo
Between
18 Apr and 10 May 2025
Details
View Map
Share
Deanery Hill

Cadent Gas were proposing to carry out Utility asset works on Deanery Hill, Bocking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 April 2025 and run through until 10 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 13:58.

Cadent Gas logo
Between
18 Apr and 10 May 2025
Details
View Map
Share
Follow
Deanery Hill

Cadent Gas are proposing to carry out Utility asset works on Deanery Hill, Bocking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 14:21.

Cadent Gas logo
LONG TERM
Between
21 Apr and 28 May 2025
Details
View Map
Share
Follow
Guithavon Street

Cadent Gas are proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:41.

Cadent Gas logo
LONG TERM
Between
21 Apr and 28 May 2025
Details
View Map
Share
Follow
Guithavon Street

Cadent Gas are proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:42.

Cadent Gas logo
LONG TERM
Between
21 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Guithavon Valley

Cadent Gas are proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.

Essex County Council logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Long Green

Essex County Council are proposing to carry out Highway improvement works on Long Green, Cressing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 09:52.

LONG TERM
Between
22 Apr and 2 Jun 2025
Details
View Map
Share
Follow
Garden Village Way

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Garden Village Way, Great Notley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 22 Jan 2025 at 16:37.

Cadent Gas logo
Between
28 Apr and 20 May 2025
Details
View Map
Share
Follow
Guithavon Road

Cadent Gas are proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:43.

Cadent Gas logo
Between
28 Apr and 20 May 2025
Details
View Map
Share
Follow
Guithavon Road

Cadent Gas are proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 12:00.

Cadent Gas logo
Between
28 Apr and 20 May 2025
Details
View Map
Share
Follow
Guithavon Road

Cadent Gas are proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:39.

Cadent Gas logo
LONG TERM
Between
28 Apr and 5 Jun 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:19.

Cadent Gas logo
LONG TERM
Between
28 Apr and 5 Jun 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:38.

Cadent Gas logo
LONG TERM
Between
28 Apr and 5 Jun 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:41.

Anglian Water logo
LONG TERM
Between
28 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Links Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Links Road, Bradwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Feb 2025 at 10:14.

Cadent Gas logo
Between
5 and 23 May 2025
Details
View Map
Share
Cressing Road

Cadent Gas were proposing to carry out Utility asset works on Cressing Road, Braintree And Bocking, Braintree.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 13:59.

Essex County Council logo
Between
5 and 7 May 2025
Details
View Map
Share
Follow
Churchill Road

Essex County Council are proposing to carry out Highway improvement works on Churchill Road, Braintree And Bocking, Braintree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 12:45.

Cadent Gas logo
Between
5 and 23 May 2025
Details
View Map
Share
Follow
Dorewards Avenue

Cadent Gas are proposing to carry out Utility asset works on Dorewards Avenue, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 11:00.

Cadent Gas logo
Between
5 and 23 May 2025
Details
View Map
Share
Follow
Church Street

Cadent Gas are proposing to carry out Utility asset works on Church Street, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 12:00.

Cadent Gas logo
Between
5 and 27 May 2025
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Braintree And Bocking, Braintree.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 11:53.


Roadworks Map near to Wilkinson Grove, BRAINTREE, CM77 8RB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 02:16
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wilkinson Grove, BRAINTREE, CM77 8RB (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks Eastern & London logo
URGENT
  
GOLDINGHAM DRIVE, BRAINTREE AND BOCKING 
(0.9 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Verge - Some carriageway incursion
In Progress
Since: 8 Feb 2025 09:56
(Scheduled: 8 Feb 2025 - 14 Feb 2025)
0.9
Details
Share
Follow
2
Essex County Council logo
URGENT
  
SHAKESPEARE CLOSE, BRAINTREE AND BOCKING 
(0.9 miles)
Essex County Council
Highway repair and maintenance works - Carriageway - No carriageway incursion
Complete
10 Feb 2025 12:00 - 14:16
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.