ROADWORKS SUMMARY
Cornish Hall End, BRAINTREE, CM7 4HH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for CM7 4HH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cornish Hall End, BRAINTREE, CM7 4HH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Between
11 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Bumpstead Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Bumpstead Road, Sturmer.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Sep 2024 at 15:56.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bumpstead Road

Cadent Gas are carrying out Utility repair and maintenance works on Bumpstead Road, Haverhill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 14:19 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 12:23.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Sturmer Road

Cadent Gas are carrying out Utility repair and maintenance works on Sturmer Road, Haverhill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 14:21 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 12:21.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Water Lane

Essex County Council are proposing to carry out Highway improvement works on Water Lane, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Aug 2024 at 09:10.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
Chauntry Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Chauntry Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 26 Sep 2024 at 08:20.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
Chauntry Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Chauntry Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 10:47.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
Mill Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Mill Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 25 Sep 2024 at 15:36.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
Mill Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Mill Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 10:45.

Gigaclear logo
Finishing
Friday
Details
View Map
Share
Little Sampford Road

Gigaclear were proposing to carry out Remedial works on Little Sampford Road, Little Bardfield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 25 Sep 2024 at 13:17.

Gigaclear logo
Finishing
Friday
Details
View Map
Share
Follow
Little Sampford Road

Gigaclear are proposing to carry out Remedial works on Little Sampford Road, Little Bardfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 23 Oct 2024 at 10:23.

Suffolk County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Millfields Way

Suffolk County Council are proposing to carry out Highway improvement works on Millfields Way, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Oct 2024 at 16:01.

Suffolk County Council logo
Finishing
Friday
Details
View Map
Share
Millfields Way

Suffolk County Council were proposing to carry out Highway improvement works on Millfields Way, Haverhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Oct 2024 at 14:43.

Suffolk County Council logo
Finishing
Today
Details
View Map
Share
Follow
Burton End

Suffolk County Council are carrying out Highway improvement works on Burton End, Haverhill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 08:30 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 16 Dec 2024 at 08:53.

Suffolk County Council logo
Finishing
Today
Details
View Map
Share
Follow
Burton End

Suffolk County Council are proposing to carry out Highway improvement works on Burton End, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 4 Nov 2024 at 12:51.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Little Sampford Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Little Sampford Road, Little Bardfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:31.

Suffolk County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Millfields Way

Suffolk County Council are proposing to carry out Highway improvement works on Millfields Way, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 28 Oct 2024 at 11:00.

Anglian Water logo
Between
30 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Walthams Cross

Anglian Water were proposing to carry out Remedial works on Walthams Cross, Great Bardfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 2 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 9 Sep 2024 at 12:33.

Anglian Water logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Haverhill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 14:56.

Anglian Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
The Endway

Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:24.

Anglian Water logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Haverhill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Nov 2024 at 11:49.

Anglian Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
The Endway

Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 08:58.

Essex County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Blois Road

Essex County Council are proposing to carry out Highway improvement works on Blois Road, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jul 2024 at 16:06.

Essex County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Blois Road

Essex County Council are proposing to carry out Highway improvement works on Blois Road, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 09:35.

Essex County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Bardfield Road

Essex County Council are proposing to carry out Highway improvement works on Bardfield Road, Finchingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 11:16.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Fell Road

Anglian Water are proposing to carry out Remedial works on Fell Road, Birdbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 09:27.

Affinity Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Walden Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Walden Road, Radwinter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 12:26.

Affinity Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Walden Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Walden Road, Radwinter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 15:04.

Anglian Water logo
LONG TERM
Between
9 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Haverhill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:25.

Anglian Water logo
LONG TERM
Between
9 Jan and 10 Feb 2025
Details
View Map
Share
Follow
The Endway

Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:19.

Anglian Water logo
LONG TERM
Between
9 Jan and 23 Feb 2025
Details
View Map
Share
Chapel Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 16:17.

Gigaclear logo
Between
10 and 17 Jan 2025
Details
View Map
Share
Follow
Little Sampford Road

Gigaclear are proposing to carry out Remedial works on Little Sampford Road, Little Bardfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 22 Nov 2024 at 11:05.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Anso Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Anso Road, Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 15:00.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Anso Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Anso Road, Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 12:21.

Anglian Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
The Endway

Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:11.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Walthams Cross

Anglian Water are proposing to carry out Remedial works on Walthams Cross, Great Bardfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Sep 2024 at 14:01.

Anglian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Haverhill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:31.

Affinity Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Anso Road

Affinity Water are proposing to carry out Utility asset works on Anso Road, Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:26.

Affinity Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Anso Road

Affinity Water are proposing to carry out Utility asset works on Anso Road, Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 13:01.

Essex County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
High Street

Essex County Council are proposing to carry out Highway improvement works on High Street, Great Bardfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 16:01.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Kedington Road

Essex County Council are proposing to carry out Highway improvement works on Kedington Road, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 08:57.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Kedington Road

Essex County Council are proposing to carry out Highway improvement works on Kedington Road, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 15:40.

Anglian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Chapel Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 16:16.

Anglian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Blois Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Nov 2024 at 09:22.

Anglian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
North Street

Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 08:56.

Anglian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
North Street

Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 14:52.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Finkle Green

Essex County Council are proposing to carry out Highway improvement works on Finkle Green, Birdbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Sep 2024 at 11:22.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Finkle Green

Essex County Council are proposing to carry out Highway improvement works on Finkle Green, Birdbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 3 Oct 2024 at 09:34.

Anglian Water logo
Between
30 Jan and 23 Feb 2025
Details
View Map
Share
Chapel Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:31.

Anglian Water logo
Between
30 Jan and 23 Feb 2025
Details
View Map
Share
Blois Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:33.

Anglian Water logo
Between
30 Jan and 23 Feb 2025
Details
View Map
Share
Blois Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:35.

Anglian Water logo
Between
30 Jan and 23 Feb 2025
Details
View Map
Share
Follow
North Street

Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:29.

Anglian Water logo
Between
30 Jan and 23 Feb 2025
Details
View Map
Share
Chapel Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:35.

Anglian Water logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Chapel Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:33.

Anglian Water logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Blois Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:35.

Cadent Gas logo
Between
7 Feb and 8 Mar 2025
Details
View Map
Share
Follow
North Avenue

Cadent Gas are proposing to carry out Utility asset works on North Avenue, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:00.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Queensway

Cadent Gas are proposing to carry out Utility asset works on Queensway, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:30.

Cadent Gas logo
LONG TERM
Between
14 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Crowland Road

Cadent Gas are proposing to carry out Utility asset works on Crowland Road, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:30.

Suffolk County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Millfields Way

Suffolk County Council are proposing to carry out Highway improvement works on Millfields Way, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 29 Oct 2024 at 12:19.

Cadent Gas logo
Between
21 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Allington Walk

Cadent Gas are proposing to carry out Utility asset works on Allington Walk, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:30.

Cadent Gas logo
LONG TERM
Between
21 Feb and 6 May 2025
Details
View Map
Share
Follow
Eastern Avenue

Cadent Gas are proposing to carry out Utility asset works on Eastern Avenue, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:00.

Anglian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Bumpstead Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Bumpstead Road, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Nov 2024 at 12:03.

Anglian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Bumpstead Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Bumpstead Road, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:17.

Anglian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Haverhill Bypass

Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 10:15.

Anglian Water logo
LONG TERM
Between
28 Feb and 1 Apr 2025
Details
View Map
Share
Haverhill Bypass

Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 1 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 14:15.

Anglian Water logo
LONG TERM
Between
28 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Haverhill Bypass

Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 16:42.

Anglian Water logo
LONG TERM
Between
28 Feb and 1 Apr 2025
Details
View Map
Share
Haverhill Bypass

Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 1 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 16:23.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Castle Lane

Cadent Gas are proposing to carry out Utility asset works on Castle Lane, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:30.

Affinity Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Little Sampford Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Little Sampford Road, Little Bardfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 11 Dec 2024 at 10:48.

Affinity Water logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Anso Road

Affinity Water are proposing to carry out Utility asset works on Anso Road, Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 15:08.

Nexfibre Networks Limited logo
Between
14 and 18 Mar 2025
Details
View Map
Share
Follow
Girton Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Girton Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 11:39.

Cadent Gas logo
Between
14 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Downs Crescent

Cadent Gas are proposing to carry out Utility asset works on Downs Crescent, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:00.


Roadworks Map near to Cornish Hall End, BRAINTREE, CM7 4HH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cornish Hall End, BRAINTREE, CM7 4HH (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.