ROADWORKS SUMMARY
Beech Drive, CHELMSFORD, CM3 6XT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Beech Drive, CM3 6XT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Beech Drive, CHELMSFORD, CM3 6XT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Beech Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
22 Feb 2025
Details
View Map
Share
Follow
Wycke Hill

Essex County Council are carrying out Highway improvement works on Wycke Hill, Maldon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 00:00 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 07:49.

LONG TERM
Between
13 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Maldon Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Nov 2024 at 12:20.

LONG TERM
Between
13 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Maldon Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Dec 2024 at 08:48.

Essex County Council logo
LONG TERM
Until
23 Jul 2026
Details
View Map
Share
Follow
Church Lane

Essex County Council are carrying out Highway repair and maintenance works on Church Lane, Stow Maries.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 16:00 and could run through until 23 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 14:37.

LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Maldon Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 08:00 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Jan 2025 at 09:08.

LONG TERM
Between
27 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Maldon Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Jan 2025 at 13:02.

LONG TERM
Between
27 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Maldon Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Jan 2025 at 10:00.

Essex County Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Kings Road

Essex County Council are proposing to carry out Highway improvement works on Kings Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Dec 2024 at 10:24.

Essex County Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Kings Road

Essex County Council are proposing to carry out Highway improvement works on Kings Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Jan 2025 at 08:42.

Essex County Council logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Kings Road

Essex County Council are carrying out Highway improvement works on Kings Road, Southminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 09:40 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 09:51.

Essex County Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Kings Road

Essex County Council are proposing to carry out Highway improvement works on Kings Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 14:07.

Essex County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 11:29.

Essex County Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 14:14.

Essex County Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Jan 2025 at 08:51.

UK Power Networks Eastern & London logo
Between
17 Feb and 13 Mar 2025
Details
View Map
Share
Ship Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Ship Road, Burnham-on-crouch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 13 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:13.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Providence

UK Power Networks Eastern & London are proposing to carry out New service connection on Providence, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 15:19.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Providence

UK Power Networks Eastern & London are proposing to carry out New service connection on Providence, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Dec 2024 at 10:40.

Essex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Mundon Road

Essex County Council are proposing to carry out Remedial works on Mundon Road, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 17:56.

Cadent Gas logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Silver Street

Cadent Gas are proposing to carry out Utility asset works on Silver Street, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 10:06.

Cadent Gas logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Silver Street

Cadent Gas are proposing to carry out Utility asset works on Silver Street, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:00.

UK Power Networks Eastern & London logo
Between
13 Mar and 10 Apr 2025
Details
View Map
Share
Providence

UK Power Networks Eastern & London were proposing to carry out New service connection on Providence, Burnham-on-crouch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:14.

Cadent Gas logo
LONG TERM
Between
17 Mar and 2 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:55.

Cadent Gas logo
LONG TERM
Between
17 Mar and 2 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:45.

Cadent Gas logo
LONG TERM
Between
17 Mar and 2 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
17 Mar and 2 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Maldon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:47.

Essex County Council logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Hackmans Lane

Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 17:28.

Essex County Council logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Hackmans Lane

Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 13:44.

Essex County Council logo
Between
18 and 27 Mar 2025
Details
View Map
Share
Follow
Fambridge Road

Essex County Council are proposing to carry out Highway improvement works on Fambridge Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 15:42.

Essex County Council logo
Between
18 and 27 Mar 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 15:42.

Essex County Council logo
Between
18 and 27 Mar 2025
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 15:42.

Essex County Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Apton Hall Road

Essex County Council are proposing to carry out Highway improvement works on Apton Hall Road, Stambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Jan 2025 at 14:39.

Essex County Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Apton Hall Road

Essex County Council are proposing to carry out Highway improvement works on Apton Hall Road, Stambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 17 Jan 2025 at 11:40.

Essex County Council logo
Between
19 and 27 Mar 2025
Details
View Map
Share
Follow
Lower Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Feb 2025 at 15:41.

Cadent Gas logo
Between
26 Mar and 8 Apr 2025
Details
View Map
Share
Butt Lane

Cadent Gas were proposing to carry out Utility asset works on Butt Lane, Maldon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 8 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:49.

Cadent Gas logo
Between
26 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Butt Lane

Cadent Gas are proposing to carry out Utility asset works on Butt Lane, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 8 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:27.

Essex County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Fambridge Road

Essex County Council are proposing to carry out Highway improvement works on Fambridge Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Feb 2025 at 15:48.

Essex County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Lower Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Feb 2025 at 15:48.

Essex County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Feb 2025 at 15:48.

Essex County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Follow
Fambridge Road

Essex County Council are proposing to carry out Highway improvement works on Fambridge Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Feb 2025 at 15:48.

Essex County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Follow
Lower Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Feb 2025 at 15:48.

Essex County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Feb 2025 at 15:48.

Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Lower Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Lower Road, Hockley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 14 Jan 2025 at 09:16.

Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Lower Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Lower Road, Hockley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 28 Jan 2025 at 14:10.

Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Lower Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Lower Road, Hockley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 3 Feb 2025 at 10:51.

UK Power Networks Eastern & London logo
Between
17 Apr and 14 May 2025
Details
View Map
Share
Ship Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Ship Road, Burnham-on-crouch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 14 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:15.

Essex County Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Paglesham Road

Essex County Council are proposing to carry out Highway improvement works on Paglesham Road, Stambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 14:07.

Essex County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:20.

Essex County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Lower Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:18.

Essex County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Fambridge Road

Essex County Council are proposing to carry out Highway improvement works on Fambridge Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:18.

Essex County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:19.

Essex County Council logo
Between
26 and 28 Apr 2025
Details
View Map
Share
Lower Burnham Road

Essex County Council were proposing to carry out Remedial works on Lower Burnham Road, Stow Maries.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 April 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 12:18.

Cadent Gas logo
Between
26 Apr and 23 May 2025
Details
View Map
Share
Follow
Silver Street

Cadent Gas are proposing to carry out Utility asset works on Silver Street, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:36.

Cadent Gas logo
Between
26 Apr and 23 May 2025
Details
View Map
Share
Silver Street

Cadent Gas were proposing to carry out Utility asset works on Silver Street, Maldon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 April 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 13:07.

Essex County Council logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Hackmans Lane

Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:25.

Essex County Council logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Hackmans Lane

Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Cold Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:23.

Essex County Council logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Lodge Road

Essex County Council are proposing to carry out Highway repair and maintenance works on Lodge Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 13:49.

UK Power Networks Eastern & London logo
Between
13 May and 10 Jun 2025
Details
View Map
Share
Providence

UK Power Networks Eastern & London were proposing to carry out New service connection on Providence, Burnham-on-crouch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 May 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:15.


Roadworks Map near to Beech Drive, CHELMSFORD, CM3 6XT (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 04:52
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Beech Drive, CHELMSFORD, CM3 6XT (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.