ROADWORKS SUMMARY
Lower Burnham Road, CHELMSFORD, CM3 6HG
Introduction

View current and future planned roadworks and road closures for Lower Burnham Road, CM3 6HG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lower Burnham Road, CHELMSFORD, CM3 6HG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lower Burnham Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
23 Jul 2026
Essex County Council are carrying out Highway repair and maintenance works on Church Lane, Stow Maries.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 January 2025 at 16:00 and could run through until 23 July 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 14:37.
4 Jul 2025
Essex County Council are carrying out Highway improvement works on Ferrers Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 10:02 and could run through until 4 July 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Essex County Council on 12 May 2025 at 10:16.
12 May and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Ferrers Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Essex County Council on 30 Apr 2025 at 09:24.
12 May and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Ferrers Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Essex County Council on 17 Apr 2025 at 09:34.
12 May and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Ferrers Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Essex County Council on 19 Mar 2025 at 14:46.
13 May and 10 Jun 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Providence, Burnham-on-crouch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 May 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:15.
Monday
Essex And Suffolk Water are carrying out New service connection on Gladstone Road, Hockley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:19 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 29 May 2025 at 07:31.
Thursday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Princes Road, Burnham-on-crouch.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:50 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 28 May 2025 at 11:23.
2 and 16 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Latchingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 May 2025 at 14:38.
4 and 10 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Ferrers Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 13:13.
9 and 13 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Ferrers Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Apr 2025 at 10:55.
9 Jun and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Maldon Road, Burnham-on-crouch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:13.
9 Jun and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on King Edward Avenue, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 13:03.
9 Jun and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on King Edward Avenue, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 12:11.
9 Jun and 29 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Maple Way, Burnham-on-crouch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 16:31.
9 Jun and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Maple Way, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 16:30.
9 and 14 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Limebrook Way, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 May 2025 at 13:06.
9 and 12 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Lark Hill Road, Canewdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Feb 2025 at 15:17.
11 and 13 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on North End, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Apr 2025 at 12:59.
11 and 13 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Tillingham Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Apr 2025 at 10:46.
13 and 18 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Ferrers Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Mar 2025 at 10:43.
16 Jun and 3 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Mayland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Apr 2025 at 10:26.
16 Jun and 3 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Latchingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Apr 2025 at 10:26.
16 Jun and 3 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Latchingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 30 Apr 2025 at 12:29.
16 Jun and 3 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Mayland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 30 Apr 2025 at 12:31.
16 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Buckingham Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 08:27.
16 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Buckingham Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 08:08.
19 and 21 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Jun 2025 at 11:12.
19 and 21 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Mar 2025 at 11:40.
23 and 25 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Belvedere Road, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 May 2025 at 12:14.
23 Jun and 21 Jul 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Maldon Road, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Apr 2025 at 09:08.
23 and 27 Jun 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Kings Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 17 Apr 2025 at 09:12.
24 and 26 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Feb 2025 at 09:50.
24 and 26 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Southfield Way, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Feb 2025 at 09:50.
25 and 28 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 May 2025 at 11:01.
25 and 28 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Southfield Way, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 May 2025 at 11:09.
26 Jun and 1 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Station Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Feb 2025 at 08:28.
26 Jun and 1 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on High Street, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 16:34.
30 Jun and 3 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Station Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 May 2025 at 15:30.
30 Jun and 3 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on High Street, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 May 2025 at 15:31.
7 and 11 Jul 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Kings Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 12 May 2025 at 09:10.
7 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 08:26.
7 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Marsh Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 May 2025 at 08:42.
7 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Southminster Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 08:27.
11 and 17 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Alexandra Road, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 16:20.
11 and 17 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Glynn Road, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 16:21.
11 and 17 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Princes Road, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 16:21.
16 and 18 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on West House Estate, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 May 2025 at 08:31.
16 and 18 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on West House Estate, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 14:22.
17 and 19 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Belvedere Road, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 16:26.
21 Jul and 8 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Canewdon Hall Farm, Canewdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 22 May 2025 at 12:01.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Maple Way, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 10:20.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Maple Way, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 10:35.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Maple Way, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 08:53.
21 Jul and 8 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Canewdon Hall Farm, Canewdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 21 May 2025 at 13:57.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on King Edward Avenue, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 10:38.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on King Edward Avenue, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 10:42.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on King Edward Avenue, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 08:39.
21 Jul and 22 Aug 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Mayland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 30 May 2025 at 08:08.
21 Jul and 22 Aug 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Latchingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 May 2025 at 11:33.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Maldon Road, Burnham-on-crouch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 10:25.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Maldon Road, Burnham-on-crouch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 10:41.
21 Jul and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Maldon Road, Burnham-on-crouch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 08:44.
21 Jul and 22 Aug 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Mayland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 May 2025 at 11:33.
21 Jul and 22 Aug 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Mayland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 May 2025 at 09:02.
21 Jul and 22 Aug 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Latchingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 May 2025 at 09:01.
21 Jul and 22 Aug 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Steeple Road, Latchingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 28 May 2025 at 08:29.
29 and 31 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Tillingham Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Mar 2025 at 19:14.
29 and 31 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on North End, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Mar 2025 at 19:16.
30 Jul and 5 Aug 2025
BT are proposing to carry out Utility asset works on Pump Lane, Essex, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 24 Feb 2025 at 16:19.
5 and 11 Aug 2025
Essex And Suffolk Water are proposing to carry out New service connection on Gladstone Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 11 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 15 May 2025 at 08:20.
11 Aug and 3 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 15:29.
11 Aug and 8 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Southend Road, Hockley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 14:34.
11 Aug and 8 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Southend Road, Hockley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 10:34.
11 Aug and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Spa Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 13:20.
11 Aug and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Spa Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:52.
11 and 22 Aug 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Keats Square, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 12 May 2025 at 10:54.
11 and 22 Aug 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Keats Square, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 2 May 2025 at 09:39.
11 Aug and 3 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 13:27.
11 and 16 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Limebrook Way, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Mar 2025 at 14:19.
11 and 13 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Batts Road, Steeple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 23 May 2025 at 15:33.
11 and 15 Aug 2025
Cadent Gas were proposing to carry out New service connection on White Hart Lane, Hawkwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:01.
11 and 13 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Batts Road, Steeple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 13 May 2025 at 11:17.
18 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 10:33.
18 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 11:06.
18 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Marsh Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 10:40.
18 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Marsh Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 11:06.
18 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Southminster Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 10:35.
18 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Southminster Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 11:06.
Roadworks Map near to Lower Burnham Road, CHELMSFORD, CM3 6HG (Loading...)








- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lower Burnham Road, CHELMSFORD, CM3 6HG (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.