ROADWORKS SUMMARY
Nipsells Chase, CHELMSFORD, CM3 6EJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Nipsells Chase, CM3 6EJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Nipsells Chase, CHELMSFORD, CM3 6EJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Nipsells Chase are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
The Street

Essex County Council are proposing to carry out Highway improvement works on The Street, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 09:19.

Essex County Council logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
The Street

Essex County Council are proposing to carry out Highway improvement works on The Street, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Aug 2024 at 11:32.

Essex County Council logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Wycke Hill Business Park

Essex County Council are carrying out Highway improvement works on Wycke Hill Business Park, Maldon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:25.

Essex County Council logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Wycke Hill Business Park

Essex County Council are proposing to carry out Highway improvement works on Wycke Hill Business Park, Maldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 09:14.

Essex County Council logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Wycke Hill Business Park

Essex County Council are proposing to carry out Highway improvement works on Wycke Hill Business Park, Maldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Oct 2024 at 13:49.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kings Road

UK Power Networks Eastern & London are carrying out New service connection on Kings Road, Southminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 12:30 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 09:17.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Limebrook Way

Essex County Council are carrying out Highway improvement works on Limebrook Way, Maldon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 00:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 07:31.

Cadent Gas logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Alamein Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Alamein Road, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 13:02.

Essex County Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Fambridge Road

Essex County Council are proposing to carry out Highway improvement works on Fambridge Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:00.

Essex County Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Fambridge Road

Essex County Council are proposing to carry out Highway improvement works on Fambridge Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:03.

Essex County Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Lower Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:03.

Essex County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:00.

Essex County Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Lower Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:00.

Essex County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:04.

Cadent Gas logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Alamein Road

Cadent Gas are proposing to carry out New service connection on Alamein Road, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:24.

Essex County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:00.

Essex County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:04.

Essex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hackmans Lane

Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Cold Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:51.

Essex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hackmans Lane

Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Cold Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:14.

UK Power Networks Eastern & London logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Old Heath Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Heath Road, Mayland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 13:29.

Essex County Council logo
Between
19 and 21 Dec 2024
Details
View Map
Share
Follow
Mundon Road

Essex County Council are proposing to carry out Highway improvement works on Mundon Road, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 16:09.

Essex County Council logo
Between
19 and 21 Dec 2024
Details
View Map
Share
Follow
Mundon Road

Essex County Council are proposing to carry out Highway improvement works on Mundon Road, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:22.

Essex County Council logo
Between
19 and 21 Dec 2024
Details
View Map
Share
Follow
Park Drive

Essex County Council are proposing to carry out Highway improvement works on Park Drive, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:18.

Essex County Council logo
Between
19 and 21 Dec 2024
Details
View Map
Share
Follow
New Hall Lane

Essex County Council are proposing to carry out Highway improvement works on New Hall Lane, Mundon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:26.

Essex County Council logo
Between
19 and 21 Dec 2024
Details
View Map
Share
Follow
Mundon Road

Essex County Council are proposing to carry out Highway improvement works on Mundon Road, Mundon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:24.

Essex County Council logo
Between
19 and 21 Dec 2024
Details
View Map
Share
Follow
Limebrook Way

Essex County Council are proposing to carry out Highway improvement works on Limebrook Way, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 13:25.

Essex County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Creeksea Lane

Essex County Council are proposing to carry out Highway improvement works on Creeksea Lane, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 10:12.

Essex County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Creeksea Lane

Essex County Council are proposing to carry out Highway improvement works on Creeksea Lane, Burnham-on-crouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 10:58.

LONG TERM
Between
13 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Main Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Main Road, St Lawrence.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 14 Nov 2024 at 15:03.

LONG TERM
Between
13 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Maldon Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 15:14.

Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Street

Essex And Suffolk Water are proposing to carry out Remedial works on The Street, Steeple.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 19 Nov 2024 at 11:29.

Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Street

Essex And Suffolk Water are proposing to carry out Remedial works on The Street, Steeple.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 16:36.

Essex County Council logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Burnham Road

Essex County Council were proposing to carry out Remedial works on Burnham Road, Southminster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:02.

Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
The Endway

Essex And Suffolk Water are proposing to carry out Remedial works on The Endway, Althorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 14 Nov 2024 at 10:19.

Essex County Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 11:29.

Essex County Council logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 11:29.

Essex County Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Kings Road

Essex County Council are proposing to carry out Highway improvement works on Kings Road, Southminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 11:03.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Wash Lane

Essex County Council are proposing to carry out Highway improvement works on Wash Lane, Goldhanger.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 14:29.


Roadworks Map near to Nipsells Chase, CHELMSFORD, CM3 6EJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 14:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Nipsells Chase, CHELMSFORD, CM3 6EJ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.