ROADWORKS SUMMARY
Berry Vale, CHELMSFORD, CM3 5GY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Berry Vale, CM3 5GY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Berry Vale, CHELMSFORD, CM3 5GY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Berry Vale are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
24 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Harrow Road

Cadent Gas are proposing to carry out Utility asset works on Harrow Road, Bowers Gifford And North Benfleet, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 17:51.

Essex County Council logo
LONG TERM
Between
21 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Chelmsford Road

Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, Rawreth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex County Council on 8 Oct 2024 at 13:03.

LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Lower Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Lower Road, Hockley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 09:00 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 14:14.

Essex County Council logo
LONG TERM
Between
24 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Chelmsford Road

Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, Rawreth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 17 Oct 2024 at 10:17.

Essex County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Chelmsford Road

Essex County Council are carrying out Highway improvement works on Chelmsford Road, Rawreth.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 00:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 07:50.

LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Ferry Road

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Ferry Road, Hullbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 14 Aug 2024 at 15:22.

Essex County Council logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
The Street

Essex County Council are proposing to carry out Highway improvement works on The Street, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 09:19.

Essex County Council logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
The Street

Essex County Council are proposing to carry out Highway improvement works on The Street, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Aug 2024 at 11:32.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Southend Arterial Road

Essex County Council were proposing to carry out Remedial works on Southend Arterial Road, Thundersley, Benfleet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 2 Sep 2024 at 18:11.

Cadent Gas logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Dorothy Farm Road

Cadent Gas are carrying out Utility asset works on Dorothy Farm Road, Rayleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:09 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Dorothy Farm Road

Cadent Gas are proposing to carry out Utility asset works on Dorothy Farm Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 15:03.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Dorothy Farm Road

Cadent Gas are proposing to carry out Utility asset works on Dorothy Farm Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 09:50.

Cadent Gas logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Grove Road

Cadent Gas are carrying out Utility asset works on Grove Road, Rayleigh.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:08 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 17:00.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Rayleigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:13.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Rayleigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 13:48.

Essex County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Southend Arterial Road

Essex County Council are carrying out Highway improvement works on Southend Arterial Road, Thundersley, Benfleet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 17:03 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 17:20.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

Essex County Council are proposing to carry out Highway improvement works on Southend Arterial Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 15:53.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

Essex County Council are proposing to carry out Remedial works on Southend Arterial Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 17:50.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Southend Arterial Road

Essex County Council were proposing to carry out Remedial works on Southend Arterial Road, Thundersley, Benfleet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 17:50.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

Essex County Council are proposing to carry out Remedial works on Southend Arterial Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Aug 2024 at 14:54.

Essex County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Arterial Road

Essex County Council are carrying out Highway improvement works on Arterial Road, Rayleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 17:03 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 17:20.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Arterial Road

Essex County Council are proposing to carry out Highway improvement works on Arterial Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Oct 2024 at 13:31.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Arterial Road

Essex County Council are proposing to carry out Highway improvement works on Arterial Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 16:01.

Finishing
Monday
Details
View Map
Share
Follow
Daws Heath Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Daws Heath Road, Rayleigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 09:46 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 12:46.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Abbey Road, Hullbridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 November 2024 at 08:19 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:05.

Finishing
Monday
Details
View Map
Share
Follow
Daws Heath Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Daws Heath Road, Rayleigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 07:02 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 18 Nov 2024 at 15:53.

Cadent Gas logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Ruskin Path

Cadent Gas are carrying out Utility asset works on Ruskin Path, Wickford.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 19 November 2024 at 08:50 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:41.

Essex County Council logo
Between
18 Nov and 4 Dec 2024
Details
View Map
Share
Elm Close

Essex County Council were proposing to carry out Highway improvement works on Elm Close, Rayleigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Aug 2024 at 14:10.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Road

Essex County Council are proposing to carry out Highway improvement works on Southend Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 10:13.

Cadent Gas logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
The Greenway

Cadent Gas are proposing to carry out Utility asset works on The Greenway, Runwell, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:22.

Essex County Council logo
Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Bicknacre Road

Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 15:45.

Essex County Council logo
Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Bicknacre Road

Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 11:34.

Essex County Council logo
Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Bicknacre Road

Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 17 Oct 2024 at 19:13.

Essex County Council logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Main Road

Essex County Council are proposing to carry out Highway improvement works on Main Road, Woodham Ferrers, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 10:58.

Cadent Gas logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Brock Hill, South Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:34.

Essex County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Rectory Road

Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Rochford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 10:49.

Essex County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Rectory Road

Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Rochford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Oct 2024 at 09:09.

Essex County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Rectory Road

Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Rochford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Sep 2024 at 11:20.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:30.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:28.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:28.

Cadent Gas logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Brock Hill, South Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 08:46.

Essex County Council logo
Between
29 Nov and 4 Dec 2024
Details
View Map
Share
Follow
London Road Roundabout

Essex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jun 2024 at 10:41.

Essex County Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Lower Burnham Road

Essex County Council are proposing to carry out Highway improvement works on Lower Burnham Road, Latchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 15:40.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Salcott Crescent

Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:19.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Radwinter Avenue

Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:44.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Radwinter Avenue

Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 16:04.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Radwinter Avenue

Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:19.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Salcott Crescent

Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 09:17.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Salcott Crescent

Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 16:46.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Cranfield Park Road

Essex County Council were proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 15:29.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Cranfield Park Road

Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:30.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Cranfield Park Road

Essex County Council were proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 15:29.

Essex County Council logo
Between
8 and 11 Dec 2024
Details
View Map
Share
Follow
Rayleigh Road

Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:51.

Essex County Council logo
Between
8 and 11 Dec 2024
Details
View Map
Share
Follow
Stadium Way

Essex County Council are proposing to carry out Highway improvement works on Stadium Way, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:51.

Essex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Marlpits Road

Essex County Council are proposing to carry out Highway improvement works on Marlpits Road, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:52.

Essex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hackmans Lane

Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 12:10.

Essex County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Rayleigh Road

Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:34.

Essex County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Stadium Way

Essex County Council are proposing to carry out Highway improvement works on Stadium Way, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:34.

Essex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hackmans Lane

Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Cold Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:52.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Barrie Pavement

Cadent Gas are proposing to carry out Utility asset works on Barrie Pavement, Wickford.

These works are categorised as Major.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:48.

Essex County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Main Road

Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 17:15.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Wickford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:28.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Irvon Hill Road

Cadent Gas are proposing to carry out Utility asset works on Irvon Hill Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 07:00.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Irvon Hill Road

Cadent Gas were proposing to carry out Utility asset works on Irvon Hill Road, Wickford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.

Essex County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Southend Road

Essex County Council are proposing to carry out Highway improvement works on Southend Road, Hockley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 17:14.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Hall Road

Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:55.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Main Road

Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:54.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Southend Road

Essex County Council are proposing to carry out Highway improvement works on Southend Road, Hockley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:54.

Essex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Daws Heath Road

Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 15:45.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Uplands Park Road

Essex County Council are proposing to carry out Highway improvement works on Uplands Park Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 10:14.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Uplands Park Road

Essex County Council are proposing to carry out Highway improvement works on Uplands Park Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:04.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Hockley Road

Essex County Council are proposing to carry out Highway improvement works on Hockley Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:02.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Hockley Road

Essex County Council are proposing to carry out Highway improvement works on Hockley Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 10:14.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:03.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 10:14.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Pan Lane

Essex County Council are proposing to carry out Highway improvement works on Pan Lane, East Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 10:24.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Pan Lane

Essex County Council are proposing to carry out Highway improvement works on Pan Lane, East Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 14:42.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Old Church Road

Essex County Council are proposing to carry out Highway improvement works on Old Church Road, East Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 10:26.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Old Church Road

Essex County Council are proposing to carry out Highway improvement works on Old Church Road, East Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 14:42.

Essex County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Bicknacre Road

Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 14:50.

Essex County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Bicknacre Road

Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 10:35.

Essex County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Middlemead

Essex County Council are proposing to carry out Highway improvement works on Middlemead, South Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:18.

Nexfibre Networks Limited logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Ashingdon Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Ashingdon Road, Hawkwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 15 Nov 2024 at 09:34.


Roadworks Map near to Berry Vale, CHELMSFORD, CM3 5GY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 04:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Berry Vale, CHELMSFORD, CM3 5GY (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Connect Fibre (Fibre Assets) logo
BROUGHTON ROAD, SOUTH WOODHAM FERRERS 
(0.1 miles)
Connect Fibre (Fibre Assets)
New service connection - Footway, Verge - No carriageway incursion
Complete
20 Nov 2024 11:05 - 21 Nov 2024 12:15
0.1
Details
Share
2
BT logo
ANSON CLOSE, ESSEX 
(0.2 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.2
Details
Share
Follow
3
BT logo
ANSON CLOSE, ESSEX 
(0.2 miles)
BT
Utility asset works - Footway - Give and take
In Progress
Since: 20 Nov 2024 12:00
(Scheduled: 19 Nov 2024 - 22 Nov 2024)
0.2
Details
Share
Follow
4
Connect Fibre (Fibre Assets) logo
ANCHOR REACH, SOUTH WOODHAM FERRERS 
(0.3 miles)
Connect Fibre (Fibre Assets)
New service connection - Footway - No carriageway incursion
Complete
20 Nov 2024 08:35 - 21 Nov 2024 12:15
0.3
Details
Share
5
BT logo
INCHBONNIE ROAD, ESSEX 
(0.4 miles)
BT
Utility asset works - Footway, Verge - Give and take
Complete
20 Nov 2024 13:20 - 21 Nov 2024 12:00
0.4
Details
Share
6
BT logo
GANDALFS RIDE, ESSEX 
(0.4 miles)
BT
Utility asset works - Footway - Give and take
In Progress
Since: 20 Nov 2024 08:20
(Scheduled: 19 Nov 2024 - 22 Nov 2024)
0.4
Details
Share
Follow
7
BT logo
INCHBONNIE ROAD, ESSEX 
(0.6 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
In Progress
Since: 20 Nov 2024 14:40
(Scheduled: 20 Nov 2024 - 22 Nov 2024)
0.6
Details
Share
Follow
8
MAJOR
  
FERRY ROAD 
(0.7 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 28 Oct 2024 - 20 Dec 2024)
0.7
Details
Share