ROADWORKS SUMMARY
Lodge Road, CHELMSFORD, CM3 4HG
Introduction
View current and future planned roadworks and road closures for Lodge Road, CM3 4HG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lodge Road, CHELMSFORD, CM3 4HG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lodge Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
31 Mar 2025
Essex County Council are carrying out Highway improvement works on The Causeway, Woodham Walter.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 July 2021 at 13:45 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2024 at 09:03.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 13:05.
22 Feb 2025
Essex County Council are carrying out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 00:00 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 07:49.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 12:40.
22 Feb 2025
Essex County Council are carrying out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 00:00 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 07:49.
Today
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 08:05.
Today
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 07:58.
Today
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 08:01.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 12:50.
22 Feb 2025
Essex County Council are carrying out Highway improvement works on Wycke Hill, Maldon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 00:00 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 07:49.
13 Jan and 8 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:23.
13 Jan and 8 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:23.
13 Jan and 8 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:24.
Monday
Cadent Gas are proposing to carry out Remedial works on Dorset Avenue, Great Baddow, Chelmsford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 08:11.
20 Jan and 15 Feb 2025
Essex County Council were proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:23.
20 Jan and 15 Feb 2025
Essex County Council were proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:38.
20 Jan and 15 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:58.
22 Feb 2025
Essex County Council are carrying out Highway improvement works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 08:35 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Jan 2025 at 08:45.
23 Jul 2026
Essex County Council are carrying out Highway repair and maintenance works on Church Lane, Stow Maries.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 January 2025 at 16:00 and could run through until 23 July 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 14:37.
27 Jan and 7 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.
27 Jan and 7 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.
7 Feb 2025
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 13:05 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 27 Jan 2025 at 13:07.
Tomorrow
Essex County Council are proposing to carry out Remedial works on Limebrook Way, Maldon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Jan 2025 at 16:14.
1 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.
1 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.
1 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 14:57.
3 and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Main Road, Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 11:01.
Thursday
UK Power Networks Eastern & London are proposing to carry out New service connection on Main Road, Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Dec 2024 at 15:07.
3 and 7 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 14:50.
3 and 7 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Bicknacre Road, Bicknacre, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 09:39.
7 Feb and 20 Mar 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 20 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.
7 and 20 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.
7 and 20 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 14:55.
7 and 10 Feb 2025
BT are proposing to carry out Utility asset works on North Hill, Essex, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 12 Nov 2024 at 10:56.
7 and 10 Feb 2025
BT are proposing to carry out Utility asset works on North Hill, Essex, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 29 Nov 2024 at 12:45.
10 and 28 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 11:50.
10 and 28 Feb 2025
Essex County Council were proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 11:50.
10 and 21 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 12 Nov 2024 at 10:45.
11 and 13 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Middlemead, South Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 10:22.
11 and 13 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Middlemead, South Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:32.
15 and 28 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 13:26.
19 and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Dec 2024 at 09:01.
19 and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Runwell, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Dec 2024 at 12:50.
21 Feb and 6 Mar 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 12 Nov 2024 at 10:45.
24 Feb and 1 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 13:00.
24 and 26 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Pan Lane, East Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 15 Jan 2025 at 16:55.
24 and 26 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Old Church Road, East Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 24 Jan 2025 at 14:54.
24 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 08:32.
24 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:05.
24 and 26 Feb 2025
Essex And Suffolk Water were proposing to carry out Permanent reinstatement on Church Street, Great Baddow, Chelmsford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 28 Nov 2024 at 15:42.
3 and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Watery Lane, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 20 Jan 2025 at 15:53.
3 and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Watery Lane, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 14:15.
3 and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Highlands Road, Rawreth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 20 Jan 2025 at 16:25.
3 and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Highlands Road, Rawreth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 13:57.
3 and 5 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on South Hanningfield Road, South Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 19 Dec 2024 at 07:49.
3 and 5 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on South Hanningfield Road, South Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 10 Jan 2025 at 08:37.
3 and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Old Wickford Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:11.
3 and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Old Wickford Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 08:24.
3 and 14 Mar 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Holybread Lane, Little Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 18 Dec 2024 at 15:17.
3 and 14 Mar 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Holybread Lane, Little Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 2 Jan 2025 at 13:11.
5 and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Little Baddow Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Dec 2024 at 14:15.
5 and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Little Baddow Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 17:29.
6 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 11:18.
6 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Runwell, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 11:15.
6 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Jan 2025 at 12:58.
6 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Jan 2025 at 12:58.
6 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Jan 2025 at 12:58.
6 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Sandon, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Jan 2025 at 12:58.
9 and 24 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 19:16.
9 and 24 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Jan 2025 at 16:39.
9 and 24 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Golden Jubilee Way, Wickford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Jan 2025 at 10:50.
9 and 24 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Golden Jubilee Way, Wickford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Jan 2025 at 09:58.
10 and 14 Mar 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on North Hill, Little Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 3 Jan 2025 at 11:14.
17 and 21 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Meadow Road, Rettendon, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 19:28.
17 and 21 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on South View Road, Rettendon, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 19:28.
17 and 21 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Sonters Down, Rettendon, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 19:37.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on A130 New Bypass, Galleywood, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Dec 2024 at 11:17.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Gingerbreadhall Bridge Roundabout, Galleywood, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Jan 2025 at 11:46.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Gingerbreadhall Bridge Roundabout, Galleywood, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 13:32.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Southend Road, Galleywood, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Jan 2025 at 11:39.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Southend Road, Galleywood, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 13:47.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Southend Road, Great Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Jan 2025 at 11:45.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Southend Road, Great Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 13:34.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on North Roundabout, Great Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Jan 2025 at 11:43.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on North Roundabout, Great Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 13:46.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on A12 J A130/a1114 Leave Sw, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Jan 2025 at 09:52.
17 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on A12 J A130/a1114 Leave Sw, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 11:16.
17 and 22 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Aug 2024 at 10:16.
17 and 20 Mar 2025
Essex County Council were proposing to carry out Highway improvement works on A130 New Bypass, Galleywood, Chelmsford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Dec 2024 at 11:41.
17 and 20 Mar 2025
Essex County Council were proposing to carry out Highway improvement works on Essex Yeomanry Way, Great Baddow, Chelmsford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 09:54.
17 and 21 Mar 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on North Hill, Little Baddow, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 17 Jan 2025 at 14:33.
18 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 13:44.
18 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 17:28.
7 and 10 Apr 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Main Road, Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jan 2025 at 10:44.
8 and 10 Apr 2025
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Oak Farm Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 14 Jan 2025 at 09:04.
14 and 18 Apr 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Bryants Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 27 Jan 2025 at 16:45.
14 and 18 Apr 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Bryants Lane, Woodham Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 28 Jan 2025 at 07:45.
17 and 21 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Jan 2025 at 10:02.
26 and 28 Apr 2025
Essex County Council were proposing to carry out Remedial works on Lower Burnham Road, Stow Maries.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 April 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 12:18.
27 and 29 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Jan 2025 at 10:17.
27 and 29 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Jan 2025 at 12:35.
27 and 29 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Sandon, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Jan 2025 at 12:20.
28 Apr and 1 May 2025
Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Cold Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:23.
28 Apr and 1 May 2025
Essex County Council are proposing to carry out Highway improvement works on Hackmans Lane, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:25.
28 Apr and 1 May 2025
Essex County Council are proposing to carry out Highway improvement works on Marlpits Road, Purleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:23.
29 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 14:30.
29 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Old London Road, Danbury, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 14:44.
29 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Herbage Park Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:30.
29 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Church Hill, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:30.
29 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on The Street, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:29.
29 Apr and 1 May 2025
Essex County Council are proposing to carry out Highway improvement works on Curling Tye Lane, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:11.
29 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:31.
29 Apr and 1 May 2025
Essex County Council are proposing to carry out Highway improvement works on Blue Mill Lane, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:11.
29 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Hoe Mill Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:28.
30 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Old London Road, Woodham Walter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 16:17.
Roadworks Map near to Lodge Road, CHELMSFORD, CM3 4HG (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lodge Road, CHELMSFORD, CM3 4HG (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.