ROADWORKS SUMMARY
The Street, CHELMSFORD, CM3 2DW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Street, CM3 2DW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Street, CHELMSFORD, CM3 2DW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
The Causeway

Essex County Council are carrying out Highway improvement works on The Causeway, Woodham Walter.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 July 2021 at 13:45 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2024 at 09:03.

National Highways logo
LONG TERM
Until
31 Jul 2026
Details
View Map
Share
Follow
Hatfield Road Southbound Slip To A12

National Highways are carrying out Works for road purposes on Hatfield Road Southbound Slip To A12, Witham Town, Witham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2024 at 00:00 and could run through until 31 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Jul 2024 at 06:46.

Essex County Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Nounsley Road

Essex County Council are carrying out Highway improvement works on Nounsley Road, Hatfield Peverel.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 12:53 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 16:05.

Essex County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Wycke Hill Business Park

Essex County Council are proposing to carry out Highway improvement works on Wycke Hill Business Park, Maldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex County Council on 8 Oct 2024 at 13:49.

Essex County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Wycke Hill Business Park

Essex County Council are proposing to carry out Highway improvement works on Wycke Hill Business Park, Maldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 09:14.

Essex County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Wycke Hill Business Park

Essex County Council are carrying out Highway improvement works on Wycke Hill Business Park, Maldon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:25.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Eastways

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eastways, Witham Town, Witham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:37.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Eastways

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eastways, Witham Town, Witham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 10:10.

Gigaclear logo
Finishing
Monday
Details
View Map
Share
Follow
Henry Dixon Road

Gigaclear are proposing to carry out Remedial works on Henry Dixon Road, Rivenhall End, Witham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 5 Dec 2024 at 08:31.

Gigaclear logo
Finishing
Monday
Details
View Map
Share
Follow
Henry Dixon Road

Gigaclear are carrying out Remedial works on Henry Dixon Road, Rivenhall End, Witham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 08:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 5 Dec 2024 at 09:05.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
London Road

Essex County Council are proposing to carry out Highway improvement works on London Road, Danbury, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 19:14.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Old London Road

Essex County Council are proposing to carry out Highway improvement works on Old London Road, Danbury, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 19:16.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Herbage Park Road

Essex County Council are proposing to carry out Highway improvement works on Herbage Park Road, Woodham Walter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:56.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Church Hill

Essex County Council are proposing to carry out Highway improvement works on Church Hill, Woodham Walter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:59.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
The Street

Essex County Council are proposing to carry out Highway improvement works on The Street, Woodham Walter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:51.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Rectory Road

Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Woodham Walter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:05.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Hoe Mill Road

Essex County Council are proposing to carry out Highway improvement works on Hoe Mill Road, Woodham Walter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:49.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Old London Road

Essex County Council are proposing to carry out Highway improvement works on Old London Road, Woodham Walter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 11:08.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Chelmer Village Way

Essex County Council are proposing to carry out Highway improvement works on Chelmer Village Way, Chelmer Village, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:10.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Brook End Road South

BT are proposing to carry out Utility asset works on Brook End Road South, Essex, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Sep 2024 at 13:47.

Essex County Council logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Conduit Lane

Essex County Council are proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 13:05.

Essex County Council logo
LONG TERM
Between
6 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Conduit Lane

Essex County Council are proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 12:00.

Essex County Council logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 12:40.

Essex County Council logo
LONG TERM
Between
6 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 12:03.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Maldon Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 08:05.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Tom Tit Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 07:58.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Post Office Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 23 Oct 2024 at 08:01.

Essex County Council logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Wycke Hill

Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 12:50.

Essex County Council logo
LONG TERM
Between
6 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Wycke Hill

Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 11:55.

Essex County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Barn Green

Essex County Council are proposing to carry out Highway improvement works on Barn Green, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 18 Sep 2024 at 09:45.

Essex County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Barn Green

Essex County Council are proposing to carry out Highway improvement works on Barn Green, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 11:27.

Essex County Council logo
LONG TERM
Between
6 Jan and 29 Mar 2025
Details
View Map
Share
Follow
White Hart Lane

Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 10 Sep 2024 at 18:47.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Maypole Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 16 Oct 2024 at 08:29.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Maypole Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 16 Oct 2024 at 08:47.

Between
6 and 10 Jan 2025
Details
View Map
Share
Maypole Road

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 14:34.

Essex County Council logo
LONG TERM
Between
6 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Hatfield Road Southbound Slip To A12

Essex County Council are proposing to carry out Highway improvement works on Hatfield Road Southbound Slip To A12, Witham Town, Witham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 11:19.

UK Power Networks Eastern & London logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Eastways

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eastways, Witham Town, Witham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 11:11.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Boreham Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Boreham Road, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 12 Sep 2024 at 14:37.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Spital Road

Essex County Council are proposing to carry out Highway improvement works on Spital Road, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:40.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Wycke Hill

Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:40.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Maldon Bypass

Essex County Council are proposing to carry out Highway improvement works on Maldon Bypass, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Spital Road Roundabout

Essex County Council are proposing to carry out Highway improvement works on Spital Road Roundabout, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Maldon Bypass

Essex County Council are proposing to carry out Highway improvement works on Maldon Bypass, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:02.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Maldon Bypass

Essex County Council are proposing to carry out Highway improvement works on Maldon Bypass, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Dec 2024 at 10:09.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Maldon Bypass

Essex County Council are proposing to carry out Highway improvement works on Maldon Bypass, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Heybridge Approach

Essex County Council are proposing to carry out Highway improvement works on Heybridge Approach, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.

Essex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Pond Roundabout

Essex County Council are proposing to carry out Highway improvement works on Pond Roundabout, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 15:39.

Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Maypole Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 14:27.

Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Maypole Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Great Totham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 10:47.

Essex County Council logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Conduit Lane

Essex County Council are proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:23.

Essex County Council logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:23.

Essex County Council logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Wycke Hill

Essex County Council are proposing to carry out Highway improvement works on Wycke Hill, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 13:24.

Essex County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
North Hill

Essex County Council are proposing to carry out Highway improvement works on North Hill, Little Baddow, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:06.

Essex County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
North Hill

Essex County Council are proposing to carry out Highway improvement works on North Hill, Little Baddow, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 08:24.

Essex County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Worlds End

Essex County Council are proposing to carry out Highway improvement works on Worlds End, Hatfield Peverel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:08.

Essex County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Worlds End

Essex County Council are proposing to carry out Highway improvement works on Worlds End, Hatfield Peverel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 08:54.

Essex County Council logo
Between
20 Jan and 15 Feb 2025
Details
View Map
Share
Conduit Lane

Essex County Council were proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:23.

Essex County Council logo
Between
20 Jan and 15 Feb 2025
Details
View Map
Share
Conduit Lane

Essex County Council were proposing to carry out Highway improvement works on Conduit Lane, Woodham Mortimer.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:38.

Essex County Council logo
Between
20 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Post Office Road

Essex County Council are proposing to carry out Highway improvement works on Post Office Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:58.

Essex County Council logo
LONG TERM
Between
20 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Post Office Road

Essex County Council are proposing to carry out Highway improvement works on Post Office Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Nov 2024 at 12:10.

Essex County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
London Road

Essex County Council are proposing to carry out Highway improvement works on London Road, Danbury, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 18:35.

Essex County Council logo
Between
20 Jan and 13 Feb 2025
Details
View Map
Share
Follow
White Hart Lane

Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Springfield, Chelmsford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Dec 2024 at 08:23.

Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Blunts Hall Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Blunts Hall Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 11:59.

Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Blunts Hall Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Blunts Hall Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 10:16.

Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Post Office Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.

Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Post Office Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.

Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Post Office Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 14:56.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Everest Way

Essex County Council are proposing to carry out Highway improvement works on Everest Way, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 15:15.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Hillary Close

Essex County Council are proposing to carry out Highway improvement works on Hillary Close, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 15:10.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Hunt Avenue

Essex County Council are proposing to carry out Highway improvement works on Hunt Avenue, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 15:17.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Heywood Way

Essex County Council are proposing to carry out Highway improvement works on Heywood Way, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 15:19.

Essex County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
White Hart Lane

Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Dec 2024 at 14:05.

Essex County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Colchester Road

Essex County Council are proposing to carry out Highway improvement works on Colchester Road, Boreham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Dec 2024 at 14:05.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Braxted Park Road

Essex County Council are proposing to carry out Highway improvement works on Braxted Park Road, Great Braxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 09:00.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Braxted Road

Essex County Council are proposing to carry out Highway improvement works on Braxted Road, Rivenhall, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 11:03.

Between
1 and 14 Feb 2025
Details
View Map
Share
Follow
Maldon Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.

Between
1 and 14 Feb 2025
Details
View Map
Share
Follow
Maldon Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.

Between
1 and 14 Feb 2025
Details
View Map
Share
Follow
Maldon Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 14:57.

Essex County Council logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Pump Lane

Essex County Council are proposing to carry out Highway improvement works on Pump Lane, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Aug 2024 at 09:20.

Essex County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Guithavon Road

Essex County Council are proposing to carry out Highway improvement works on Guithavon Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 14:09.

Essex County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Guithavon Road

Essex County Council are proposing to carry out Highway improvement works on Guithavon Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 08:45.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Collingwood Road

Cadent Gas were proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:37.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Avenue Road

Cadent Gas were proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:27.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
The Avenue

Cadent Gas were proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:22.

LONG TERM
Between
7 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Tom Tit Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 20 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 14:56.

Between
7 and 20 Feb 2025
Details
View Map
Share
Follow
Tom Tit Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:10.

Between
7 and 20 Feb 2025
Details
View Map
Share
Follow
Tom Tit Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 14:55.

BT logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
North Hill

BT are proposing to carry out Utility asset works on North Hill, Essex, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Nov 2024 at 10:56.

BT logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
North Hill

BT are proposing to carry out Utility asset works on North Hill, Essex, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 29 Nov 2024 at 12:45.

Essex County Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 11:50.

Essex County Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Maldon Road

Essex County Council were proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 11:50.

Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Post Office Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Post Office Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 12 Nov 2024 at 10:45.

Cadent Gas logo
LONG TERM
Between
10 Feb and 2 Apr 2025
Details
View Map
Share
Guithavon Valley

Cadent Gas were proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 2 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:43.

Essex County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Oak Road

Essex County Council are proposing to carry out Highway improvement works on Oak Road, Rivenhall End, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 11:09.

Between
15 and 28 Feb 2025
Details
View Map
Share
Follow
Maldon Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 13:26.

Essex County Council logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
White Hart Lane

Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:06.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Cut A Thwart Lane

Essex County Council are proposing to carry out Highway improvement works on Cut A Thwart Lane, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 14:49.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Cut A Thwart Lane

Essex County Council are proposing to carry out Highway improvement works on Cut A Thwart Lane, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Dec 2024 at 11:01.

Essex County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Ulting Lane

Essex County Council are proposing to carry out Highway improvement works on Ulting Lane, Langford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 11:45.

Essex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Essex Regiment Way

Essex County Council are proposing to carry out Highway improvement works on Essex Regiment Way, Broomfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:39.

Essex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Essex Regiment Way

Essex County Council are proposing to carry out Highway improvement works on Essex Regiment Way, Broomfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 15:01.

Essex County Council logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Church Road

Essex County Council are proposing to carry out Remedial works on Church Road, Hatfield Peverel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 09:45.

Essex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Essex Regiment Way

Essex County Council are proposing to carry out Highway improvement works on Essex Regiment Way, Little Waltham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Dec 2024 at 14:19.

Between
21 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Tom Tit Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tom Tit Lane, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 12 Nov 2024 at 10:45.

Anglian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Danbury, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 08:32.

Anglian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Danbury, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:05.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Brook End Road South

BT are proposing to carry out Utility asset works on Brook End Road South, Essex, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Nov 2024 at 15:43.

Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Holybread Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Holybread Lane, Little Baddow, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 9 Dec 2024 at 08:11.

Cadent Gas logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Guithavon Street

Cadent Gas were proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:48.

Essex County Council logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Little Baddow Road

Essex County Council are proposing to carry out Highway improvement works on Little Baddow Road, Woodham Walter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 14:29.

Essex County Council logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Everest Way

Essex County Council are proposing to carry out Highway improvement works on Everest Way, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 13:19.

Essex County Council logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Hillary Close

Essex County Council are proposing to carry out Highway improvement works on Hillary Close, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 13:19.

Essex County Council logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Hunt Avenue

Essex County Council are proposing to carry out Highway improvement works on Hunt Avenue, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 13:20.

Essex County Council logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Heywood Way

Essex County Council are proposing to carry out Highway improvement works on Heywood Way, Heybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 13:20.

Gigaclear logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Ranks Green Road

Gigaclear are proposing to carry out Utility asset works on Ranks Green Road, Fairstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 13 Dec 2024 at 10:40.

Between
6 and 12 Mar 2025
Details
View Map
Share
Follow
Leighs Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Leighs Road, Little Waltham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 12 Dec 2024 at 07:56.

Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
North Hill

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on North Hill, Little Baddow, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 16 Dec 2024 at 08:19.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Guithavon Road

Cadent Gas were proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
10 Mar and 15 Apr 2025
Details
View Map
Share
Mill Lane

Cadent Gas were proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:06.

Essex County Council logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Boreham Road

Essex County Council are proposing to carry out Highway improvement works on Boreham Road, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 13:46.

Essex County Council logo
Between
12 Mar and 10 Apr 2025
Details
View Map
Share
Follow
White Hart Lane

Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Springfield, Chelmsford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Dec 2024 at 08:23.

Essex County Council logo
Between
17 and 22 Mar 2025
Details
View Map
Share
Follow
Maldon Road

Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Woodham Mortimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Aug 2024 at 10:16.

Cadent Gas logo
LONG TERM
Between
17 Mar and 2 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:55.

Cadent Gas logo
LONG TERM
Between
17 Mar and 2 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Maldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:45.

Cadent Gas logo
Between
17 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Collingwood Road

Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:10.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:45.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:44.


Roadworks Map near to The Street, CHELMSFORD, CM3 2DW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:21
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Street, CHELMSFORD, CM3 2DW (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
THE STREET, ESSEX 
(0.1 miles)
BT
Utility asset works - Footway - Multi-way signals
In Progress
Since: 16 Dec 2024 11:30
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.1
Details
Share
Follow
2
Anglian Water logo
STATION ROAD 
(0.2 miles)
Anglian Water
Utility repair and maintenance works - Footway - Give and take
Cancelled
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.2
Details
Share
3
Anglian Water logo
WILLOW CRESCENT 
(0.3 miles)
Anglian Water
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.