ROADWORKS SUMMARY
Strawbrook Hill, CHELMSFORD, CM3 1LX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Strawbrook Hill, CM3 1LX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Strawbrook Hill, CHELMSFORD, CM3 1LX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Strawbrook Hill are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Medley Road

Cadent Gas were proposing to carry out Utility asset works on Medley Road, Rayne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 12:03.

Essex County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Chignal Road

Essex County Council are proposing to carry out Highway improvement works on Chignal Road, Chignal Smealy, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 21 November 2024. The works will impact the cycleway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex County Council on 10 Sep 2024 at 16:52.

Essex County Council logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Chelmer Road

Essex County Council are carrying out Highway improvement works on Chelmer Road, Chelmer Village, Chelmsford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:00 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 10:28.

Until
29 Nov 2024
Details
View Map
Share
Follow
Banters Lane

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Banters Lane, Great Leighs, Chelmsford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 14:00 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 18 Nov 2024 at 14:25.

Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Banters Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Banters Lane, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 23 Aug 2024 at 09:07.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Garnetts Lane

Affinity Water are carrying out Utility repair and maintenance works on Garnetts Lane, Felsted.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 14:44 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 13:42.

Anglian Water logo
Wednesday
Details
View Map
Share
Notley Road

Anglian Water carried out Utility repair and maintenance works on Notley Road, Braintree And Bocking, Braintree.

The road was closed for some or all of the period.

The works were originally planned between 21 Nov 2024 and 27 Nov 2024 and were actually completed on 21 Nov 2024 between 08:00 and 17:45. The works impacted the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 18:25.

Essex County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Cranham Road

Essex County Council are carrying out Highway improvement works on Cranham Road, Boreham, Chelmsford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 17:55 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 18:01.

Essex County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Cranham Road

Essex County Council are proposing to carry out Highway improvement works on Cranham Road, Boreham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 16:25.

Essex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Cranham Road

Essex County Council are proposing to carry out Highway improvement works on Cranham Road, Boreham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Oct 2024 at 11:01.

Essex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Cranham Road

Essex County Council are proposing to carry out Highway improvement works on Cranham Road, Boreham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Oct 2024 at 11:28.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Braintree Road

BT are proposing to carry out Utility asset works on Braintree Road, Essex, Terling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 14 Aug 2024 at 11:11.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Onslow Green

Affinity Water were proposing to carry out Utility repair and maintenance works on Onslow Green, Barnston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 29 Aug 2024 at 08:07.

Essex County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Essex Regiment Way

Essex County Council are proposing to carry out Highway improvement works on Essex Regiment Way, Little Waltham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:29.

Essex County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Essex Regiment Way

Essex County Council are proposing to carry out Highway improvement works on Essex Regiment Way, Little Waltham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 08:56.

Essex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Essex Regiment Way

Essex County Council are proposing to carry out Highway improvement works on Essex Regiment Way, Broomfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:29.

Essex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Essex Regiment Way

Essex County Council are proposing to carry out Highway improvement works on Essex Regiment Way, Broomfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 09:02.

Affinity Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Stebbing Road

Affinity Water are proposing to carry out Utility asset works on Stebbing Road, Felsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 10:21.

Affinity Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Stebbing Road

Affinity Water are proposing to carry out Utility asset works on Stebbing Road, Felsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 16 Oct 2024 at 10:57.

Affinity Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Parsonage Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Parsonage Lane, Barnston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 12:46.

Affinity Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Parsonage Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Parsonage Lane, Barnston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 10:02.

Affinity Water logo
Between
2 and 5 Jan 2025
Details
View Map
Share
Follow
Braintree Road

Affinity Water are proposing to carry out Utility asset works on Braintree Road, Felsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 10:09.

Affinity Water logo
Between
2 and 5 Jan 2025
Details
View Map
Share
Follow
Braintree Road

Affinity Water are proposing to carry out Utility asset works on Braintree Road, Felsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 15:46.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Boreham Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Boreham Road, Great Leighs, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 12 Sep 2024 at 14:37.

Essex County Council logo
LONG TERM
Between
6 Jan and 29 Mar 2025
Details
View Map
Share
Follow
White Hart Lane

Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 10 Sep 2024 at 18:47.

Essex County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Barn Green

Essex County Council are proposing to carry out Highway improvement works on Barn Green, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 11:27.

Essex County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Barn Green

Essex County Council are proposing to carry out Highway improvement works on Barn Green, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 18 Sep 2024 at 09:45.

Electricity Network Company logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Woodhouse Lane

Electricity Network Company are proposing to carry out Utility asset works on Woodhouse Lane, Little Waltham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 10:10.

Electricity Network Company logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
North Court Road

Electricity Network Company are proposing to carry out Utility asset works on North Court Road, Little Waltham, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 10:08.

Essex County Council logo
Between
20 Jan and 13 Feb 2025
Details
View Map
Share
Follow
White Hart Lane

Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Springfield, Chelmsford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 16:38.

Essex County Council logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Pump Lane

Essex County Council are proposing to carry out Highway improvement works on Pump Lane, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Aug 2024 at 09:20.

Affinity Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Stebbing Road

Affinity Water are proposing to carry out Utility asset works on Stebbing Road, Felsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 11:14.

UK Power Networks Eastern & London logo
Between
14 and 23 Feb 2025
Details
View Map
Share
Follow
Buck Hill

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Buck Hill, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 14:32.

UK Power Networks Eastern & London logo
Between
14 and 23 Feb 2025
Details
View Map
Share
Follow
Church Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Church Road, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 14:10.

UK Power Networks Eastern & London logo
Between
14 and 23 Feb 2025
Details
View Map
Share
Follow
Bakers Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bakers Lane, Black Notley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 14:37.

Essex County Council logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
White Hart Lane

Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Springfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:06.


Roadworks Map near to Strawbrook Hill, CHELMSFORD, CM3 1LX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Strawbrook Hill, CHELMSFORD, CM3 1LX (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MAIN ROAD, GREAT LEIGHS 
(0.5 miles)
BT
Utility asset works - Footway, Carriageway - Priority working
In Progress
Since: 20 Nov 2024 19:00
(Scheduled: 20 Nov 2024 - 23 Nov 2024)
0.5
Details
Share
Follow
2
BT logo
STRAWBROOK HILL, LITTLE WALTHAM 
(0.6 miles)
BT
Utility asset works - Carriageway, Verge - Two-way signals
In Progress
Since: 18 Nov 2024 19:00
(Scheduled: 18 Nov 2024 - 22 Nov 2024)
0.6
Details
Share
Follow
3
Gigaclear logo
SCHOOL LANE, GREAT LEIGHS 
(0.9 miles)
Gigaclear
Utility asset works - Footway - Give and take
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.