ROADWORKS SUMMARY
Sibleys Lane, BISHOP'S STORTFORD, CM22 6FH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Sibleys Lane, CM22 6FH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Sibleys Lane, BISHOP'S STORTFORD, CM22 6FH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sibleys Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Bardfield Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Bardfield Road, Thaxted.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 30 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 11:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Bardfield Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Bardfield Road, Thaxted.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 16:09.

Electricity Network Company logo
Finishing
Tuesday
Details
View Map
Share
Follow
Forest Hall Road

Electricity Network Company are carrying out Utility asset works on Forest Hall Road, Stansted.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:00 and could run through until 3 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 27 Nov 2024 at 12:10.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Cambridge Road

Cadent Gas are proposing to carry out Utility asset works on Cambridge Road, Quendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:50.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Rickling Green Road

Cadent Gas were proposing to carry out Utility asset works on Rickling Green Road, Rickling Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 16:43.

Cadent Gas logo
Between
25 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Rickling Green Road

Cadent Gas are proposing to carry out Utility asset works on Rickling Green Road, Rickling Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:57.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Cambridge Road

Cadent Gas were proposing to carry out Utility asset works on Cambridge Road, Quendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 16:46.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Lodge Road

BT are carrying out Utility asset works on Lodge Road, Essex, Henham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 09:42 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 27 Nov 2024 at 12:42.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lodge Road

BT are proposing to carry out Utility asset works on Lodge Road, Essex, Henham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 6 Sep 2024 at 11:59.

BT logo
Finishing
Friday
Details
View Map
Share
Chickney Road

BT were proposing to carry out Utility asset works on Chickney Road, Debden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Sep 2024 at 12:07.

Gigaclear logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Bentfield Green

Gigaclear were proposing to carry out Utility asset works on Bentfield Green, Stansted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 22 Nov 2024 at 09:49.

Affinity Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Pepples Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Pepples Lane, Wimbish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 15:39.

Gigaclear logo
Between
11 and 20 Dec 2024
Details
View Map
Share
Follow
Mill End Green Road

Gigaclear are proposing to carry out Remedial works on Mill End Green Road, Great Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 8 Oct 2024 at 12:48.

Gigaclear logo
Between
11 and 20 Dec 2024
Details
View Map
Share
Follow
Mill End Green Road

Gigaclear are proposing to carry out Remedial works on Mill End Green Road, Great Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 14 Oct 2024 at 14:03.

Essex County Council logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Church Road

Essex County Council are proposing to carry out Highway improvement works on Church Road, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:16.

Essex County Council logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Church Road

Essex County Council are proposing to carry out Highway improvement works on Church Road, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 11:11.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Stansted Road

Cadent Gas are proposing to carry out Utility asset works on Stansted Road, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:38.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Stansted Road

Cadent Gas were proposing to carry out Utility asset works on Stansted Road, Stansted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 15:12.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Lower Street

Cadent Gas are proposing to carry out Utility asset works on Lower Street, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:02.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Grove Hill

Cadent Gas are proposing to carry out Utility asset works on Grove Hill, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Quendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:31.

Affinity Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Green Street

Affinity Water are proposing to carry out Utility asset works on Green Street, Elsenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 14:18.

Affinity Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Green Street

Affinity Water are proposing to carry out Utility asset works on Green Street, Elsenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Nov 2024 at 09:46.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Grove Hill

Cadent Gas were proposing to carry out Utility asset works on Grove Hill, Stansted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 15:02.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Duton Hill Road

Affinity Water are proposing to carry out Utility asset works on Duton Hill Road, Great Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 13:09.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Duton Hill Road

Affinity Water are proposing to carry out Utility asset works on Duton Hill Road, Great Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 15:51.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Duton Hill Road

Affinity Water are proposing to carry out Utility asset works on Duton Hill Road, Great Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 15:02.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brick End Lane

BT are proposing to carry out Utility asset works on Brick End Lane, Broxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 16 Oct 2024 at 18:08.

Cadent Gas logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Cambridge Road

Cadent Gas are proposing to carry out Utility asset works on Cambridge Road, Quendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:36.

UK Power Networks Eastern & London logo
Between
15 and 18 Jan 2025
Details
View Map
Share
Follow
Burton End Road

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Burton End Road, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 18 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 16:24.

Gigaclear logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Bentfield Green

Gigaclear are proposing to carry out Utility asset works on Bentfield Green, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 11 Nov 2024 at 14:00.

Gigaclear logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Bentfield Green

Gigaclear were proposing to carry out Utility asset works on Bentfield Green, Stansted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 3 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 2 Oct 2024 at 15:35.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Newport.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:15.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Dunmow Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunmow Road, Great Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Nov 2024 at 16:25.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Frambury Lane

Cadent Gas were proposing to carry out Utility asset works on Frambury Lane, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 08:22.

Affinity Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Chickney Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Chickney Road, Debden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 11 Nov 2024 at 16:14.

Affinity Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Chickney Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Chickney Road, Debden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 14:51.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Station Road

Cadent Gas were proposing to carry out Utility asset works on Station Road, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 16:09.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 14:02.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Frambury Lane

Cadent Gas were proposing to carry out Utility asset works on Frambury Lane, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:07.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 16:31.

Affinity Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Thaxted Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Thaxted Road, Wimbish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 10:07.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Stansted Road

Cadent Gas are proposing to carry out Utility asset works on Stansted Road, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:48.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Stansted Road

Cadent Gas are proposing to carry out Utility asset works on Stansted Road, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:55.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Grove Hill

Cadent Gas are proposing to carry out Utility asset works on Grove Hill, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:54.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Grove Hill

Cadent Gas are proposing to carry out Utility asset works on Grove Hill, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 16:05.

UK Power Networks Eastern & London logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Burton End Road

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Burton End Road, Stansted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 12:46.

Cadent Gas logo
Between
15 and 28 Feb 2025
Details
View Map
Share
Follow
Frambury Lane

Cadent Gas are proposing to carry out Utility asset works on Frambury Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:56.

Cadent Gas logo
Between
15 and 28 Feb 2025
Details
View Map
Share
Frambury Lane

Cadent Gas were proposing to carry out Utility asset works on Frambury Lane, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:40.

Cadent Gas logo
Between
15 and 28 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:55.

Cadent Gas logo
Between
15 and 28 Feb 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:25.

Affinity Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Dunmow Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunmow Road, Great Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 14:59.

Affinity Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Dunmow Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunmow Road, Great Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 13:50.

Affinity Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Cobbs Lane

Affinity Water are proposing to carry out Utility asset works on Cobbs Lane, Takeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:14.

Affinity Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Bambers Green Road

Affinity Water are proposing to carry out Utility asset works on Bambers Green Road, Takeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:18.


Roadworks Map near to Sibleys Lane, BISHOP'S STORTFORD, CM22 6FH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 20:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Sibleys Lane, BISHOP'S STORTFORD, CM22 6FH (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MAJOR
  
CHICKNEY ROAD 
(0.1 miles)
BT
Utility asset works - Carriageway, Verge - Road closure
Cancelled
(Scheduled: 27 Nov 2024 - 29 Nov 2024)
0.1
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.