ROADWORKS SUMMARY
Spring Pond Meadow, BRENTWOOD, CM15 0NS
Introduction
View current and future planned roadworks and road closures for Spring Pond Meadow, CM15 0NS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Spring Pond Meadow, BRENTWOOD, CM15 0NS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Spring Pond Meadow are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
3 Sep 2023 and 4 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Access Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2023 and could run through until 4 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 24 Jul 2023 at 11:32.
4 Feb 2025
Essex County Council are carrying out Highway improvement works on Access Road, Brentwood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2023 at 00:00 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 16:26.
13 Dec 2024
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Rayleigh Road, Hutton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 July 2024 at 08:50 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 08:21.
13 Dec 2024
Cadent Gas are carrying out Utility asset works on Doddinghurst Road, Doddinghurst.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 11:05 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 13:45.
Monday
Cadent Gas are proposing to carry out Utility asset works on Roman Road, Mountnessing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 15:29.
25 Nov 2024 and 10 Jan 2025
Essex County Council were proposing to carry out Remedial works on Dagwood Lane, Doddinghurst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Oct 2024 at 12:09.
25 Nov 2024 and 31 Jan 2025
Essex County Council are proposing to carry out Remedial works on Dagwood Lane, Doddinghurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:25.
4 Feb 2025
Essex County Council are carrying out Remedial works on Dagwood Lane, Doddinghurst.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 14:29 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 14:42.
12 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on A1023 Spur From M25 J28 Roundabout, Havering.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 08:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:36.
12 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Brook Street, Brentwood.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 15:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:43.
12 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Brook Street, Brentwood.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 11:20 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 15:42.
Today
UK Power Networks Eastern & London are carrying out Utility asset works on New Road, Ingatestone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:30 and could run through until 4 December 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 10:24.
Friday
Essex County Council are proposing to carry out Highway improvement works on Cornwall Road, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 13:37.
2 and 13 Dec 2024
Electricity Network Company are proposing to carry out New service connection on Stocks Lane, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 17 Sep 2024 at 07:37.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Ongar Road, Brentwood.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 22:04 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 08:06.
2 and 25 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Nine Ashes Road, Blackmore.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 14:40.
Today
UK Power Networks Eastern & London are proposing to carry out Utility asset works on New Road, Ingatestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 11:47.
Friday
Essex County Council are proposing to carry out Highway improvement works on Firsgrove Road, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:03.
Friday
Essex County Council are proposing to carry out Highway improvement works on Firsgrove Road, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Sep 2024 at 11:02.
Friday
Essex County Council are proposing to carry out Highway improvement works on Firsgrove Crescent, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:01.
Friday
Essex County Council are proposing to carry out Highway improvement works on Firsgrove Crescent, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Sep 2024 at 11:04.
Monday
Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
Monday
Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road Straightening, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
Monday
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Highwood, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
Monday
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Highwood, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 09:08.
9 and 11 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Nine Ashes Road, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 20 Sep 2024 at 15:46.
9 and 11 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Nine Ashes Road, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 09:15.
11 and 13 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Hall Green Lane, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 10:35.
11 and 13 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Hall Green Lane, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 10:53.
16 and 18 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Long Ridings Avenue, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 13:05.
2 and 13 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Woolmongers Lane, High Ongar, Ongar.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 13 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 13:21.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crown Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 16:03.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Navestock Side, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 16:07.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crown Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:16.
10 and 14 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Moreton Road, Fyfield, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 08:58.
10 and 14 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Moreton Road, Fyfield, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 09:00.
13 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Church Lane, Doddinghurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 10:39.
13 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Cooksmill Green, Roxwell, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 13:34.
13 and 15 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on King Street, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 15:49.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 12:17.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 15:32.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 12:11.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 15:32.
20 and 22 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Wenlocks Lane, Blackmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 13:46.
20 and 22 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Wenlocks Lane, Blackmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 8 Nov 2024 at 13:41.
20 and 22 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Blackmore Road, Blackmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 11:54.
20 and 22 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Blackmore Road, Blackmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 10:15.
20 Jan and 1 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Oct 2024 at 15:39.
24 and 28 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Rookery Road, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 30 Sep 2024 at 09:04.
24 and 28 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Rookery Road, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 4 Oct 2024 at 10:18.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 11:01.
27 Jan and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Birds Green, Willingale, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 12:37.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 2 Dec 2024 at 11:11.
27 Jan and 10 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Kimpton Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 13 Nov 2024 at 07:40.
29 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Woolmongers Lane, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 12:33.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Priests Lane, Shenfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 06:46.
3 and 7 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Green Road, Fryerning.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 15 Nov 2024 at 15:46.
3 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Green Road, Fryerning.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 10:21.
3 and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lancaster Close, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 06:52.
3 and 6 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Wyatts Green Road, Wyatts Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 06:36.
3 and 6 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Wyatts Green Road, Wyatts Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 08:08.
4 and 6 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on London Road, Stanford Rivers, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 10:19.
4 and 6 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on London Road, Stanford Rivers, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 11:38.
5 and 11 Feb 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Lancaster Close, Pilgrims Hatch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 February 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 16:10.
7 and 11 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Mountnessing Lane, Doddinghurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:58.
7 and 11 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Mountnessing Lane, Doddinghurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 06:45.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Nine Ashes Road, Blackmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 29 Oct 2024 at 06:24.
17 and 21 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Oliver Road, Shenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 25 Nov 2024 at 15:17.
17 and 21 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Oliver Road, Shenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 11:48.
24 and 26 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
24 and 26 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road Straightening, High Ongar, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:36.
24 and 26 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Highwood, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 10:44.
24 and 26 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Ingatestone Road, Blackmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 13:17.
25 and 27 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on School Road, Stondon Massey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 14:21.
3 and 5 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Chelmsford Road, Blackmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 11:16.
3 and 5 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Chelmsford Road, Blackmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 10:30.
3 and 7 Mar 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Lancaster Close, Pilgrims Hatch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 11:37.
Roadworks Map near to Spring Pond Meadow, BRENTWOOD, CM15 0NS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Spring Pond Meadow, BRENTWOOD, CM15 0NS (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Oct 2024 - 13 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.