ROADWORKS SUMMARY
The Briars, Ongar Road, BRENTWOOD, CM15 0DD
Introduction
View current and future planned roadworks and road closures for The Briars, Ongar Road, CM15 0DD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Briars, Ongar Road, BRENTWOOD, CM15 0DD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Briars, Ongar Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
3 Sep 2023 and 4 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Access Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2023 and could run through until 4 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 24 Jul 2023 at 12:32.
29 Jun 2024
National Highways are carrying out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 September 2023 at 05:00 and could run through until 29 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Apr 2024 at 13:45.
14 Jun 2024
Cadent Gas are carrying out Utility asset works on Gubbins Lane, Romford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 09:00 and could run through until 14 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2024 at 09:49.
25 Mar and 28 May 2024
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Ongar Town, Ongar.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 28 May 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 16 Feb 2024 at 08:09.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Greensted Road, Ongar Town, Ongar.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 April 2024 at 09:00 and could run through until 2 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 09:56.
30 May 2024
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Long Ridings Avenue, Hutton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 April 2024 at 09:08 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 19 Apr 2024 at 11:27.
Saturday
National Highways are proposing to carry out Highway repair and maintenance works on Maylands Way, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 April 2024 and could run through until 4 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 12 Apr 2024 at 09:52.
Saturday
National Highways are proposing to carry out Highway improvement works on Maylands Way, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 April 2024 and could run through until 4 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Mar 2024 at 11:31.
Today
Essex County Council are proposing to carry out Highway improvement works on Home Farm Road, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Mar 2024 at 11:45.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Mount Road, Theydon Mount, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Mar 2024 at 10:19.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Stapleford Tawney, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Mar 2024 at 14:04.
28 Apr and 13 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Ongar Road, Kelvedon Hatch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 10:49.
Friday
Affinity Water are proposing to carry out Utility repair and maintenance works on Horseman Side, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Apr 2024 at 08:05.
Saturday
London Borough Of Havering are proposing to carry out Highway improvement works on Hilldene Avenue, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 4 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 8 Apr 2024 at 12:07.
6 and 8 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Toot Hill Road, Ongar Town, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 07:18.
7 and 10 May 2024
London Borough Of Havering are proposing to carry out Highway improvement works on Chequers Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 26 Apr 2024 at 13:34.
12 and 15 May 2024
Essex County Council are proposing to carry out Highway improvement works on Church Lane, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Apr 2024 at 08:38.
13 and 16 May 2024
Essex County Council are proposing to carry out Highway improvement works on Hutton Village, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Apr 2024 at 10:23.
14 and 17 May 2024
Essex County Council are proposing to carry out Highway improvement works on Glanthams Road, Shenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Apr 2024 at 08:59.
14 and 16 May 2024
Gigaclear are proposing to carry out Utility asset works on Toot Hill Road, Stanford Rivers, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 29 Feb 2024 at 08:58.
16 and 23 May 2024
Essex County Council are proposing to carry out Highway improvement works on Blake Hall Road, Bobbingworth, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Apr 2024 at 08:59.
21 and 24 May 2024
Essex County Council are proposing to carry out Highway improvement works on Kings Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Mar 2024 at 16:20.
25 and 27 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Ingatestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Dec 2023 at 07:10.
28 and 30 May 2024
Essex County Council are proposing to carry out Highway improvement works on Alexander Lane, Shenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Feb 2024 at 08:26.
31 May and 3 Jun 2024
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 15 Apr 2024 at 13:27.
3 and 14 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Westbury Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 11:46.
3 and 7 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Woodway, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2024 at 16:07.
4 and 6 Jun 2024
Essex County Council are proposing to carry out Highway improvement works on Epping Road, Stanford Rivers, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Mar 2024 at 11:33.
4 and 8 Jun 2024
Essex County Council are proposing to carry out Highway improvement works on Place Farm Lane, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Apr 2024 at 09:14.
5 and 8 Jun 2024
Essex County Council are proposing to carry out Highway improvement works on Kelvedon Hall Lane, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Mar 2024 at 10:01.
6 Jun and 29 Aug 2024
Thames Water are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2024 and could run through until 29 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 13:37.
7 and 10 Jun 2024
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Apr 2024 at 14:58.
9 and 13 Jun 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Weald Park Way, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 17 Apr 2024 at 09:37.
10 and 21 Jun 2024
Essex County Council are proposing to carry out Highway improvement works on Tan House Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Apr 2024 at 09:56.
14 and 17 Jun 2024
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Apr 2024 at 14:58.
17 and 20 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Frog Street, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Apr 2024 at 08:51.
17 and 19 Jun 2024
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Stondon Massey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Apr 2024 at 09:16.
19 and 21 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 21 June 2024. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 14 Mar 2024 at 14:35.
23 and 25 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Tysea Hill, Stapleford Abbotts, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 26 Apr 2024 at 09:29.
23 Jun and 26 Sep 2024
Thames Water are proposing to carry out Highway improvement works on Maylands Way, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 26 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 06:20.
26 and 29 Jun 2024
Essex County Council are proposing to carry out Highway improvement works on Weald Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Mar 2024 at 13:31.
30 Jun and 2 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Blackmore Road, Doddinghurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 10:05.
30 Jun and 4 Jul 2024
Cadent Gas are proposing to carry out New service connection on Coxtie Green Road, Pilgrims Hatch, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 4 July 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 12:23.
30 Jun and 6 Jul 2024
Essex County Council are proposing to carry out Highway improvement works on Shonks Mill Road, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 6 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Apr 2024 at 12:06.
1 and 14 Jul 2024
Essex County Council are proposing to carry out Highway improvement works on Kingsley Road, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 14 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Apr 2024 at 12:46.
2 and 4 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on School Road, Stanford Rivers, Ongar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2024 and could run through until 4 July 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 11 Apr 2024 at 14:25.
7 and 10 Jul 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Mountnessing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Apr 2024 at 08:59.
7 and 11 Jul 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mascalls Lane, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 Apr 2024 at 06:31.
7 and 11 Jul 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mascalls Lane, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 Apr 2024 at 06:23.
11 Jul and 14 Nov 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Rayleigh Road, Hutton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 5 Apr 2024 at 11:23.
15 and 19 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Woodway, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2024 at 11:30.
21 and 24 Jul 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Ongar Road, Stondon Massey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 15:04.
21 and 25 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Peartree Lane, Doddinghurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Apr 2024 at 10:01.
22 and 24 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Dudbrook Road, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 23 Apr 2024 at 11:22.
Roadworks Map near to The Briars, Ongar Road, BRENTWOOD, CM15 0DD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Briars, Ongar Road, BRENTWOOD, CM15 0DD (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 25 Apr 2024 - 29 Apr 2024)
Contains public sector information licensed under the Open Government Licence v3.0.