ROADWORKS SUMMARY
Whinhams Way, BILLERICAY, CM12 0HD
Introduction
View current and future planned roadworks and road closures for Whinhams Way, CM12 0HD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Whinhams Way, BILLERICAY, CM12 0HD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Whinhams Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
3 Sep 2023 and 4 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Access Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2023 and could run through until 4 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 24 Jul 2023 at 11:32.
4 Feb 2025
Essex County Council are carrying out Highway improvement works on Access Road, Brentwood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2023 at 00:00 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 16:26.
22 Jul 2024 and 6 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 6 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 30 Jul 2024 at 12:57.
22 Jul 2024 and 14 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 14 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 4 Aug 2024 at 22:10.
13 Dec 2024
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Rayleigh Road, Hutton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 July 2024 at 08:50 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 24 Jul 2024 at 07:50.
4 Aug 2024 and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 24 Nov 2023 at 13:21.
5 Aug 2024 and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 20:11.
23 Aug 2024 and 6 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2024 and could run through until 6 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 12 Sep 2024 at 15:36.
26 Sep 2024 and 14 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 14 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 13 Sep 2024 at 11:18.
14 Apr 2025
Essex County Council are carrying out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 00:00 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 08:17.
7 Oct and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 11:51.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Roman Road, Ingatestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 08:21.
28 Nov 2024
Cadent Gas are carrying out Utility asset works on Parklands, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 14:42 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:06.
Tomorrow
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nevendon Road, Nevendon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 4 Oct 2024 at 14:22.
Wednesday
Essex County Council are carrying out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 00:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:04.
Wednesday
Essex County Council are carrying out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 00:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:06.
Today
Essex County Council are proposing to carry out Highway improvement works on Hanging Hill Lane, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Aug 2024 at 15:56.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Sep 2024 at 12:21.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Sep 2024 at 12:09.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Herongate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:05.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Herongate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 14:59.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Roman Road, Mountnessing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 15:29.
Essex County Council carried out Highway improvement works on Long Ridings Avenue, Hutton.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 19 Nov 2024 and 21 Nov 2024 and were actually completed between 19 Nov 2024 (00:00) and 21 Nov 2024 (08:15). The works impacted the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 08:24.
Saturday
UK Power Networks Eastern & London are proposing to carry out New service connection on Mountnessing Road, Blackmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 23 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2024 at 14:27.
Saturday
UK Power Networks Eastern & London are carrying out New service connection on Mountnessing Road, Blackmore.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 09:00 and could run through until 23 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:27.
25 Nov and 5 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Southernhay, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:13.
25 Nov and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Nether Mayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:21.
25 Nov and 5 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Laindon Link, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:18.
25 Nov and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Roundacre New Roundabout, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:16.
25 Nov and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Roundacre, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:23.
Wednesday
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Hall Green Lane, Hutton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Nov 2024 at 09:29.
25 Nov 2024 and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:38.
25 Nov 2024 and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:40.
25 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on The Greenway, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:22.
25 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:30.
25 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:28.
25 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:28.
25 and 29 Nov 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Brock Hill, South Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 08:46.
25 and 29 Nov 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Brock Hill, South Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:34.
25 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mountnessing Road, Mountnessing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 12:14.
25 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mountnessing Road, Mountnessing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 14:34.
25 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mountnessing Road, Mountnessing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 12:09.
Wednesday
Essex County Council were proposing to carry out Highway improvement works on Swallows Cross Road, Mountnessing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 13:25.
2 and 6 Dec 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nevendon Road, Nevendon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 17 Nov 2024 at 08:09.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Billericay Road, Herongate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:19.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Billericay Road, Herongate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:05.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Billericay Road, Herongate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 14:57.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Firsgrove Road, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Sep 2024 at 11:02.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Firsgrove Road, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:03.
2 and 4 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on New Road, Ingatestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 11:47.
2 and 4 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on New Road, Ingatestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Nov 2024 at 15:33.
3 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on The Gore, Ghyllgrove, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 15:05.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on The Gore, Ghyllgrove, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:55.
5 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Tye Common Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Sep 2024 at 15:20.
5 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Western Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Sep 2024 at 15:23.
5 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on London Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Sep 2024 at 15:16.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Great Oaks, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.
9 and 16 Dec 2024
Essex County Council were proposing to carry out Highway improvement works on Great Oaks, Basildon Town, Basildon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 15:23.
9 and 17 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Westgate, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Southernhay, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.
16 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Wayletts, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:48.
16 and 20 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 15:48.
17 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 16:52.
17 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 15:40.
17 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 13:44.
2 and 5 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 1 Nov 2024 at 09:17.
2 and 5 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 09:53.
2 and 21 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Ramsden Crays, Wickford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:47.
2 Jan and 25 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 08:24.
2 Jan and 29 May 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:25.
2 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford Town, Wickford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:21.
3 Jan and 7 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:26.
4 and 7 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 13:45.
6 and 18 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Langdon Hills, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 15:59.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Wickford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:28.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Irvon Hill Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 07:00.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Irvon Hill Road, Wickford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Kennel Lane, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 09:16.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Kennel Lane, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 19 Nov 2024 at 12:10.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wiggins Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Oct 2024 at 16:11.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wiggins Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 3 Nov 2024 at 06:58.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wiggins Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 7 Nov 2024 at 15:30.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wiggins Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 09:42.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mount View, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:39.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mount View, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:59.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:42.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:42.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:48.
13 Jan and 7 Mar 2025
Essex County Council were proposing to carry out Remedial works on Miles Gray Road, Pipps Hill Industrial, Basildon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:24.
13 Jan and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Miles Gray Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 14:51.
13 and 15 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Wash Road, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Nov 2024 at 09:46.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 15:32.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 15:32.
20 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 14:06.
20 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 18:54.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Remedial works on Dunton Road, Dunton, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 10:07.
27 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Gardiners Lane North, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:34.
27 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Nevendon Road, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:30.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 11:01.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 17:53.
27 Jan and 10 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Kimpton Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 13 Nov 2024 at 07:40.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Priests Lane, Shenfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:00.
3 and 6 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Wyatts Green Road, Wyatts Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 06:36.
3 and 6 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Wyatts Green Road, Wyatts Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 08:31.
3 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Green Road, Fryerning.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 10:21.
3 and 7 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Green Road, Fryerning.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 15 Nov 2024 at 15:46.
7 and 11 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Mountnessing Lane, Doddinghurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 06:45.
7 and 11 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Mountnessing Lane, Doddinghurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:58.
10 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oak Road, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 15:59.
14 and 17 Feb 2025
Virgin Media were proposing to carry out Utility repair and maintenance works on High Road North, Laindon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 12 Nov 2024 at 14:14.
16 and 20 Feb 2025
Telefonica UK are proposing to carry out Utility asset works on Greens Farm Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telefonica UK on 19 Nov 2024 at 16:58.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hillway, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:51.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hillway, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:10.
17 and 21 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Oliver Road, Shenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 11:48.
17 and 21 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Oliver Road, Shenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 19 Nov 2024 at 09:58.
Roadworks Map near to Whinhams Way, BILLERICAY, CM12 0HD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Whinhams Way, BILLERICAY, CM12 0HD (25 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Nov 2024 - 22 Nov 2024)
(Scheduled: 20 Nov 2024 - 26 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.