ROADWORKS SUMMARY
Chester Road, NESTON, CH64 9UA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Chester Road, CH64 9UA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Chester Road, NESTON, CH64 9UA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chester Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Orchard Way

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Orchard Way, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 15:48.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Shallmarsh Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Shallmarsh Road, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 10:23.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Firs Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Firs Avenue, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 13:58.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Gayton Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Gayton Road, Gayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 09:59.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Church Meadow Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Meadow Lane, Heswall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Apr 2024 at 14:57.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Bellward Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Bellward Close, Spital.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Oct 2024 at 16:27.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Baumville Drive

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Baumville Drive, Spital.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 19 Nov 2024 at 13:49.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Oldfield Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Oldfield Road, Heswall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:07.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Derwent Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Derwent Road, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 4 Mar 2024 at 15:15.

Wirral Borough Council logo
LONG TERM
Between
24 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bowness Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bowness Avenue, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 26 Jun 2024 at 10:11.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Parkwood Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Parkwood Close, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 11:42.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Cedarway

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Cedarway, Gayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:41.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Dee Park Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Dee Park Road, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:22.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Tudor Way

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Tudor Way, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 8 Jul 2024 at 12:47.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Cottesmore Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Cottesmore Drive, Barnston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:22.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Redmere Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Redmere Drive, Barnston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 14:17.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Mark Rake

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Mark Rake, Bromborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:24.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Overdale Avenue

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Overdale Avenue, Barnston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:23.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Chatsworth Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Chatsworth Road, Pensby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:42.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Private Drive

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Private Drive, Barnston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:30.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Pine Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Pine Avenue, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 10:14.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Firs Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Firs Avenue, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:23.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Ridgefield Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Ridgefield Road, Pensby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:31.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Greendale Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Greendale Road, Port Sunlight.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:49.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Orchard Way

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Orchard Way, Higher Bebington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:23.

Wirral Borough Council logo
LONG TERM
Between
31 Jul 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Church Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:51.

Wirral Borough Council logo
LONG TERM
Between
31 Jul 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Brimstage Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:53.

Wirral Borough Council logo
LONG TERM
Between
31 Jul 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Spital Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:52.

Wirral Borough Council logo
LONG TERM
Between
31 Jul 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Poulton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:54.

Cadent Gas logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Pensby Road

Cadent Gas are carrying out Utility asset works on Pensby Road, Thingwall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 September 2024 at 10:31 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:32.

Wirral Borough Council logo
LONG TERM
Between
7 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Rest Hill Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Rest Hill Road, Storeton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Aug 2024 at 14:20.

Wirral Borough Council logo
LONG TERM
Between
7 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Rest Hill Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rest Hill Road, Storeton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Aug 2024 at 14:22.

Wirral Borough Council logo
LONG TERM
Between
7 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Town Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Town Lane, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 27 Aug 2024 at 14:19.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lynton Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Lynton Close, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:31.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Parklands Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Parklands Drive, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:50.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Beverley Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Beverley Drive, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 12:46.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Dunster Grove

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Dunster Grove, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:30.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Hessle Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hessle Drive, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:30.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Porlock Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Porlock Close, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:50.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Banks Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Banks Road, Heswall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:29.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Trent Way

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Trent Way, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:51.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 26 Feb 2025
Details
View Map
Share
Follow
Pensby Road

Cadent Gas are proposing to carry out Utility asset works on Pensby Road, Thingwall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 13:11.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 26 Feb 2025
Details
View Map
Share
Follow
Pensby Road

Cadent Gas are proposing to carry out Utility asset works on Pensby Road, Thingwall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:48.

Wirral Borough Council logo
LONG TERM
Between
13 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Thursby Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Thursby Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:32.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ringway

Cadent Gas are proposing to carry out Utility asset works on Ringway, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:19.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Spital Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Brimstage Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Willowbrow Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Willowbrow Road, Raby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:40.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Stanton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:53.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Kinglass Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinglass Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:46.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Poulton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Ferry Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 14:26.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Church Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rockfarm Drive

Cadent Gas are carrying out Utility asset works on Rockfarm Drive, Little Neston, Neston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 08:35 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 13:37.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Rockfarm Close

Cadent Gas are proposing to carry out Utility asset works on Rockfarm Close, Little Neston, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 08:43.

Cadent Gas logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Rockfarm Close

Cadent Gas are carrying out Utility asset works on Rockfarm Close, Little Neston, Neston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 11:30 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:30.

Cadent Gas logo
LONG TERM
Between
5 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Raby Park Road

Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 16 January 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:42.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Buildwas Road

Cadent Gas are proposing to carry out Utility asset works on Buildwas Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:20.

Cadent Gas logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Talbot Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Talbot Avenue, Little Neston, Neston.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 09:32 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 09:44.

Cadent Gas logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Burton Road

Cadent Gas are carrying out Utility repair and maintenance works on Burton Road, Little Neston, Neston.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 09:32 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 09:44.

ManWeb logo
Between
11 and 27 Dec 2024
Details
View Map
Share
Follow
Acre Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Sep 2024 at 11:19.

ManWeb logo
Between
11 and 27 Dec 2024
Details
View Map
Share
Follow
Oteley Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Sep 2024 at 11:19.

Cadent Gas logo
Until
30 Dec 2024
Details
View Map
Share
Follow
Plymyard Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Plymyard Avenue, Eastham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 10:32 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:16.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Manorial Road

Cadent Gas are carrying out Utility repair and maintenance works on Manorial Road, Parkgate, Neston.

The works started on 15 December 2024 at 11:01 and could run through until 24 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 08:51.

ManWeb logo
Between
19 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Acre Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 15:34.

ManWeb logo
Between
19 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Oteley Avenue

ManWeb were proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 15:29.

ManWeb logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Poll Hill Road

ManWeb are proposing to carry out Utility repair and maintenance works on Poll Hill Road, Heswall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 24 Oct 2024 at 13:32.

BT logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Green Bank

BT are proposing to carry out Utility asset works on Green Bank, Brimstage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Nov 2024 at 11:28.

BT logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Green Bank

BT are proposing to carry out Utility asset works on Green Bank, Brimstage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Sep 2024 at 10:32.

BT logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Brimstage Road

BT are proposing to carry out Utility asset works on Brimstage Road, Brimstage.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Nov 2024 at 11:28.

BT logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Brimstage Road

BT are proposing to carry out Utility asset works on Brimstage Road, Brimstage.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Sep 2024 at 10:46.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Cottage Lane

Cadent Gas were proposing to carry out New service connection on Cottage Lane, Gayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:03.

ManWeb logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Heath Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 24 Oct 2024 at 11:27.

ManWeb logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Heath Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 24 Oct 2024 at 11:37.

Wirral Borough Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Town Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Town Lane, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 20 Nov 2024 at 15:17.

ManWeb logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Heath Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 21 Oct 2024 at 12:05.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Shotwick Lane

BT are proposing to carry out Utility asset works on Shotwick Lane, Woodbank, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Dec 2024 at 11:03.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Shotwick Lane

BT are proposing to carry out Utility asset works on Shotwick Lane, Shotwick, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Dec 2024 at 11:03.

Wirral Borough Council logo
Between
22 and 29 Jan 2025
Details
View Map
Share
Follow
Ferry Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Nov 2024 at 09:34.

Wirral Borough Council logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thursby Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Thursby Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 17 Dec 2024 at 15:36.

ManWeb logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Cottage Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Cottage Lane, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by ManWeb on 12 Nov 2024 at 09:55.

Wirral Borough Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Eastham Rake

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Eastham Rake, Eastham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 12 Dec 2024 at 13:15.

ManWeb logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Heath Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 17 Dec 2024 at 16:08.

Wirral Borough Council logo
Between
12 and 17 Feb 2025
Details
View Map
Share
Follow
Willowbrow Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Willowbrow Road, Raby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Dec 2024 at 13:22.

Wirral Borough Council logo
Between
14 and 18 Feb 2025
Details
View Map
Share
Follow
Stanton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Nov 2024 at 10:03.

Wirral Borough Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kinglass Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinglass Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:08.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Shotwick Lane

BT are proposing to carry out Utility asset works on Shotwick Lane, Woodbank, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Nov 2024 at 15:56.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Shotwick Lane

BT are proposing to carry out Utility asset works on Shotwick Lane, Shotwick, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Nov 2024 at 15:57.

ManWeb logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Lower Thingwall Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Lower Thingwall Lane, Thingwall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 20 Nov 2024 at 11:50.

Severn Trent Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Villas Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Villas Road, Bolsover.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 16:09.


Roadworks Map near to Chester Road, NESTON, CH64 9UA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Chester Road, NESTON, CH64 9UA (25 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
RABY ROAD 
(0.2 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.2
Details
Share
Follow
2
United Utilities Water (formerly North West Water) logo
URGENT
  
BENDEE ROAD, LITTLE NESTON 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Dec 2024 14:51
(Scheduled: 12 Dec 2024 - 18 Dec 2024)
0.4
Details
Share
Follow
3
Cadent Gas logo
EMERGENCY
  
BURTON ROAD, LITTLE NESTON 
(0.4 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 10 Dec 2024 09:32
(Scheduled: 10 Dec 2024 - 27 Dec 2024)
0.4
Details
Share
Follow
4
Cadent Gas logo
EMERGENCY
  
TALBOT AVENUE, LITTLE NESTON 
(0.4 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 10 Dec 2024 09:32
(Scheduled: 10 Dec 2024 - 27 Dec 2024)
0.4
Details
Share
Follow
5
Cheshire West And Chester Council logo
WEST VALE 
(0.4 miles)
Cheshire West And Chester Council
Highway improvement works - Carriageway - Give and take
Planned
Scheduled: 18 Dec 2024
0.4
Details
Share
Follow
6
United Utilities Water (formerly North West Water) logo
SUTTON AVENUE 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Dec 2024 14:26
(Scheduled: 16 Dec 2024 - 19 Dec 2024)
0.4
Details
Share
Follow
7
United Utilities Water (formerly North West Water) logo
URGENT
  
THE DALE 
(0.5 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Dec 2024 11:29
(Scheduled: 12 Dec 2024 - 18 Dec 2024)
0.5
Details
Share
Follow
8
United Utilities Water (formerly North West Water) logo
URGENT
  
THE DALE 
(0.5 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 12 Dec 2024 - 18 Dec 2024)
0.5
Details
Share
9
ManWeb logo
URGENT
  
BURTON ROAD, LITTLE NESTON 
(0.6 miles)
ManWeb
Utility repair and maintenance works - Footway - Multi-way signals
In Progress
Since: 16 Dec 2024 13:53
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.6
Details
Share
Follow
10
Cadent Gas logo
THE GREEN, LITTLE NESTON 
(0.6 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 13 Dec 2024 08:25
(Scheduled: 10 Dec 2024 - 23 Dec 2024)
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.