ROADWORKS SUMMARY
Richmond Road, WIRRAL, CH63 7QW
Introduction

View current and future planned roadworks and road closures for Richmond Road, CH63 7QW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Richmond Road, WIRRAL, CH63 7QW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Richmond Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
3 Sep 2023 and 7 Sep 2025
Liverpool City Council are proposing to carry out Highway improvement works on Falkner Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2023 and could run through until 7 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Liverpool City Council on 5 Oct 2023 at 13:03.
Monday
Liverpool City Council are proposing to carry out Highway improvement works on Upper Duke Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2024 and could run through until 9 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Liverpool City Council on 11 Jun 2024 at 08:29.
1 Apr 2024 and 1 Sep 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Oxton Road, Birkenhead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2024 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 17 Dec 2024 at 16:52.
1 Apr 2024 and 31 Aug 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Charing Cross, Birkenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 10 Nov 2023 at 12:30.
1 Apr 2024 and 1 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Exmouth Street, Birkenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 10 Nov 2023 at 12:30.
1 Apr 2024 and 1 Sep 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Park Street, Birkenhead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2024 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 17 Dec 2024 at 16:35.
1 Apr 2024 and 1 Sep 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Conway Street, Birkenhead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2024 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 19 Nov 2024 at 14:35.
1 Apr 2024 and 1 Sep 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on St Laurence Drive, Birkenhead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2024 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 17 Dec 2024 at 16:39.
19 May 2024 and 19 Aug 2025
Liverpool City Council are proposing to carry out Highway improvement works on Cheapside Alley, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 19 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Liverpool City Council on 16 May 2024 at 06:31.
2 Jun 2024 and 19 Aug 2025
Liverpool City Council are proposing to carry out Highway improvement works on Cunliffe Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 19 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Liverpool City Council on 16 May 2024 at 06:33.
19 Dec 2025
Wirral Borough Council are carrying out Highway repair and maintenance works on Conway Street, Birkenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 June 2024 at 08:00 and could run through until 19 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wirral Borough Council on 7 Apr 2025 at 15:00.
30 Jun 2025
Wirral Borough Council are carrying out Highway repair and maintenance works on Charing Cross, Birkenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 28 May 2025 at 12:49.
31 Aug 2025
Wirral Borough Council are carrying out Highway repair and maintenance works on Europa Boulevard, Birkenhead.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 08:00 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 4 Apr 2025 at 10:36.
4 Jul 2025
Liverpool City Council are carrying out Section 50 on Victoria Street, Liverpool One, Liverpool.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 08:00 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Liverpool City Council on 15 May 2025 at 14:44.
1 Feb 2025 and 31 May 2026
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Leighton Road, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 31 May 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 28 Feb 2025 at 11:19.
10 Feb and 27 Jun 2025
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Chester High Road, Neston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 4 Feb 2025 at 14:25.
17 Feb and 27 Jun 2025
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Raby Park Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 4 Feb 2025 at 14:25.
17 Feb and 27 Jun 2025
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Upper Raby Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 4 Feb 2025 at 14:21.
16 Mar 2025 and 31 Mar 2027
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Grange Road, Birkenhead.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 31 March 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 7 Apr 2025 at 12:16.
16 Mar 2025 and 31 Mar 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Conway Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 March 2025 and could run through until 31 March 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 29 Oct 2024 at 12:02.
16 Mar 2025 and 31 Mar 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hamilton Square, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 March 2025 and could run through until 31 March 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 29 Oct 2024 at 12:06.
16 Mar 2025 and 31 Mar 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodside Ferry Approach, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 March 2025 and could run through until 31 March 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 29 Oct 2024 at 12:14.
24 Mar and 4 Jul 2025
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Chester High Road, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 20 Mar 2025 at 12:01.
11 Jul 2025
Cheshire West And Chester Council are carrying out Highway improvement works on Upper Raby Road, Neston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2025 at 09:30 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cheshire West And Chester Council on 27 Mar 2025 at 10:36.
11 Jul 2025
Cheshire West And Chester Council are carrying out Highway improvement works on Raby Park Road, Neston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 March 2025 at 10:00 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cheshire West And Chester Council on 31 Mar 2025 at 09:45.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harrogate Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 1 Apr 2025 at 09:58.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harrogate Road, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 1 Apr 2025 at 09:56.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on The Mount, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 09:21.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on New Chester Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 09:19.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rest Hill Road, Storeton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 14 Oct 2024 at 11:31.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Town Lane, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 29 Jan 2025 at 09:19.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodcote Bank, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 16:18.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rocklands Avenue, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:17.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Easton Road, New Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 29 Jan 2025 at 09:01.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Lytton Avenue, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 14:01.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spenser Avenue, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:58.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Highfield Crescent, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 15:07.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Highfield Grove, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 14:00.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Browning Avenue, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 13 Mar 2025 at 16:55.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Tennyson Avenue, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 16:01.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kipling Avenue, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 14:01.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Shakespeare Avenue, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:45.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ruskin Avenue, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:33.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Highfield Road, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 09:56.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ivydale Road, Tranmere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 14:00.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on The Knoll, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 14:36.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Leeswood Road, Woodchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 11:34.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Willan Street, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 14:36.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Mather Road, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 14:01.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Charlesville, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 11:15.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Reedville, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:09.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Euston Grove, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 14:34.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Westbourne Road, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 16:14.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Grafton Street, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 14:34.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Grange Road West, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 14:35.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Sandbrook Lane, Moreton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:39.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Cherry Tree Road, Moreton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 10:13.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Arkle Road, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 13 Mar 2025 at 16:46.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Naylor Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 24 Mar 2025 at 09:36.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Collin Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 11:16.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Arkle Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 13 Mar 2025 at 16:43.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Egremont.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 18 Mar 2025 at 10:13.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rullerton Road, Liscard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:30.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rudgrave Place, Egremont.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:23.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rudgrave Square, Egremont.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:27.
7 Apr 2025 and 8 Apr 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Old Chester Road, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 8 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Apr 2025 at 11:13.
16 Jun 2025
Cadent Gas are carrying out Utility asset works on Worcester Road, Bidston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 11:40 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 11:20.
19 May 2026
Wirral Borough Council are carrying out Highway repair and maintenance works on Ferry Road, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 09:00 and could run through until 19 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 May 2025 at 15:25.
21 Apr and 30 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bromborough Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 25 Mar 2025 at 11:15.
23 Apr and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Wallasey Road, Liscard.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:40.
Friday
Cadent Gas were proposing to carry out Utility asset works on Brimstage Road, Barnston.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 April 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 10:32.
28 Apr and 22 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on North Drive, Wavertree, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 16:22.
28 Apr and 22 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on North Drive, Wavertree, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 10:16.
29 Apr and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 16:01.
13 Jun 2025
Cadent Gas are carrying out Utility asset works on Park Place, Liverpool.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 May 2025 at 17:35 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 13:48.
29 Apr and 24 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Road, Bidston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 13:36.
29 Apr and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Road, Bidston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 14:39.
5 May and 19 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 10:02.
5 May and 19 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 11:38.
5 May and 24 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Smithdown Road, Wavertree, Liverpool.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 24 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 15:18.
19 Jun 2025
Wirral Borough Council are carrying out Highway improvement works on Royal Standard Way, Tranmere.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 10:00 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 May 2025 at 08:36.
8 May 2025 and 8 May 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Greasby Road, Greasby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 8 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 10:46.
12 May and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 12:37.
12 May and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 11:39.
12 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 10:27.
12 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 10:37.
12 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 08:30.
12 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 11:34.
12 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 13:15.
12 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 10:41.
Friday
ManWeb are proposing to carry out Utility repair and maintenance works on Conway Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 14 Feb 2025 at 08:55.
Friday
ManWeb are proposing to carry out Utility repair and maintenance works on Conway Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 4 Mar 2025 at 09:13.
Friday
ManWeb are carrying out Utility repair and maintenance works on Conway Street, Liverpool.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 12 May 2025 at 09:41.
Friday
ManWeb were proposing to carry out Utility repair and maintenance works on Netherfield Road North, Liverpool.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 14 Feb 2025 at 11:46.
26 Jun 2025
Cadent Gas are carrying out Utility asset works on Park Road, Liverpool.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 08:12 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 08:54.
11 Jun 2025
Cadent Gas are carrying out Utility asset works on Warwick Street, Liverpool.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 08:12 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 13:49.
16 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Brow Road, Bidston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 16:17.
Friday
ESP Electricity are carrying out Utility asset works on Pool Lane, Bromborough.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 29 May 2025 at 11:24.
19 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Noctorum Way, Noctorum.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 May 2025 at 15:54.
19 May and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Saughall Massie Lane, Upton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 08:05.
Monday
Cadent Gas are proposing to carry out Utility asset works on Boundary Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 09:13.
Monday
Cadent Gas are proposing to carry out Utility asset works on Boundary Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 10:09.
Monday
Cadent Gas are proposing to carry out Utility asset works on Boundary Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:29.
19 May and 17 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 10:15.
17 Jun 2025
Cadent Gas are carrying out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 12:00 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 12:45.
Thursday
ManWeb are carrying out Utility repair and maintenance works on Netherfield Road North, Liverpool.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 08:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 29 May 2025 at 07:40.
Friday
Wirral Borough Council are carrying out Highway repair and maintenance works on Thornton Common Road, Thornton Hough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Jun 2025 at 15:21.
26 May and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 08:56.
26 May and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 15:38.
26 May and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:30.
26 May and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 May 2025 at 15:17.
26 May and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 13:09.
26 May and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Milton Road, Tranmere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 10:50.
27 May and 11 Jun 2025
Wirral Borough Council are proposing to carry out Section 50 on Dock Road South, Bromborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 22 May 2025 at 09:19.
23 Jun 2025
Cadent Gas are carrying out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:30 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 08:34.
27 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Vyner Road North, Bidston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 16:22.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Redcar Drive, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:20.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Edgewood Drive, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:19.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Langfield Grove, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:27.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodlea Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:20.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brinley Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:19.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Colmore Avenue, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:19.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Baumville Drive, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bellward Close, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Finstall Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:19.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harborne Drive, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:20.
28 May and 17 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Gilbert Close, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:22.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinglass Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:27.
28 May and 17 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Dutton Drive, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:22.
28 May and 17 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kevelioc Close, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:21.
28 May and 17 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Stevenson Drive, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:21.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on The Glen, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Tanar Close, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
29 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kelsall Avenue, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
29 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Allangate Close, Greasby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 16:01.
29 May and 26 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Norwich Drive, Upton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:14.
29 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Weybourne Close, Upton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 12:27.
29 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Aylsham Drive, Upton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 12:27.
29 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Forest Road, Claughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Mar 2025 at 11:24.
29 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Fender View Road, Moreton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 15:21.
1 Jun 2025 and 31 Mar 2026
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Highcroft Avenue, Bebington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 June 2025 and run through until 31 March 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 3 Apr 2025 at 10:30.
Friday
ManWeb are carrying out Utility repair and maintenance works on Great Howard Street, City Centre, Liverpool.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2025 at 20:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 2 Jun 2025 at 08:40.
2 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hinderton Road, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 15:20.
2 and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Greenleigh Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 12:43.
2 and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Greenleigh Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 11:39.
2 and 22 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Wethersfield Road, Noctorum.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 09:53.
2 and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Ullet Road, Greenbank, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 07:31.
2 and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Ullet Road, Greenbank, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:18.
23 Jun 2025
Cadent Gas are carrying out Utility asset works on Ullet Road, Greenbank, Liverpool.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 07:59 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 08:39.
2 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Smithdown Road, Wavertree, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 08:40.
30 Jun 2025
Cadent Gas are carrying out Utility asset works on Smithdown Road, Wavertree, Liverpool.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:17.
2 and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hill Road, Claughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Mar 2025 at 15:27.
2 and 22 Jun 2025
ManWeb are proposing to carry out Utility repair and maintenance works on South Drive, Wavertree, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 4 Mar 2025 at 09:23.
2 and 22 Jun 2025
ManWeb are proposing to carry out Utility repair and maintenance works on South Drive, Wavertree, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 5 Mar 2025 at 09:56.
2 and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Boundary Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 16:30.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Poulton Road, Poulton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:48 and could run through until 6 June 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:39.
Friday
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on The Knoll, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 30 Apr 2025 at 13:33.
3 and 17 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Balls Road, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Feb 2025 at 15:03.
3 and 17 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Balls Road, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Apr 2025 at 11:15.
3 and 11 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Station Road, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Jun 2025 at 10:14.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Mere Road, Raby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Hall Road, Raby Mere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.
4 Jun and 17 Jul 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Milner Road, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:56.
4 and 24 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Downham Road South, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:56.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Milner Road, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:58.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:58.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Whitfield Lane, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:58.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Royd Drive, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:58.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brackenwood Road, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Mar 2025 at 11:05.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bracken Lane, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:57.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on St Pauls Road, Rock Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:48.
4 and 10 Jun 2025
Liverpool City Council are proposing to carry out Highway improvement works on Rose Lane, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Liverpool City Council on 24 May 2025 at 10:14.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Grange Mount, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Mar 2025 at 11:24.
4 and 13 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Upton Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Jun 2025 at 10:44.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Boundary Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Mar 2025 at 11:23.
5 and 25 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Poulton Road, Seacombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 13:35.
5 and 25 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Mainwaring Road, Seacombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 13:33.
Monday
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Brimstage Road, Barnston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 9 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 18 Mar 2025 at 11:37.
6 and 12 Jun 2025
Liverpool City Council are proposing to carry out Highway improvement works on Pitville Avenue, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Liverpool City Council on 30 May 2025 at 13:13.
6 and 12 Jun 2025
Liverpool City Council are proposing to carry out Highway improvement works on Pitville Avenue, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Liverpool City Council on 30 May 2025 at 13:14.
6 and 12 Jun 2025
Liverpool City Council are proposing to carry out Highway improvement works on Rose Lane, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Liverpool City Council on 30 May 2025 at 12:12.
9 Jun and 3 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Poulton Royd Drive, Spital.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 15:39.
9 and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Close, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 12:52.
9 and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Close, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 11:38.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:01.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 09:08.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 15:37.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:30.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 12:41.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Greenhill Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 09:00.
9 and 17 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Devonshire Road, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 30 Apr 2025 at 14:33.
9 Jun and 6 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Croxteth Road, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 14:30.
9 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Soho Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 11:06.
10 and 17 Jun 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Brimstage Road, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 17 June 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 25 Mar 2025 at 09:54.
11 Jun and 8 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Mather Avenue, Mossley Hill, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 15:51.
15 and 17 Jun 2025
Virgin Media were proposing to carry out Utility asset works on Harrington Street, Liverpool.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 June 2025 and run through until 17 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 15 Apr 2025 at 07:38.
16 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Harthill Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 09:41.
16 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Willmer Road, Tranmere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 16:36.
16 Jun and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Saughall Massie Lane, Upton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:11.
16 Jun and 10 Jul 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Canning Street, Birkenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 31 Jan 2025 at 11:11.
16 Jun and 10 Jul 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Canning Street, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 6 Feb 2025 at 09:05.
16 and 18 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Wellington Road, Wavertree, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 May 2025 at 11:33.
16 and 18 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Wellington Road, Wavertree, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 May 2025 at 09:24.
16 and 18 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Wellington Road, Wavertree, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 May 2025 at 15:21.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Spekeland Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 08:19.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Spekeland Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:00.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Spekeland Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 12:42.
16 Jun and 4 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Wheatland Lane, Seacombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 13:38.
23 and 25 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Raby Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 May 2025 at 15:27.
23 and 25 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Raby Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 May 2025 at 14:47.
23 Jun and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 11:27.
23 Jun and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 10:28.
23 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Harthill Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:00.
23 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Harthill Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 15:36.
23 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Harthill Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:30.
23 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Harthill Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 11:14.
23 and 26 Jun 2025
Cadent Gas are proposing to carry out New service connection on Mona Street, Claughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 12:17.
23 Jun and 20 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Spekeland Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 10:02.
23 and 27 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bidston Link Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Jun 2025 at 15:00.
23 and 27 Jun 2025
Telefonica UK are proposing to carry out Utility asset works on Moorfields, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telefonica UK on 7 Apr 2025 at 13:53.
23 and 27 Jun 2025
Telefonica UK are proposing to carry out Utility asset works on Moorfields, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telefonica UK on 10 Apr 2025 at 12:14.
23 Jun and 20 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hamilton Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 10:26.
30 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Moreton Road, Upton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 14:52.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Croxteth Road, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 14:51.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Croxteth Road, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 09:24.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Croxteth Road, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 09:03.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Croxteth Road, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 13:41.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Croxteth Road, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 13:11.
30 Jun and 4 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stanhope Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 25 Mar 2025 at 15:42.
30 Jun and 4 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stanhope Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 28 Apr 2025 at 09:49.
30 Jun and 4 Jul 2025
Network Rail were proposing to carry out Works for Rail Purposes on Stanhope Street, Liverpool.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 30 Apr 2025 at 09:57.
30 Jun and 4 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Ashwell Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 25 Mar 2025 at 15:42.
30 Jun and 4 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Ashwell Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Apr 2025 at 08:05.
30 Jun and 4 Jul 2025
Network Rail were proposing to carry out Works for Rail Purposes on Ashwell Street, Liverpool.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 30 Apr 2025 at 09:56.
30 Jun and 27 Jul 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Canning Street, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 26 Mar 2025 at 10:20.
30 Jun and 27 Jul 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Canning Street, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 4 Apr 2025 at 13:38.
30 Jun and 27 Jul 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Canning Street, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 14 Apr 2025 at 15:36.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hamilton Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 14:31.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hamilton Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 11:54.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hamilton Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 12:51.
30 Jun and 27 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hamilton Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 11:10.
1 Jul 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 12:53.
1 Jul 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 12:54.
1 Jul 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 12:54.
1 Jul 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 11:16.
7 and 9 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Stratford Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Mar 2025 at 12:46.
7 and 11 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Waterpark Road, Prenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Apr 2025 at 10:12.
7 and 9 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Pinemore Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Mar 2025 at 12:49.
7 and 9 Jul 2025
BT were proposing to carry out Utility repair and maintenance works on New Hey Road, Woodchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 4 Apr 2025 at 14:46.
7 and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cadogan Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 10:11.
7 and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cadogan Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 14:42.
7 and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cadogan Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 10:30.
7 and 9 Jul 2025
BT were proposing to carry out Utility repair and maintenance works on Mathew Street, Liverpool.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 9 Apr 2025 at 10:01.
7 and 9 Jul 2025
UK Power Distribution are proposing to carry out Remedial works on Regent Road, Sandhills, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Distribution on 29 Apr 2025 at 10:06.
9 and 15 Jul 2025
UK Power Distribution are proposing to carry out Permanent reinstatement on Blackstone Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Distribution on 29 Apr 2025 at 10:15.
10 and 17 Jul 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Martins Lane, Liscard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 30 Apr 2025 at 14:02.
11 and 15 Jul 2025
UK Power Distribution are proposing to carry out Permanent reinstatement on Great Howard Street, Kirkdale, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Distribution on 29 Apr 2025 at 10:21.
14 and 16 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Noctorum Avenue, Noctorum.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Apr 2025 at 10:24.
14 and 16 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Wellington Road, Wavertree, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Apr 2025 at 08:52.
14 and 16 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Wellington Road, Wavertree, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Apr 2025 at 09:51.
14 and 18 Jul 2025
BT are proposing to carry out Works for road purposes on Princes Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 10 Apr 2025 at 12:26.
14 and 20 Jul 2025
BT are proposing to carry out Works for road purposes on Princes Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 16 Apr 2025 at 15:24.
14 and 20 Jul 2025
BT are proposing to carry out Works for road purposes on Princes Street, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 17 Apr 2025 at 10:42.
16 and 18 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Stamfordham Drive, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 May 2025 at 08:50.
16 and 18 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Stamfordham Drive, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 May 2025 at 10:57.
17 Jul and 6 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Barnacre Drive, Parkgate, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:38.
17 Jul and 6 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Barnacre Drive, Parkgate, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 14:18.
17 Jul and 6 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Barnacre Drive, Parkgate, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 10:32.
18 Jul and 7 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Durning Road, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Apr 2025 at 09:52.
18 Jul and 7 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Durning Road, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Apr 2025 at 14:35.
21 Jul and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Barnacre Drive, Parkgate, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 10:05.
21 Jul and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Barnacre Drive, Parkgate, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 May 2025 at 12:09.
21 Jul and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Moreton Road, Upton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 09:18.
21 Jul and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Moreton Road, Upton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 14:21.
21 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Moreton Road, Upton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 16:30.
21 and 23 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Sherlock Lane, Poulton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Apr 2025 at 10:21.
24 Jul and 7 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Thorburn Close, New Ferry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 11:15.
24 Jul and 28 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on New Chester Road, New Ferry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 11:09.
28 Jul and 11 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Mobberley Way, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 09:24.
28 and 30 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Park Hill Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 May 2025 at 09:36.
28 and 30 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Park Hill Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 May 2025 at 11:04.
28 Jul and 8 Aug 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Harthill Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 10 Mar 2025 at 07:51.
28 Jul and 8 Aug 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Harthill Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 11 Mar 2025 at 09:58.
28 Jul and 8 Aug 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Harthill Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 11 Mar 2025 at 10:50.
28 and 30 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Noctorum Avenue, Noctorum.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 May 2025 at 10:31.
28 Jul and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road North, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 13:28.
28 Jul and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road North, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 09:31.
28 Jul and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Hunters Lane, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 13:24.
28 Jul and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Hunters Lane, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 09:30.
1 Aug and 5 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Mere Road, Raby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 30 Apr 2025 at 14:07.
1 Aug and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Hall Road, Raby Mere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 14:35.
1 Aug and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Road, Raby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 14:34.
1 Aug and 1 Oct 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Milner Road, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Apr 2025 at 11:23.
1 Aug and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 14:09.
1 Aug and 4 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Irby Road, Heswall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:00.
1 Aug 2025 and 1 Oct 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brackenwood Road, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Apr 2025 at 11:18.
1 Aug and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bracken Lane, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 14:32.
1 Aug and 5 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Grange Mount, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 16:30.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Conway Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:16.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hinson Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:15.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Marion Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:14.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Argyle Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:18.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Price Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:17.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hamilton Square, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 9 Apr 2025 at 11:38.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Cleveland Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 16:05.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Chester Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:11.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hamilton Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:21.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodside Ferry Approach, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:22.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on John Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 9 Apr 2025 at 11:43.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Canning Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:21.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:19.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Shore Road, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 9 Apr 2025 at 11:51.
1 Aug 2025 and 31 Jul 2027
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Argyle Street, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Apr 2025 at 11:13.
1 Aug and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Boundary Road, Bidston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 12:01.
4 and 6 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Stamfordham Drive, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 May 2025 at 15:05.
4 and 8 Aug 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Woodchurch Road, Prenton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 May 2025 at 12:33.
4 and 6 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Henry Street, Birkenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 May 2025 at 15:54.
4 and 7 Aug 2025
Cadent Gas are proposing to carry out New service connection on Mona Street, Claughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 14:17.
5 and 19 Aug 2025
ManWeb are proposing to carry out Remedial works on Brooks Alley, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 13 May 2025 at 10:44.
6 and 27 Aug 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out roadworks on Circular Drive, Port Sunlight.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 May 2025 at 13:38.
6 and 27 Aug 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out roadworks on Bebington Road, New Ferry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 May 2025 at 13:38.
6 and 27 Aug 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out New service connection on Boundary Road, New Ferry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 May 2025 at 13:38.
8 Aug and 6 Nov 2025
ManWeb are proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 16 May 2025 at 13:21.
8 and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Wheatland Lane, Seacombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 15:03.
8 and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Oakdale Road, Seacombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 10:45.
11 and 15 Aug 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Allerton Road, Mossley Hill, Liverpool.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 May 2025 at 12:45.
11 and 13 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Sinclair Drive, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 May 2025 at 12:18.
12 Aug and 2 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Braeside Gardens, Upton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 14:19.
18 Aug and 2 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Uplands Road, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 16:00.
18 Aug and 31 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 16 May 2025 at 14:05.
18 and 22 Aug 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Marquis Street, Liverpool.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 23 May 2025 at 16:36.
21 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Croft Avenue, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.
21 Aug and 18 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Elmwood Drive, Pensby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 16:00.
26 Aug and 30 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Hinderton Road, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 11:26.
Roadworks Map near to Richmond Road, WIRRAL, CH63 7QW (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Richmond Road, WIRRAL, CH63 7QW (51 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 May 2025 - 3 Jun 2025)
(Scheduled: 28 May 2025 - 3 Jun 2025)
(Scheduled: 31 May 2025 - 6 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.