ROADWORKS SUMMARY
Plymyard Avenue, WIRRAL, CH62 6BL
Introduction
View current and future planned roadworks and road closures for Plymyard Avenue, CH62 6BL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Plymyard Avenue, WIRRAL, CH62 6BL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Plymyard Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
28 Nov 2023 and 29 Nov 2024
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Chester High Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2023 and could run through until 29 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 20 Nov 2023 at 08:12.
1 May 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Gayton Road, Gayton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 09:59.
1 May 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Baumville Drive, Spital.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Nov 2024 at 13:49.
1 May 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Bellward Close, Spital.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Oct 2024 at 16:27.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Firs Avenue, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 13:58.
1 May 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Cross Street, Port Sunlight.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:21.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Derwent Road, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Mar 2024 at 15:15.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Shallmarsh Road, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 10:23.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on The Village, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 28 Feb 2024 at 10:43.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Orchard Way, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 15:48.
1 May 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Mount Road, Prenton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Nov 2024 at 13:49.
1 May 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Mount Road, Tranmere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:05.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Tranmere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 1 Mar 2024 at 11:47.
24 Jun 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bowness Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 26 Jun 2024 at 10:11.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Cedarway, Gayton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:41.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Dee Park Road, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:22.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Tudor Way, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 8 Jul 2024 at 12:47.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Cottesmore Drive, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:22.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Redmere Drive, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 14:17.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Mark Rake, Bromborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:24.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Parkwood Close, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 11:42.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Pine Avenue, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 10:14.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Firs Avenue, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:23.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Greendale Road, Port Sunlight.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:49.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Overdale Avenue, Barnston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:23.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Private Drive, Barnston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:30.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Greenlea Close, Bebington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:04.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Orchard Way, Higher Bebington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:23.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Easton Road, New Ferry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:47.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Howson Street, Rock Ferry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:59.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Walker Place, Tranmere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:11.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Walker Street, Tranmere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:12.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Parkside Road, Tranmere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:00.
29 Jul and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Nairn Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 10:31.
29 Jul and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Cullen Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 24 Jul 2024 at 13:17.
29 Jul and 30 Nov 2024
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Duncansby Drive, Eastham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 4 Sep 2024 at 09:39.
29 Jul and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kintore Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 10:31.
31 Jul 2024 and 17 Apr 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:54.
31 Jul 2024 and 17 Apr 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:52.
31 Jul 2024 and 17 Apr 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:53.
31 Jul 2024 and 17 Apr 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:51.
30 Aug and 30 Nov 2024
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Cullen Close, Eastham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 August 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 4 Sep 2024 at 09:41.
9 Sep and 12 Dec 2024
The Environment Agency are proposing to carry out Section 50 on Chase Way, Great Sutton, Ellesmere Port.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by The Environment Agency on 23 Apr 2024 at 12:25.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 25 Jun 2024 at 10:28.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 31 Jul 2024 at 16:03.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 25 Jun 2024 at 10:27.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 31 Jul 2024 at 16:10.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 09:39.
7 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rest Hill Road, Storeton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Aug 2024 at 14:22.
7 Oct 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Rest Hill Road, Storeton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Aug 2024 at 14:20.
7 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Town Lane, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 27 Aug 2024 at 14:19.
11 Oct 2024 and 29 Jan 2025
The Environment Agency are proposing to carry out Utility repair and maintenance works on Chase Way, Great Sutton, Ellesmere Port.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2024 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by The Environment Agency on 30 Jul 2024 at 10:28.
14 Oct 2024 and 31 Jan 2025
The Environment Agency are proposing to carry out Utility repair and maintenance works on Chase Way, Great Sutton, Ellesmere Port.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by The Environment Agency on 13 Sep 2024 at 15:47.
31 Jan 2025
The Environment Agency are carrying out Utility repair and maintenance works on Chase Way, Great Sutton, Ellesmere Port.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by The Environment Agency on 14 Oct 2024 at 09:41.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Trent Way, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:51.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Porlock Close, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:50.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Lynton Close, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:31.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Parklands Drive, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:50.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Beverley Drive, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 12:46.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Dunster Grove, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:30.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hessle Drive, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:30.
21 Oct and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Park Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 14:36.
21 Oct and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Park Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 12:43.
21 Oct and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Park Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:58.
4 Nov and 1 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bull Hill, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 13:06.
4 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Town Lane, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 13:06.
Tomorrow
BT were proposing to carry out Utility asset works on Brimstage Road, Brimstage.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Aug 2024 at 09:09.
Tomorrow
BT were proposing to carry out Utility asset works on Green Bank, Brimstage.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 22 Aug 2024 at 09:09.
4 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on King Street, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 13:22.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Banks Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 13:24.
Tomorrow
ManWeb are proposing to carry out Utility repair and maintenance works on Cambridge Road, Prenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 13 Aug 2024 at 13:59.
Wednesday
Cadent Gas are proposing to carry out Utility asset works on Woodfall Lane, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 14:38.
Wednesday
Cadent Gas were proposing to carry out Utility asset works on Bull Hill, Little Neston, Neston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:57.
Wednesday
Cadent Gas were proposing to carry out Utility asset works on Town Lane, Neston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 15:00.
11 Nov and 8 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Woodfall Lane, Little Neston, Neston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 15:02.
11 and 29 Nov 2024
ManWeb were proposing to carry out Utility repair and maintenance works on Cambridge Road, Prenton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 23 Aug 2024 at 09:36.
11 and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Elmswood Road, Mossley Hill, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:09.
11 and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Elmswood Road, Mossley Hill, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 08:53.
11 and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Elmswood Road, Mossley Hill, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:56.
Monday
Cadent Gas are carrying out Utility asset works on Elmswood Road, Mossley Hill, Liverpool.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 12:36 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:40.
11 Nov and 13 Dec 2024
Liverpool City Council are proposing to carry out Highway improvement works on Palmerston Road, Mossley Hill, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Liverpool City Council on 1 Nov 2024 at 00:53.
11 Nov and 13 Dec 2024
Liverpool City Council are proposing to carry out Highway improvement works on Palmerston Road, Mossley Hill, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Liverpool City Council on 1 Nov 2024 at 08:29.
12 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Tramway Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:35.
29 Nov 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Old Hall Road, Bromborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 19:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 15 Nov 2024 at 14:26.
13 Nov 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Thursby Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:32.
Tomorrow
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Easton Road, New Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 24 Oct 2024 at 16:42.
15 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Window Lane, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 15:37.
18 Nov and 4 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Parkgate, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 07:49.
18 Nov and 4 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Parkgate, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:38.
18 Nov and 4 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Parkgate, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 09:42.
18 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ringway, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:19.
18 Nov 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Willowbrow Road, Raby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:40.
18 Nov 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 14:26.
18 Nov 2024 and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.
18 Nov 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinglass Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:46.
18 Nov 2024 and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.
18 Nov 2024 and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.
18 Nov 2024 and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.
18 Nov 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:53.
18 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Blackburne Street, Liverpool.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 13:20.
18 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on New Chester Road, Rock Ferry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 16:44.
18 Nov and 6 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on New Chester Road, Rock Ferry.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:47.
9 Dec 2024
Cadent Gas are carrying out Utility asset works on Aigburth Road, St Michaels, Liverpool.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 07:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 08:48.
18 Nov and 27 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Holt Road, Tranmere.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:05.
18 Nov and 22 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Old Chester Road, Tranmere.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:06.
19 Nov and 3 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 4 Sep 2024 at 15:07.
Tomorrow
ManWeb are carrying out Utility repair and maintenance works on Cottage Lane, Gayton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 16:35 and could run through until 22 November 2024. The works will impact the verge only.
This roadwork event was last updated by ManWeb on 21 Nov 2024 at 07:51.
11 Dec 2024
Cadent Gas are carrying out Utility asset works on King Street, Liverpool.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 07:48 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 08:28.
21 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Blackburne Street, Liverpool.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:30.
Wednesday
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Newnham Drive, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 18 Nov 2024 at 13:56.
Wednesday
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Newnham Drive, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 18 Nov 2024 at 14:39.
25 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rockfarm Drive, Little Neston, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 08:44.
25 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rockfarm Drive, Little Neston, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 09:55.
25 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rockfarm Drive, Little Neston, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:03.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Mayfield Gardens, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:20.
25 Nov and 13 Dec 2024
BT are proposing to carry out Utility asset works on Brimstage Road, Brimstage.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2024 at 13:29.
25 Nov and 13 Dec 2024
BT are proposing to carry out Utility asset works on Green Bank, Brimstage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2024 at 13:29.
25 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ebenezer Street, Rock Ferry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 16:24.
25 Nov and 10 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Ebenezer Street, Rock Ferry.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:49.
25 Nov and 9 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Church Road, Tranmere.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:10.
25 Nov and 9 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Hampden Road, Tranmere.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:08.
28 Nov and 12 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 5 Sep 2024 at 15:29.
29 Nov and 13 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 12 Sep 2024 at 10:47.
29 Nov and 13 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 12 Sep 2024 at 10:47.
29 Nov 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Borough Road, Birkenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 28 Oct 2024 at 16:52.
2 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rockfarm Close, Little Neston, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 08:43.
2 and 23 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Window Lane, Liverpool.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 15:39.
2 and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Banks Road, Liverpool.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 15:18.
2 and 6 Dec 2024
Liverpool City Council are proposing to carry out Highway repair and maintenance works on St Marys Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Liverpool City Council on 14 Nov 2024 at 13:27.
2 and 6 Dec 2024
Liverpool City Council are proposing to carry out Highway repair and maintenance works on St Marys Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Liverpool City Council on 14 Nov 2024 at 13:29.
5 Dec 2024 and 16 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:42.
9 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Buildwas Road, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:20.
11 and 27 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 25 Sep 2024 at 11:19.
11 and 27 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 25 Sep 2024 at 11:19.
16 and 18 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Desford Road, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Sep 2024 at 12:11.
19 Dec 2024 and 7 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 8 Nov 2024 at 15:34.
19 Dec 2024 and 7 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 8 Nov 2024 at 15:29.
23 Dec 2024 and 15 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Elmswood Road, Mossley Hill, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 07:55.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Aigburth Road, St Michaels, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:09.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Aigburth Road, St Michaels, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:13.
2 Jan and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Park Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 16:26.
2 Jan and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Park Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:25.
6 and 8 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 24 Oct 2024 at 11:27.
6 and 8 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 24 Oct 2024 at 11:37.
6 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Brimstage Road, Brimstage.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Sep 2024 at 10:46.
6 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Brimstage Road, Brimstage.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Nov 2024 at 11:28.
6 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Green Bank, Brimstage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 5 Sep 2024 at 10:32.
6 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Green Bank, Brimstage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Nov 2024 at 11:28.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Aigburth Road, St Michaels, Liverpool.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 15:49.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Normanton Avenue, Liverpool.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 12:57.
11 Jan and 8 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on North Mossley Hill Road, Liverpool.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 12:58.
13 and 15 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 21 Oct 2024 at 12:05.
13 Jan and 28 Feb 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Town Lane, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 20 Nov 2024 at 15:17.
13 and 24 Jan 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bebington Road, New Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 29 Oct 2024 at 08:20.
13 Jan and 22 Feb 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Easton Road, New Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 21 Nov 2024 at 08:49.
20 and 27 Jan 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Thursby Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 13:33.
22 and 29 Jan 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Nov 2024 at 09:34.
3 and 5 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Cottage Lane, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.
This roadwork event was last updated by ManWeb on 12 Nov 2024 at 09:55.
10 and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Merseybank Road, New Ferry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:02.
12 and 17 Feb 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Willowbrow Road, Raby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:07.
14 and 18 Feb 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Nov 2024 at 10:03.
17 and 19 Feb 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinglass Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:08.
17 Feb and 6 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Shorefields, New Ferry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:27.
Roadworks Map near to Plymyard Avenue, WIRRAL, CH62 6BL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Plymyard Avenue, WIRRAL, CH62 6BL (32 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.