ROADWORKS SUMMARY
Mere Lane, WALLASEY, CH45 3HY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mere Lane, CH45 3HY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Mere Lane, WALLASEY, CH45 3HY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mere Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Liverpool City Council logo
LONG TERM
Between
13 Mar 2023 and 10 Mar 2025
Details
View Map
Share
Follow
Lawton Street

Liverpool City Council are proposing to carry out Highway improvement works on Lawton Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2023 and could run through until 10 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 21 Feb 2023 at 16:10.

Liverpool City Council logo
LONG TERM
Between
14 May 2023 and 31 Jan 2025
Details
View Map
Share
Follow
King Edward Street

Liverpool City Council are proposing to carry out Highway improvement works on King Edward Street, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2023 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 21 Apr 2023 at 12:28.

Liverpool City Council logo
LONG TERM
Between
18 Jun 2023 and 19 Dec 2024
Details
View Map
Share
Follow
Shaws Alley

Liverpool City Council are proposing to carry out Highway improvement works on Shaws Alley, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2023 and could run through until 19 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 14 Aug 2023 at 05:52.

Liverpool City Council logo
LONG TERM
Between
3 Sep 2023 and 7 Sep 2025
Details
View Map
Share
Follow
Falkner Street

Liverpool City Council are proposing to carry out Highway improvement works on Falkner Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2023 and could run through until 7 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 5 Oct 2023 at 13:03.

Wirral Borough Council logo
LONG TERM
Between
6 Jan 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Woodchurch Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodchurch Road, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 26 Nov 2024 at 15:25.

Wirral Borough Council logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Europa Square

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Europa Square, Birkenhead.

These works are categorised as Major.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 15 Nov 2023 at 15:29.

Liverpool City Council logo
LONG TERM
Between
18 Mar 2024 and 9 Jun 2025
Details
View Map
Share
Follow
Upper Duke Street

Liverpool City Council are proposing to carry out Highway improvement works on Upper Duke Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 9 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 11 Jun 2024 at 08:29.

Wirral Borough Council logo
LONG TERM
Between
31 Mar 2024 and 31 Aug 2025
Details
View Map
Share
Follow
Park Street

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Park Street, Birkenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 31 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 10 Nov 2023 at 12:28.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2024 and 31 Aug 2025
Details
View Map
Share
Follow
Oxton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Oxton Road, Birkenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 10 Nov 2023 at 12:29.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2024 and 31 Aug 2025
Details
View Map
Share
Follow
Charing Cross

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Charing Cross, Birkenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 10 Nov 2023 at 12:30.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Exmouth Street

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Exmouth Street, Birkenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 10 Nov 2023 at 12:30.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2024 and 1 Sep 2025
Details
View Map
Share
Conway Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Conway Street, Birkenhead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2024 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 19 Nov 2024 at 14:35.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2024 and 1 Sep 2025
Details
View Map
Share
Follow
St Laurence Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on St Laurence Drive, Birkenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 10 Nov 2023 at 12:28.

Liverpool City Council logo
LONG TERM
Between
1 Apr 2024 and 10 Apr 2025
Details
View Map
Share
Follow
Cheapside

Liverpool City Council are proposing to carry out Highway improvement works on Cheapside, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 10 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 2 Feb 2024 at 14:56.

Wirral Borough Council logo
LONG TERM
Between
30 Apr 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huxley Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Huxley Close, Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 15 Apr 2024 at 13:21.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Mount Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Mount Road, Prenton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 19 Nov 2024 at 13:49.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Mount Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Mount Road, Tranmere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:05.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Carr Hey Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Carr Hey Close, Woodchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Apr 2024 at 14:30.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Arrowe Brook Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Arrowe Brook Road, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 20 Feb 2024 at 15:05.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Hambledon Drive

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Hambledon Drive, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:00.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Chidden Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Chidden Close, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:40.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Church Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Tranmere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 1 Mar 2024 at 11:47.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Beauworth Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Beauworth Avenue, Greasby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 22 Feb 2024 at 13:43.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Finchdean Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Finchdean Close, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 09:39.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Bromsgrove Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Bromsgrove Road, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:35.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Redford Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Redford Close, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:10.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Houghton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Houghton Road, Woodchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 4 Apr 2024 at 13:37.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Thresher Avenue

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Thresher Avenue, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:15.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Flail Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Flail Close, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 09:44.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
The Scythes

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on The Scythes, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:14.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Pitch Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Pitch Close, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:09.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Churn Way

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Churn Way, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:41.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
The Barncroft

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on The Barncroft, Greasby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:13.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Dunning Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Dunning Close, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:48.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Mesham Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Mesham Close, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:04.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Tunstall Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Tunstall Close, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:17.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Rendelsham Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Rendelsham Close, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:11.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Stonham Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Stonham Close, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:12.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Bramford Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Bramford Close, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:34.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Trimley Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Trimley Close, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:16.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Whitelands Meadow

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Whitelands Meadow, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:18.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Melton Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Melton Close, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:02.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Borough Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Borough Road, Birkenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 27 Feb 2024 at 14:15.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Borough Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Borough Road, Birkenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 27 Feb 2024 at 14:15.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Norwich Drive

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Norwich Drive, Upton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:06.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Brook Street East

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Brook Street East, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:19.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Wood Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Wood Close, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:19.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Brook Street

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brook Street, Birkenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Apr 2024 at 14:19.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Birkenhead Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Birkenhead Road, Meols.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 26 Feb 2024 at 12:26.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Ballantyne Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ballantyne Drive, Bidston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 22 Feb 2024 at 14:48.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Balliol Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Balliol Close, Bidston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 22 Feb 2024 at 14:48.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Docks Link

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Docks Link, Poulton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:43.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Daresbury Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Road, Liscard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 13 Mar 2024 at 11:32.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Longacre Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Longacre Close, Wallasey Village.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:10.

Wirral Borough Council logo
LONG TERM
Between
10 May 2024 and 31 Mar 2025
Details
View Map
Share
Dock Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Dock Road, Poulton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:42.

Liverpool City Council logo
LONG TERM
Between
19 May 2024 and 19 Aug 2025
Details
View Map
Share
Follow
Cheapside Alley

Liverpool City Council are proposing to carry out Highway improvement works on Cheapside Alley, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 19 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 16 May 2024 at 06:31.

Liverpool City Council logo
LONG TERM
Between
2 Jun 2024 and 19 Aug 2025
Details
View Map
Share
Follow
Cunliffe Street

Liverpool City Council are proposing to carry out Highway improvement works on Cunliffe Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 19 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 16 May 2024 at 06:33.

Wirral Borough Council logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
Conway Street

Wirral Borough Council are carrying out Highway repair and maintenance works on Conway Street, Birkenhead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 June 2024 at 08:00 and could run through until 16 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wirral Borough Council on 26 Jul 2024 at 08:10.

Wirral Borough Council logo
LONG TERM
Between
24 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Carr Bridge Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Carr Bridge Road, Woodchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:42.

Wirral Borough Council logo
LONG TERM
Between
24 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Brattan Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Brattan Road, Oxton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:18.

Wirral Borough Council logo
LONG TERM
Between
24 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Brimstage Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Brimstage Street, Oxton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:40.

Wirral Borough Council logo
LONG TERM
Between
24 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Carr Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Carr Lane, Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 20 Jun 2024 at 13:40.

Wirral Borough Council logo
LONG TERM
Between
24 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Burden Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Burden Road, Moreton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:20.

Wirral Borough Council logo
LONG TERM
Until
3 Jan 2025
Details
View Map
Share
Follow
Grange Road West

Wirral Borough Council are carrying out Highway repair and maintenance works on Grange Road West, Birkenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 2 Oct 2024 at 21:24.

Wirral Borough Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Charing Cross

Wirral Borough Council are carrying out Highway repair and maintenance works on Charing Cross, Birkenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 4 Oct 2024 at 15:39.

Wirral Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Europa Boulevard

Wirral Borough Council are carrying out Highway repair and maintenance works on Europa Boulevard, Birkenhead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 18 Jul 2024 at 15:48.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Hoole Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hoole Road, Woodchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 3 Jul 2024 at 11:04.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Howson Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Howson Street, Rock Ferry.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:59.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Springfield Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Springfield Close, Woodchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 8 Jul 2024 at 08:33.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Pemberton Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Pemberton Road, Woodchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:30.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Grasswood Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Grasswood Road, Woodchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:51.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Calveley Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Calveley Close, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:40.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Walker Place

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Walker Place, Tranmere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:11.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Walker Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Walker Street, Tranmere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:12.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Parkside Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Parkside Road, Tranmere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:00.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Leeswood Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Leeswood Road, Woodchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:06.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Orrets Meadow Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Orrets Meadow Road, Woodchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:28.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Devonshire Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Devonshire Road, Oxton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:46.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Thomas Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Thomas Street, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:13.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Monks Ferry

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Monks Ferry, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:27.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Park Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Park Street, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:59.

Liverpool City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Catharine Street

Liverpool City Council are proposing to carry out Highway improvement works on Catharine Street, Liverpool.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 28 November 2024. The works will impact the footway, carriageway, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 26 Jun 2024 at 15:05.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Freeman Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Freeman Street, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:22.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Marcus Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Marcus Street, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:08.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Kinnerton Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinnerton Close, Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 14:17.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Vittoria Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Vittoria Street, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:10.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Deneshey Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Deneshey Road, Hoylake.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:45.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Huntington Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Huntington Close, Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 14:17.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Tarran Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Tarran Road, Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 14:14.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Tarran Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Tarran Drive, Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 14:14.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Cheltenham Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Cheltenham Road, Wallasey Village.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 10:48.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
St Georges Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on St Georges Road, Wallasey Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 19 Jul 2024 at 10:22.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Sefton Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Sefton Road, New Brighton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 12:02.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Shiel Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Shiel Road, New Brighton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:58.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Churton Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Churton Avenue, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 24 Jul 2024 at 13:53.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Carrow Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Carrow Close, Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 10:05.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Keele Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Keele Close, Bidston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 07:25.

Wirral Borough Council logo
LONG TERM
Between
19 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Chidden Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Chidden Close, Greasby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 8 Aug 2024 at 11:36.

Wirral Borough Council logo
LONG TERM
Between
19 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Finchdean Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Finchdean Close, Greasby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 8 Aug 2024 at 11:02.

Wirral Borough Council logo
LONG TERM
Between
19 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Redford Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Redford Close, Greasby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 8 Aug 2024 at 11:48.

Wirral Borough Council logo
LONG TERM
Between
19 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Thresher Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Thresher Avenue, Greasby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 8 Aug 2024 at 12:04.

Wirral Borough Council logo
LONG TERM
Between
26 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Flail Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Flail Close, Greasby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 21 Aug 2024 at 15:01.

Wirral Borough Council logo
LONG TERM
Between
26 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Pitch Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Pitch Close, Greasby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 21 Aug 2024 at 15:08.

Wirral Borough Council logo
LONG TERM
Between
26 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Norwich Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Norwich Drive, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 21 Aug 2024 at 16:01.

Wirral Borough Council logo
LONG TERM
Between
26 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Marsham Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Marsham Close, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 21 Aug 2024 at 15:22.

Wirral Borough Council logo
LONG TERM
Between
26 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Hunstanton Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hunstanton Close, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 21 Aug 2024 at 16:10.

Wirral Borough Council logo
LONG TERM
Between
26 Aug 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Dereham Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Dereham Avenue, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 21 Aug 2024 at 15:47.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Hoole Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Hoole Road, Woodchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 13:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Oct 2024 at 13:52.

Wirral Borough Council logo
LONG TERM
Between
16 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Ganneys Meadow Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ganneys Meadow Road, Woodchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 08:58.

Wirral Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Ganneys Meadow Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Ganneys Meadow Road, Woodchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 10:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 24 Sep 2024 at 09:25.

Wirral Borough Council logo
LONG TERM
Between
7 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Sheringham Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Sheringham Close, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 28 Aug 2024 at 09:55.

Liverpool City Council logo
LONG TERM
Between
7 Oct 2024 and 27 Jun 2025
Details
View Map
Share
Follow
Priory Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Priory Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 27 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 13 Sep 2024 at 08:34.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
7 Oct 2024 and 25 Feb 2025
Details
View Map
Share
Follow
Netherton Way

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Netherton Way, Bootle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 29 Aug 2024 at 13:20.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Grange View

Wirral Borough Council are carrying out Highway repair and maintenance works on Grange View, Birkenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 09:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 4 Nov 2024 at 09:02.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Lycett Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Lycett Road, Wallasey Village.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 29 Oct 2024 at 17:06.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Dean Avenue

Wirral Borough Council are carrying out Highway repair and maintenance works on Dean Avenue, Wallasey Village.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 29 Oct 2024 at 17:09.

Wirral Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Berrylands Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Berrylands Road, Moreton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 09:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 4 Nov 2024 at 08:56.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Berrylands Close

Wirral Borough Council are carrying out Highway repair and maintenance works on Berrylands Close, Moreton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 09:30 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Oct 2024 at 21:47.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Bramble Way

Wirral Borough Council are carrying out Highway repair and maintenance works on Bramble Way, Moreton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 09:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Oct 2024 at 21:51.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Shrewsbury Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Shrewsbury Drive, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 11:53.

Wirral Borough Council logo
LONG TERM
Until
1 Nov 2025
Details
View Map
Share
Follow
Charing Cross

Wirral Borough Council are carrying out Highway repair and maintenance works on Charing Cross, Birkenhead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:00 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 17 Oct 2024 at 11:02.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Hilary Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hilary Drive, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 11:47.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Oakland Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Oakland Drive, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 10:39.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Arborn Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Arborn Drive, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 10:46.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Hill View Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hill View Drive, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 11:13.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Litcham Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Litcham Close, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 28 Aug 2024 at 11:40.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Thornham Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Thornham Close, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 10:25.

Wirral Borough Council logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Glebelands Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Glebelands Road, Moreton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 24 Oct 2024 at 15:00.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Raleigh Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Raleigh Road, Leasowe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:30 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 24 Oct 2024 at 08:54.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Pickerill Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Pickerill Road, Greasby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 29 Oct 2024 at 17:12.

Liverpool City Council logo
LONG TERM
Between
21 Oct 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Priory Road

Liverpool City Council are proposing to carry out Highway improvement works on Priory Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Liverpool City Council on 8 Oct 2024 at 12:00.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Circular Drive

Wirral Borough Council are carrying out Highway repair and maintenance works on Circular Drive, Greasby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Oct 2024 at 21:52.

Wirral Borough Council logo
LONG TERM
Until
22 Nov 2025
Details
View Map
Share
Follow
Exmouth Street

Wirral Borough Council are carrying out Highway repair and maintenance works on Exmouth Street, Birkenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 08:30 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 19 Nov 2024 at 15:28.

Wirral Borough Council logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Noctorum Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Noctorum Road, Noctorum.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 10:00 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Oct 2024 at 21:54.

Wirral Borough Council logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Noctorum Lane

Wirral Borough Council are carrying out Highway repair and maintenance works on Noctorum Lane, Bidston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 09:30 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Oct 2024 at 21:53.

Wirral Borough Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lennox Lane

Wirral Borough Council are carrying out Highway repair and maintenance works on Lennox Lane, Bidston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 28 Oct 2024 at 16:51.

Wirral Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Farndon Way

Wirral Borough Council are carrying out Highway repair and maintenance works on Farndon Way, Oxton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 6 Nov 2024 at 14:23.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Vauxhall Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Vauxhall Road, City Centre, Liverpool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:12 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Nov 2024 at 09:47.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Liscard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 07:55.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Station Road

Cadent Gas were proposing to carry out Utility asset works on Station Road, Liscard.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 15:20.

Wirral Borough Council logo
LONG TERM
Between
4 Nov 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Leasowe Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Leasowe Road, Leasowe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 24 Oct 2024 at 15:14.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Great Georges Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Great Georges Road, Waterloo.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 29 Oct 2024 at 16:44.

Liverpool City Council logo
LONG TERM
Between
10 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Catharine Street

Liverpool City Council are proposing to carry out Highway improvement works on Catharine Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 4 Nov 2024 at 09:50.

ManWeb logo
Finishing
Friday
Details
View Map
Share
Cambridge Road

ManWeb were proposing to carry out Utility repair and maintenance works on Cambridge Road, Prenton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 23 Aug 2024 at 09:36.

Cadent Gas logo
Between
11 Nov and 5 Dec 2024
Details
View Map
Share
Follow
St James Place

Cadent Gas are proposing to carry out Utility asset works on St James Place, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 13:37.

Liverpool City Council logo
LONG TERM
Between
11 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Catharine Street

Liverpool City Council are proposing to carry out Highway improvement works on Catharine Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Liverpool City Council on 31 Oct 2024 at 15:31.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Netherton Way

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Netherton Way, Bootle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 1 Oct 2024 at 14:31.

Liverpool City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Street

Liverpool City Council are carrying out Highway repair and maintenance works on Victoria Street, Liverpool Two, Liverpool.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 22 Nov 2024 at 13:43.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
New Chester Road

Cadent Gas are proposing to carry out Utility asset works on New Chester Road, Rock Ferry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 16:44.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
New Chester Road

Cadent Gas were proposing to carry out Utility asset works on New Chester Road, Rock Ferry.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:47.

Cadent Gas logo
LONG TERM
Between
18 Nov and 27 Dec 2024
Details
View Map
Share
Holt Road

Cadent Gas were proposing to carry out Utility asset works on Holt Road, Tranmere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:05.

Cadent Gas logo
LONG TERM
Between
18 Nov and 22 Dec 2024
Details
View Map
Share
Old Chester Road

Cadent Gas were proposing to carry out Utility asset works on Old Chester Road, Tranmere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:06.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Gerald Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 14:19.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Noctorum Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Noctorum Avenue, Noctorum.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 14:33.

United Utilities Water (formerly North West Water) logo
Finishing
Monday
Details
View Map
Share
Follow
Princes Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Princes Avenue, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Aug 2024 at 14:41.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Burford Avenue

Cadent Gas were proposing to carry out Utility asset works on Burford Avenue, Liscard.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 3 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 15:23.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Liscard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 14:42.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Harrison Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harrison Drive, Wallasey Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 14:59.

Liverpool City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Bankhall Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Bankhall Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 19 Nov 2024 at 14:51.

Cadent Gas logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Claremont Road

Cadent Gas are proposing to carry out Utility asset works on Claremont Road, Seaforth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2024 at 06:15.

Cadent Gas logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Claremont Road

Cadent Gas are carrying out Utility asset works on Claremont Road, Seaforth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:35.

Wirral Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Columbia Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Columbia Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 24 Oct 2024 at 16:48.

Wirral Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Columbia Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Columbia Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 24 Oct 2024 at 16:48.

Between
20 Nov and 10 Dec 2024
Details
View Map
Share
Vauxhall Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Vauxhall Road, City Centre, Liverpool.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 11:40.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Footpath At Upton Meadow

Cadent Gas are carrying out Utility repair and maintenance works on Footpath At Upton Meadow, Upton.

The works started on 21 November 2024 at 10:07 and could run through until 28 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 16:30.

Cadent Gas logo
Between
25 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Ebenezer Street

Cadent Gas are proposing to carry out Utility asset works on Ebenezer Street, Rock Ferry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 16:24.

Cadent Gas logo
Between
25 Nov and 10 Dec 2024
Details
View Map
Share
Ebenezer Street

Cadent Gas were proposing to carry out Utility asset works on Ebenezer Street, Rock Ferry.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:49.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Church Road

Cadent Gas were proposing to carry out Utility asset works on Church Road, Tranmere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:10.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Hampden Road

Cadent Gas were proposing to carry out Utility asset works on Hampden Road, Tranmere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:08.

Liverpool City Council logo
Finishing
Today
Details
View Map
Share
Follow
Clegg Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Clegg Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 4 Nov 2024 at 11:27.

Liverpool City Council logo
Finishing
Today
Details
View Map
Share
Follow
Clegg Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Clegg Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 4 Nov 2024 at 12:21.

Liverpool City Council logo
Finishing
Today
Details
View Map
Share
Follow
Iliad Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Iliad Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 4 Nov 2024 at 11:32.

Liverpool City Council logo
Finishing
Today
Details
View Map
Share
Follow
Iliad Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Iliad Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 4 Nov 2024 at 12:19.

Sefton Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Great Georges Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Great Georges Road, Waterloo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 29 Oct 2024 at 16:43.

Cadent Gas logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Springfield Avenue

Cadent Gas were proposing to carry out Utility asset works on Springfield Avenue, Litherland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:18.

Sefton Metropolitan Borough Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Netherton Way

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Netherton Way, Bootle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 11 Nov 2024 at 11:59.

Wirral Borough Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Woodchurch Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Woodchurch Road, Oxton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 26 Nov 2024 at 11:41.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Church Road, Walton, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 09:30.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Church Road, Walton, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 10:13.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Road West

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Church Road West, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 09:42.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Road West

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Church Road West, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 10:16.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Weldon Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Weldon Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 10:22.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Weldon Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Weldon Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 10:26.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Liston Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Liston Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 13:56.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Liston Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Liston Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 14:05.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Liston Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Liston Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 14:05.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Olney Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Olney Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 10:21.

Liverpool City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Olney Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Olney Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 10:21.

Liverpool City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Boaler Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Boaler Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 7 Nov 2024 at 11:01.

Liverpool City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Boaler Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Boaler Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 7 Nov 2024 at 11:21.

Cadent Gas logo
Between
28 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Smith Street

Cadent Gas are proposing to carry out Utility asset works on Smith Street, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:51.

Wirral Borough Council logo
LONG TERM
Between
29 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Borough Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Borough Road, Birkenhead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 28 Oct 2024 at 16:52.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Prestbury Avenue

Cadent Gas are proposing to carry out Utility asset works on Prestbury Avenue, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:24.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Prestbury Avenue

Cadent Gas are proposing to carry out Utility repair and maintenance works on Prestbury Avenue, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 13:25.

Virgin Media logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Dale Street

Virgin Media were proposing to carry out Utility asset works on Dale Street, City Centre, Liverpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Aug 2024 at 09:49.

Liverpool City Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Great Homer Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Great Homer Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 18 Nov 2024 at 09:19.

Liverpool City Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Great Homer Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Great Homer Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 18 Nov 2024 at 09:19.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Jamaica Street

ManWeb are proposing to carry out Utility repair and maintenance works on Jamaica Street, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Sep 2024 at 11:52.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, City Centre, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Sep 2024 at 11:25.

ManWeb logo
Between
3 and 31 Dec 2024
Details
View Map
Share
Follow
Liver Street

ManWeb are proposing to carry out Utility repair and maintenance works on Liver Street, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 4 Sep 2024 at 11:24.

ManWeb logo
Between
3 and 21 Dec 2024
Details
View Map
Share
Follow
Paradise Street

ManWeb are proposing to carry out Utility repair and maintenance works on Paradise Street, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Sep 2024 at 11:39.

Liverpool City Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Leeds Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Leeds Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 19 Nov 2024 at 12:29.

Liverpool City Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Leeds Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Leeds Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 19 Nov 2024 at 12:29.

Liverpool City Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Well Brow Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Well Brow Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 19 Nov 2024 at 12:16.

Liverpool City Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Well Brow Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Well Brow Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 19 Nov 2024 at 12:18.

Liverpool City Council logo
Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Mere Lane

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Mere Lane, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 26 Nov 2024 at 07:39.

Liverpool City Council logo
Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Mere Lane

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Mere Lane, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 26 Nov 2024 at 07:39.

ManWeb logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Woodhouse Close

ManWeb were proposing to carry out Utility repair and maintenance works on Woodhouse Close, Liverpool.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 16 Sep 2024 at 14:26.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Aylesbury Avenue

Cadent Gas are proposing to carry out Utility asset works on Aylesbury Avenue, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 22:02.

Cadent Gas logo
Between
9 and 24 Dec 2024
Details
View Map
Share
Follow
Smith Street

Cadent Gas are proposing to carry out Utility asset works on Smith Street, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 09:23.

Network Rail logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hall Road East

Network Rail are proposing to carry out Works for Rail Purposes on Hall Road East, Crosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Sep 2024 at 08:13.

Network Rail logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hall Road East

Network Rail are proposing to carry out Works for Rail Purposes on Hall Road East, Crosby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 10:03.

Liverpool City Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Penrose Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Penrose Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 21 Nov 2024 at 13:42.

Liverpool City Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Penrose Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Penrose Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 21 Nov 2024 at 13:43.

United Utilities Water (formerly North West Water) logo
Between
16 and 24 Dec 2024
Details
View Map
Share
Follow
Bowles Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bowles Street, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Sep 2024 at 09:24.

United Utilities Water (formerly North West Water) logo
Between
16 and 24 Dec 2024
Details
View Map
Share
Bowles Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Bowles Street, Bootle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Oct 2024 at 08:10.

Cadent Gas logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Landican Lane

Cadent Gas are proposing to carry out New service connection on Landican Lane, Landican.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:51.

Liverpool City Council logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Warbreck Road

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Warbreck Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 26 Nov 2024 at 20:55.

Sefton Metropolitan Borough Council logo
Between
20 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Netherton Way

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Netherton Way, Bootle.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 20 December 2024 and could run through until 6 January 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 22 Nov 2024 at 14:57.

Cadent Gas logo
Between
23 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Park Place

Cadent Gas are proposing to carry out Utility asset works on Park Place, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 12:46.

Cadent Gas logo
Between
23 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Park Place

Cadent Gas are proposing to carry out Utility asset works on Park Place, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 11:30.

Cadent Gas logo
LONG TERM
Between
2 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:42.

Cadent Gas logo
Between
2 and 16 Jan 2025
Details
View Map
Share
Follow
Warwick Street

Cadent Gas are proposing to carry out Utility asset works on Warwick Street, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 08:56.

Cadent Gas logo
Between
2 and 21 Jan 2025
Details
View Map
Share
Follow
Shaws Drive

Cadent Gas are proposing to carry out Utility asset works on Shaws Drive, Meols.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:06.

Between
2 and 6 Jan 2025
Details
View Map
Share
City Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on City Road, Liverpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 6 January 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 15:50.

Cadent Gas logo
Between
2 and 16 Jan 2025
Details
View Map
Share
Follow
Kirkdale Road

Cadent Gas are proposing to carry out Utility asset works on Kirkdale Road, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:40.

Liverpool City Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Russell Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Russell Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 14 Nov 2024 at 13:56.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Kirkdale Road

Cadent Gas are proposing to carry out Utility asset works on Kirkdale Road, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 08:26.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Smith Street

Cadent Gas are proposing to carry out Utility asset works on Smith Street, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 08:26.

Cadent Gas logo
Between
8 and 28 Jan 2025
Details
View Map
Share
Follow
Prestbury Avenue

Cadent Gas are proposing to carry out Utility repair and maintenance works on Prestbury Avenue, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 15:36.

United Utilities Water (formerly North West Water) logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Hope Place

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Hope Place, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Sep 2024 at 11:44.

Cadent Gas logo
Between
9 and 30 Jan 2025
Details
View Map
Share
Follow
Ethelbert Road

Cadent Gas are proposing to carry out Utility asset works on Ethelbert Road, Meols.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:41.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Aldford Close

Cadent Gas are proposing to carry out Utility asset works on Aldford Close, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 15:38.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Aldford Close

Cadent Gas are proposing to carry out Utility asset works on Aldford Close, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 14:21.

Cadent Gas logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 13:21.

Cadent Gas logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:36.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Warwick Street

Cadent Gas are proposing to carry out Utility asset works on Warwick Street, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 15:51.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Warwick Street

Cadent Gas were proposing to carry out Utility asset works on Warwick Street, Liverpool.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:43.

Electricity Network Company logo
Between
13 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Upper Duke Street

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Upper Duke Street, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Oct 2024 at 09:32.

Electricity Network Company logo
Between
13 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Back Knight Street

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Back Knight Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 8 Oct 2024 at 09:33.

Electricity Network Company logo
Between
13 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Knight Street

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Knight Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Oct 2024 at 09:32.

Electricity Network Company logo
Between
13 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Berry Street

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Berry Street, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Oct 2024 at 09:33.

Electricity Network Company logo
Between
13 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Berry Street

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Berry Street, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Oct 2024 at 11:51.

Liverpool City Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Russell Street

Liverpool City Council are proposing to carry out Highway repair and maintenance works on Russell Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Liverpool City Council on 15 Nov 2024 at 08:12.

Wirral Borough Council logo
LONG TERM
Between
13 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Wallasey Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Wallasey Road, Liscard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 28 Oct 2024 at 15:18.

Sefton Metropolitan Borough Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Hornby Boulevard

Sefton Metropolitan Borough Council are proposing to carry out Utility asset works on Hornby Boulevard, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 29 Oct 2024 at 16:50.

ManWeb logo
Between
14 and 23 Jan 2025
Details
View Map
Share
Follow
Parkside

ManWeb are proposing to carry out Utility repair and maintenance works on Parkside, Poulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 24 Oct 2024 at 09:15.

Cadent Gas logo
Between
15 and 29 Jan 2025
Details
View Map
Share
Follow
Greasby Road

Cadent Gas are proposing to carry out Utility asset works on Greasby Road, Greasby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 12:08.

Cadent Gas logo
LONG TERM
Between
17 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Meols Parade

Cadent Gas are proposing to carry out Utility asset works on Meols Parade, Meols.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:43.

Cadent Gas logo
LONG TERM
Between
17 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Meols Parade

Cadent Gas are proposing to carry out Utility asset works on Meols Parade, Meols.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 15:47.

Cadent Gas logo
LONG TERM
Between
17 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Meols Parade

Cadent Gas are proposing to carry out Utility asset works on Meols Parade, Meols.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:13.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Aylesbury Avenue

Cadent Gas are proposing to carry out Utility asset works on Aylesbury Avenue, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 14:44.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Derby Road

Cadent Gas are proposing to carry out Utility asset works on Derby Road, Bootle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 16:25.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Strand Road

Cadent Gas are proposing to carry out Utility asset works on Strand Road, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 18:56.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Strand Road

Cadent Gas are proposing to carry out Utility asset works on Strand Road, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 13:12.

Cadent Gas logo
Between
23 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Shaws Drive

Cadent Gas are proposing to carry out Utility asset works on Shaws Drive, Meols.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:21.

Wirral Borough Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wallasey Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Wallasey Road, Liscard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 13:46.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Merton Road

Cadent Gas are proposing to carry out Utility asset works on Merton Road, Bootle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 19:12.

Cadent Gas logo
Between
27 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Church Gardens

Cadent Gas are proposing to carry out Utility asset works on Church Gardens, Bootle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:52.

Sefton Metropolitan Borough Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Litherland Road

Sefton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Litherland Road, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 13 Nov 2024 at 12:23.

Cadent Gas logo
LONG TERM
Between
27 Jan and 7 May 2025
Details
View Map
Share
Follow
Kirkstone Road North

Cadent Gas are proposing to carry out Utility asset works on Kirkstone Road North, Litherland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 09:40.

Cadent Gas logo
LONG TERM
Between
27 Jan and 7 May 2025
Details
View Map
Share
Follow
Kirkstone Road North

Cadent Gas are proposing to carry out Utility asset works on Kirkstone Road North, Litherland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:10.

Cadent Gas logo
Between
28 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Redstone Close

Cadent Gas are proposing to carry out Utility asset works on Redstone Close, Meols.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:36.

Wirral Borough Council logo
Between
29 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Harrison Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harrison Drive, Wallasey Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 13:50.

Wirral Borough Council logo
Between
1 and 28 Feb 2025
Details
View Map
Share
Follow
Woodchurch Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodchurch Road, Prenton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 26 Nov 2024 at 15:32.

Wirral Borough Council logo
Between
1 and 28 Feb 2025
Details
View Map
Share
Follow
Singleton Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Singleton Avenue, Prenton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 26 Nov 2024 at 16:07.

Wirral Borough Council logo
LONG TERM
Between
1 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Arrowe Brook Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Arrowe Brook Road, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 13:42.

Wirral Borough Council logo
LONG TERM
Between
1 Feb and 31 Mar 2025
Details
View Map
Share
Borough Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Borough Road, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:32.

Wirral Borough Council logo
LONG TERM
Between
1 Feb and 31 Mar 2025
Details
View Map
Share
Borough Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Borough Road, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Aug 2024 at 16:32.

Wirral Borough Council logo
LONG TERM
Between
1 Feb and 31 Mar 2025
Details
View Map
Share
Brook Street

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Brook Street, Birkenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:18.

Wirral Borough Council logo
LONG TERM
Between
1 Feb and 31 Mar 2025
Details
View Map
Share
Birkenhead Road

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Birkenhead Road, Meols.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 24 Sep 2024 at 10:46.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Palm Grove

Cadent Gas are proposing to carry out Utility asset works on Palm Grove, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:13.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Devonshire Road

Cadent Gas are proposing to carry out Utility asset works on Devonshire Road, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:17.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Ethelbert Road

Cadent Gas are proposing to carry out Utility asset works on Ethelbert Road, Meols.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 08:09.

Wirral Borough Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Liscard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 13:54.

Cadent Gas logo
Between
3 and 26 Feb 2025
Details
View Map
Share
Follow
Irlam Road

Cadent Gas are proposing to carry out Utility asset works on Irlam Road, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:00.

Cadent Gas logo
Between
3 and 26 Feb 2025
Details
View Map
Share
Follow
Irlam Road

Cadent Gas are proposing to carry out Utility asset works on Irlam Road, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:54.

Wirral Borough Council logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Noctorum Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Noctorum Avenue, Noctorum.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 13:56.

Cadent Gas logo
Between
5 and 21 Feb 2025
Details
View Map
Share
Follow
Ethelbert Road

Cadent Gas are proposing to carry out Utility asset works on Ethelbert Road, Meols.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 12:13.

Wirral Borough Council logo
Between
7 and 12 Feb 2025
Details
View Map
Share
Follow
Gerald Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Gerald Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 13:59.

ManWeb logo
Between
9 and 12 Feb 2025
Details
View Map
Share
Follow
Queen Anne Street

ManWeb are proposing to carry out Utility repair and maintenance works on Queen Anne Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 26 Nov 2024 at 11:29.

ManWeb logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Queen Anne Street

ManWeb are proposing to carry out Utility repair and maintenance works on Queen Anne Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 25 Oct 2024 at 10:50.

ManWeb logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Queen Anne Street

ManWeb are proposing to carry out Utility repair and maintenance works on Queen Anne Street, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 1 Nov 2024 at 16:23.

Cadent Gas logo
LONG TERM
Between
10 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Wallasey Road

Cadent Gas are proposing to carry out Utility asset works on Wallasey Road, Liscard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:35.

Cadent Gas logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Berry Street

Cadent Gas are proposing to carry out Utility asset works on Berry Street, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:16.

Cadent Gas logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Merton Road

Cadent Gas are proposing to carry out Utility asset works on Merton Road, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:14.

Cadent Gas logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Northfield Road

Cadent Gas are proposing to carry out Utility asset works on Northfield Road, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:14.

Cadent Gas logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Northfield Road

Cadent Gas are proposing to carry out Utility asset works on Northfield Road, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 11:07.

Cadent Gas logo
LONG TERM
Between
10 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Halstead Road

Cadent Gas are proposing to carry out Utility asset works on Halstead Road, Liverpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:15.

Cadent Gas logo
LONG TERM
Between
10 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Moss Lane

Cadent Gas are proposing to carry out Utility asset works on Moss Lane, Liverpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:56.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Moss Lane

Cadent Gas are proposing to carry out Utility asset works on Moss Lane, Bootle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:02.

Wirral Borough Council logo
Between
14 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Woodchurch Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodchurch Road, Oxton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 22 Nov 2024 at 14:48.

Sefton Metropolitan Borough Council logo
Between
16 and 21 Feb 2025
Details
View Map
Share
Follow
Stanley Road

Sefton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Road, Bootle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 20 Sep 2024 at 11:19.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Beresford Road

Cadent Gas are proposing to carry out Utility asset works on Beresford Road, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:39.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Devonshire Place

Cadent Gas are proposing to carry out Utility asset works on Devonshire Place, Oxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:20.

Cadent Gas logo
Between
17 Feb and 13 Mar 2025
Details
View Map
Share
Follow
St James Place

Cadent Gas are proposing to carry out Utility asset works on St James Place, Liverpool.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 11:35.

Cadent Gas logo
LONG TERM
Between
17 Feb and 13 Apr 2025
Details
View Map
Share
Follow
Cliff Road

Cadent Gas are proposing to carry out Utility asset works on Cliff Road, Liscard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:05.

Sefton Metropolitan Borough Council logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Brook Vale

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Brook Vale, Waterloo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 30 May 2024 at 09:19.

Cadent Gas logo
LONG TERM
Between
17 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Moss Lane

Cadent Gas are proposing to carry out Utility asset works on Moss Lane, Litherland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 09:40.

Murphy Power Distribution logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Back South Road

Murphy Power Distribution were proposing to carry out Utility asset works on Back South Road, Waterloo.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 13 Nov 2024 at 08:08.

Murphy Power Distribution logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Back South Road

Murphy Power Distribution are proposing to carry out Utility asset works on Back South Road, Waterloo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 14 Nov 2024 at 18:52.

Cadent Gas logo
LONG TERM
Between
24 Feb and 22 Apr 2025
Details
View Map
Share
Follow
Hoylake Road

Cadent Gas are proposing to carry out Utility asset works on Hoylake Road, Moreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:55.

Cadent Gas logo
LONG TERM
Between
24 Feb and 22 Apr 2025
Details
View Map
Share
Follow
Hoylake Road

Cadent Gas are proposing to carry out Utility asset works on Hoylake Road, Moreton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:39.

Cadent Gas logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Burford Avenue

Cadent Gas are proposing to carry out Utility asset works on Burford Avenue, Liscard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 09:47.

Sefton Metropolitan Borough Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
St Matthews Avenue

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on St Matthews Avenue, Litherland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 30 May 2024 at 06:08.


Roadworks Map near to Mere Lane, WALLASEY, CH45 3HY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 05:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mere Lane, WALLASEY, CH45 3HY (46 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wirral Borough Council logo
MAJOR
  
ST GEORGES ROAD 
(0.1 miles)
Wirral Borough Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 15 Jul 2024 - 31 Mar 2025
0.1
Details
Share
Follow
2
Wirral Borough Council logo
MAJOR
  
ARLINGTON ROAD 
(0.1 miles)
Wirral Borough Council
Highway repair and maintenance works - Carriageway - Road closure
Complete
29 Oct 2024 10:00 - 31 Oct 2024 16:00
0.1
Details
Share
3
Wirral Borough Council logo
MAJOR
  
DEAN AVENUE 
(0.1 miles)
Wirral Borough Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 29 Oct 2024 10:00
(Scheduled: 10 Oct 2024 - 30 Nov 2024)
0.1
Details
Share
Follow
4
Wirral Borough Council logo
MAJOR
  
CHELTENHAM ROAD 
(0.2 miles)
Wirral Borough Council
Highway repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 15 Jul 2024 - 31 Mar 2025)
0.2
Details
Share
5
Wirral Borough Council logo
MAJOR
  
HARRISON DRIVE 
(0.2 miles)
Wirral Borough Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 18 Nov 2024 - 31 Mar 2025
0.2
Details
Share
Follow
6
United Utilities Water (formerly North West Water) logo
URGENT
  
STANLEY AVENUE 
(0.2 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 21 Nov 2024 10:57
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.2
Details
Share
Follow
7
Wirral Borough Council logo
MAJOR
  
GRANVILLE CLOSE 
(0.3 miles)
Wirral Borough Council
Highway repair and maintenance works - Carriageway - Road closure
Complete
30 Oct 2024 10:00 - 31 Oct 2024 17:00
0.3
Details
Share
8
Virgin Media logo
WALLASEY VILLAGE 
(0.4 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Complete
26 Nov 2024 10:48 - 12:33
0.4
Details
Share
9
Cadent Gas logo
EMERGENCY
  
PONSONBY ROAD 
(0.4 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 22 Nov 2024 15:46
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
Follow
10
ManWeb logo
MAJOR
  
TREFORRIS ROAD 
(0.4 miles)
ManWeb
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 21 Nov 2024 16:35
(Scheduled: 21 Nov 2024 - 5 Dec 2024)
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.