ROADWORKS SUMMARY
Hockenhull Avenue, CHESTER, CH3 8LP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hockenhull Avenue, CH3 8LP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hockenhull Avenue, CHESTER, CH3 8LP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hockenhull Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Sandy Lane

Severn Trent Water are carrying out Utility asset works on Sandy Lane, Chester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 March 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 10:02.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Sandy Lane

Severn Trent Water are carrying out Utility asset works on Sandy Lane, Great Boughton, Chester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 March 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 10:23.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dee Banks

Severn Trent Water are carrying out Utility asset works on Dee Banks, Great Boughton, Chester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 March 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 10:20.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Chester Road

Severn Trent Water are carrying out Utility asset works on Chester Road, Huntington, Chester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 March 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 10:21.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dee Banks

Severn Trent Water are carrying out Utility asset works on Dee Banks, Great Boughton, Chester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 10:12.

Cadent Gas logo
LONG TERM
Until
19 Jan 2025
Details
View Map
Share
Follow
St Peters Way

Cadent Gas are carrying out Utility asset works on St Peters Way, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:19 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:42.

Cadent Gas logo
LONG TERM
Between
25 Nov and 31 Dec 2024
Details
View Map
Share
Follow
St Peters Way

Cadent Gas are proposing to carry out Utility asset works on St Peters Way, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 16:00.

Cadent Gas logo
Until
30 Dec 2024
Details
View Map
Share
Follow
Plemstall Close

Cadent Gas are carrying out Utility asset works on Plemstall Close, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 12:09 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:10.

United Utilities Water (formerly North West Water) logo
Finishing
Today
Details
View Map
Share
Follow
Towers Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Towers Lane, Alvanley, Frodsham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 12:56 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Dec 2024 at 14:20.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Follow
Butterbache Road

Severn Trent Water are proposing to carry out Utility asset works on Butterbache Road, Huntington, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 11:30.

Cadent Gas logo
Between
16 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Plemstall Close

Cadent Gas are proposing to carry out Utility asset works on Plemstall Close, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:25.

Severn Trent Water logo
Between
27 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Pickering Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pickering Street, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Sep 2024 at 15:13.

Cadent Gas logo
LONG TERM
Between
2 Jan and 5 Feb 2025
Details
View Map
Share
Follow
St Peters Way

Cadent Gas are proposing to carry out Utility asset works on St Peters Way, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:52.

Cadent Gas logo
Between
2 and 27 Jan 2025
Details
View Map
Share
Follow
Station Lane

Cadent Gas are proposing to carry out Utility asset works on Station Lane, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:51.

Cadent Gas logo
Between
2 and 27 Jan 2025
Details
View Map
Share
Follow
Station Lane

Cadent Gas are proposing to carry out Utility asset works on Station Lane, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:18.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Station View

BT are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Dec 2024 at 09:41.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Station View

BT were proposing to carry out Utility asset works on Station View, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Dec 2024 at 07:18.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Station View

BT are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Sep 2024 at 12:44.

Nexfibre Networks Limited logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Leadworks Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Leadworks Lane, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 16 Oct 2024 at 15:35.

Cheshire West And Chester Council logo
Between
8 and 13 Jan 2025
Details
View Map
Share
Follow
Whitchurch Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Whitchurch Road, Saighton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 4 Oct 2024 at 14:24.

BT logo
Between
9 and 15 Jan 2025
Details
View Map
Share
Follow
Pepper Street

BT are proposing to carry out Utility asset works on Pepper Street, Cheshire West And Chester, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Oct 2024 at 15:31.

Severn Trent Water logo
LONG TERM
Between
13 Jan and 18 Oct 2025
Details
View Map
Share
Follow
Greenfields Lane

Severn Trent Water are proposing to carry out Remedial works on Greenfields Lane, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 15:40.

Cadent Gas logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Follow
Plemstall Close

Cadent Gas are proposing to carry out Utility asset works on Plemstall Close, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:52.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pickering Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pickering Street, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 11:26.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Russell Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Russell Street, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Dec 2024 at 09:03.

Nexfibre Networks Limited logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pearl Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Pearl Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Dec 2024 at 16:09.

Nexfibre Networks Limited logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pearl Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Pearl Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Oct 2024 at 11:28.

Nexfibre Networks Limited logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pearl Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Pearl Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 15:57.

Nexfibre Networks Limited logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pearl Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Pearl Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Dec 2024 at 15:31.

Electricity Network Company logo
LONG TERM
Between
22 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Station View

Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 12:14.

Cadent Gas logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Chester Lane

Cadent Gas are proposing to carry out New service connection on Chester Lane, Saighton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:11.

Cadent Gas logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Chester Lane

Cadent Gas are proposing to carry out New service connection on Chester Lane, Saighton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 12:53.

ManWeb logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Willington Road

ManWeb are proposing to carry out Utility repair and maintenance works on Willington Road, Duddon, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 3 Dec 2024 at 09:50.

ManWeb logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Willington Road

ManWeb are proposing to carry out Utility repair and maintenance works on Willington Road, Duddon, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 3 Dec 2024 at 10:38.

Electricity Network Company logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Hoole Lane

Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 12:14.

Electricity Network Company logo
Between
7 and 25 Feb 2025
Details
View Map
Share
Follow
Station View

Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 10:24.

Electricity Network Company logo
Between
7 and 25 Feb 2025
Details
View Map
Share
Follow
Station View

Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 10:59.

ManWeb logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Well Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Well Lane, Duddon, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Dec 2024 at 13:00.

ManWeb logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Well Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Well Lane, Duddon, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 3 Dec 2024 at 11:27.

ManWeb logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Well Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Well Lane, Duddon, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 3 Dec 2024 at 09:48.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Birch Heath Lane

Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Birch Heath Lane, Christleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Oct 2024 at 15:46.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chester Lane

Cadent Gas are proposing to carry out New service connection on Chester Lane, Saighton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 09:18.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chester Lane

Cadent Gas are proposing to carry out New service connection on Chester Lane, Saighton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:40.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chester Lane

Cadent Gas are proposing to carry out New service connection on Chester Lane, Saighton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:32.

ManWeb logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Cinder Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Cinder Lane, Clotton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 3 Dec 2024 at 09:49.

ManWeb logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Cinder Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Cinder Lane, Clotton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 5 Dec 2024 at 08:45.

ManWeb logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Cinder Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Cinder Lane, Clotton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Dec 2024 at 10:28.

ManWeb logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Cinder Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Cinder Lane, Clotton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Dec 2024 at 13:58.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Birch Heath Lane

Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Birch Heath Lane, Christleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 15 Oct 2024 at 10:50.

Cadent Gas logo
Between
20 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Callender Way

Cadent Gas are proposing to carry out Utility asset works on Callender Way, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:27.

ManWeb logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Willington Road

ManWeb were proposing to carry out Utility repair and maintenance works on Willington Road, Duddon, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 2 Dec 2024 at 08:54.

ManWeb logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Well Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Well Lane, Duddon, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 2 Dec 2024 at 09:12.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Cable Drive

Cadent Gas are proposing to carry out Utility asset works on Cable Drive, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:54.

ManWeb logo
Between
7 and 17 Mar 2025
Details
View Map
Share
Follow
Long Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Long Lane, Waverton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 13 Dec 2024 at 11:43.


Roadworks Map near to Hockenhull Avenue, CHESTER, CH3 8LP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:21
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hockenhull Avenue, CHESTER, CH3 8LP (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.