ROADWORKS SUMMARY
Lea Lane, CHESTER, CH3 6JQ
Introduction
View current and future planned roadworks and road closures for Lea Lane, CH3 6JQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lea Lane, CHESTER, CH3 6JQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lea Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
16 Sep 2024 and 25 Apr 2025
Severn Trent Water were proposing to carry out Utility asset works on High Street, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2024 and run through until 25 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 08:46.
13 Jan and 5 May 2025
Severn Trent Water are proposing to carry out Utility asset works on High Street, Farndon, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 16:14.
13 Jan and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on High Street, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 5 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 19 Aug 2024 at 12:18.
13 Jan and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on High Street, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 5 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 29 Aug 2024 at 08:50.
13 Jan and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on High Street, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 5 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 9 Jan 2025 at 09:21.
13 Jan and 18 Oct 2025
Severn Trent Water are proposing to carry out Remedial works on Greenfields Lane, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 15:40.
10 Feb 2025
Cadent Gas are carrying out Utility repair and maintenance works on Quarry Lane, Christleton, Chester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2025 at 14:00 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 12:51.
22 Jan and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 12:14.
30 Apr 2025
Cheshire West And Chester Council are carrying out Highway improvement works on Quarry Lane, Christleton, Chester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 January 2025 at 16:00 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 24 Jan 2025 at 09:24.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Plough Lane, Christleton, Chester.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 10:46 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 11:03.
3 and 21 Feb 2025
Severn Trent Water were proposing to carry out Utility asset works on River Lane, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 9 Jan 2025 at 09:21.
3 and 19 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 20 Jan 2025 at 11:24.
Wednesday
Severn Trent Water were proposing to carry out New service connection on Castle Street, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 12:37.
3 and 19 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 15 Jan 2025 at 08:59.
3 and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 10 Jan 2025 at 10:48.
3 and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 6 Jan 2025 at 13:59.
3 and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 12:14.
3 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on River Lane, Farndon, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 16:14.
7 and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 3 Feb 2025 at 09:03.
7 and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 10:24.
7 and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 10:59.
7 and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 27 Jan 2025 at 14:44.
7 and 25 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 30 Jan 2025 at 15:56.
10 and 19 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Littleton Lane, Littleton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 24 Jan 2025 at 15:05.
10 and 19 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Littleton Lane, Littleton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 14 Jan 2025 at 16:13.
10 and 14 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Long Lane, Waverton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 9 Jan 2025 at 13:45.
10 and 14 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Long Lane, Waverton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 7 Jan 2025 at 15:54.
10 and 14 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Long Lane, Waverton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 23 Dec 2024 at 09:20.
10 and 14 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Long Lane, Waverton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 23 Dec 2024 at 08:04.
11 and 13 Feb 2025
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Whitchurch Road, Saighton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 15 Jan 2025 at 14:04.
17 and 21 Feb 2025
Cadent Gas are proposing to carry out New service connection on Chester Lane, Saighton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:32.
17 and 21 Feb 2025
Cadent Gas are proposing to carry out New service connection on Chester Lane, Saighton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:40.
17 and 21 Feb 2025
Cadent Gas are proposing to carry out New service connection on Chester Lane, Saighton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 09:18.
17 and 19 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Birch Heath Lane, Christleton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 10 Oct 2024 at 15:46.
17 and 19 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Birch Heath Lane, Christleton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 15 Oct 2024 at 10:50.
19 and 21 Feb 2025
Cheshire West And Chester Council are proposing to carry out Highway repair and maintenance works on Circular Drive, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cheshire West And Chester Council on 29 Jan 2025 at 13:30.
19 and 21 Feb 2025
Cheshire West And Chester Council are proposing to carry out Highway repair and maintenance works on Circular Drive, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cheshire West And Chester Council on 29 Jan 2025 at 14:20.
21 Feb and 4 Apr 2025
Severn Trent Water were proposing to carry out Utility asset works on Churton Road, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 February 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 08:57.
5 and 7 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Greenway Street, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 30 Jan 2025 at 14:02.
5 and 7 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Greenway Street, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 12:54.
7 and 17 Mar 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Long Lane, Waverton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 18 Dec 2024 at 14:27.
7 and 17 Mar 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Long Lane, Waverton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 18 Dec 2024 at 13:19.
10 and 13 Mar 2025
Cheshire West And Chester Council are proposing to carry out Highway repair and maintenance works on Whitchurch Road, Broxton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cheshire West And Chester Council on 3 Feb 2025 at 09:46.
10 and 21 Mar 2025
Cheshire West And Chester Council are proposing to carry out Highway repair and maintenance works on Chapel Lane, Aldford, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 30 Jan 2025 at 13:32.
10 and 21 Mar 2025
Cheshire West And Chester Council are proposing to carry out Highway repair and maintenance works on Chapel Lane, Aldford, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 31 Jan 2025 at 16:23.
24 and 28 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Duke Street, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 27 Dec 2024 at 13:53.
31 Mar and 4 Apr 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Manor Drive, Great Boughton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 26 Nov 2024 at 09:33.
31 Mar and 25 Apr 2025
Severn Trent Water were proposing to carry out Utility asset works on Church Street, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 09:02.
31 Mar and 4 Apr 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Manor Drive, Great Boughton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 29 Nov 2024 at 14:48.
31 Mar and 4 Apr 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Manor Drive, Great Boughton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 27 Nov 2024 at 12:24.
31 Mar and 4 Apr 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Manor Drive, Great Boughton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 25 Nov 2024 at 13:42.
7 Apr and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Churton Road, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 9 Jan 2025 at 09:22.
7 Apr and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Churton Road, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Sep 2024 at 11:14.
7 Apr and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Churton Road, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Aug 2024 at 12:21.
7 Apr and 5 May 2025
Severn Trent Water are proposing to carry out Utility asset works on Churton Road, Farndon, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 16:14.
7 Apr and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Church Street, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 9 Jan 2025 at 09:22.
7 Apr and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Church Street, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Sep 2024 at 11:17.
7 Apr and 5 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Church Street, Farndon, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Aug 2024 at 12:23.
7 Apr and 5 May 2025
Severn Trent Water are proposing to carry out Utility asset works on Church Street, Farndon, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 16:13.
8 and 21 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Littleton Lane, Littleton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 14 Jan 2025 at 15:42.
28 Apr and 3 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Park Road West, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 11:30.
28 and 30 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Littleton Lane, Littleton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 30 Jan 2025 at 14:23.
28 and 30 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Littleton Lane, Littleton, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 30 Jan 2025 at 14:56.
Roadworks Map near to Lea Lane, CHESTER, CH3 6JQ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lea Lane, CHESTER, CH3 6JQ (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.