ROADWORKS SUMMARY
Ermine Road, CHESTER, CH2 3PP
Introduction

View current and future planned roadworks and road closures for Ermine Road, CH2 3PP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Ermine Road, CHESTER, CH2 3PP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ermine Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
13 Jan and 18 Oct 2025
Severn Trent Water are proposing to carry out Remedial works on Greenfields Lane, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 15:40.
16 Jun and 12 Oct 2025
Severn Trent Water were proposing to carry out roadworks on Lampits Lane, Barrow, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 May 2025 at 14:40.
16 Jun and 12 Oct 2025
Severn Trent Water were proposing to carry out roadworks on Main Street, Barrow, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 May 2025 at 14:39.
16 Jun and 12 Oct 2025
Severn Trent Water were proposing to carry out Utility asset works on Barrow Lane, Barrow, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 12 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 10:39.
16 Jun and 12 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Barrow Lane, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 13:07.
12 Oct 2025
Severn Trent Water are carrying out Utility asset works on Barrow Lane, Barrow, Chester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2025 at 14:35 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 17 Jun 2025 at 14:40.
12 Oct 2025
Severn Trent Water are carrying out Utility asset works on Station Lane, Barrow, Chester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2025 at 14:35 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 22 Aug 2025 at 11:48.
16 Jun and 12 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Station Lane, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 13:10.
Monday
Cadent Gas were proposing to carry out Utility asset works on Tarvin Road, Littleton, Chester.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jun 2025 at 08:45.
Friday
Cadent Gas are carrying out Utility asset works on Percy Road, Chester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 August 2025 at 08:54 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 15:10.
30 Sep 2025
Cheshire West And Chester Council are carrying out Remedial works on Eaton Road, Eccleston, Chester.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 August 2025 at 15:00 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 26 Aug 2025 at 08:38.
Friday
Severn Trent Water are carrying out Utility asset works on Plemstall Way, Mickle Trafford, Chester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 10:30 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Aug 2025 at 12:56.
Friday
Severn Trent Water are carrying out Utility asset works on Hollowmoor Heath, Barrow, Chester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 13:00 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 13:14.
Monday
Welsh Water are carrying out Utility asset works on Norley Drive, Great Boughton, Chester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2025 at 09:20 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 29 Aug 2025 at 10:47.
26 Aug and 12 Sep 2025
Severn Trent Water are proposing to carry out Utility asset works on Hollowmoor Heath, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 3 Jun 2025 at 13:25.
1 Sep and 3 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Heath Lane, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 3 Jun 2025 at 13:26.
15 Sep 2025
Welsh Water are carrying out Utility asset works on Clarence Avenue, Great Boughton, Chester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 15:15 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 1 Sep 2025 at 16:02.
1 Sep and 3 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Heath Lane, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 17 Jun 2025 at 12:11.
8 and 12 Sep 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 15:04.
15 Sep and 17 Oct 2025
Severn Trent Water were proposing to carry out Utility asset works on Warrington Road, Mickle Trafford, Chester.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 17 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 13 Aug 2025 at 13:06.
15 and 19 Sep 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Well Lane, Mollington, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 4 Jun 2025 at 12:48.
15 and 19 Sep 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Well Lane, Mollington, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 16 May 2025 at 10:38.
15 and 19 Sep 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Well Lane, Mollington, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 15 May 2025 at 15:28.
15 and 19 Sep 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Well Lane, Mollington, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 15 May 2025 at 10:45.
15 Sep and 17 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Warrington Road, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 23 Jun 2025 at 16:17.
15 Sep and 10 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Moston Road, Moston, Chester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 15 May 2025 at 11:26.
21 Sep and 31 Oct 2025
Cheshire West And Chester Council are proposing to carry out Highway repair and maintenance works on St Martins Way, Chester.
These works are categorised as Major.
The works will start on or after 21 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cheshire West And Chester Council on 19 Aug 2025 at 11:49.
21 Sep and 31 Oct 2025
Cheshire West And Chester Council are proposing to carry out Highway repair and maintenance works on St Martins Way, Chester.
These works are categorised as Major.
The works will start on or after 21 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cheshire West And Chester Council on 26 Jun 2025 at 14:50.
22 and 26 Sep 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kingsway, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 2 May 2025 at 12:51.
22 and 26 Sep 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Norton Road, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Apr 2025 at 10:04.
29 Sep and 1 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hollowmoor Heath, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 23 Jun 2025 at 11:28.
29 Sep and 1 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hollowmoor Heath, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 12 Aug 2025 at 10:42.
29 Sep and 12 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Hollowmoor Heath, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 21 Jul 2025 at 12:39.
29 Sep and 12 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Hollowmoor Heath, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 30 Jun 2025 at 16:17.
6 and 8 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Low Hill, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Jul 2025 at 09:52.
13 Oct and 19 Dec 2025
Severn Trent Water are proposing to carry out Utility asset works on Village Road, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 2 Jul 2025 at 13:22.
13 Oct and 19 Dec 2025
Severn Trent Water are proposing to carry out Utility asset works on Village Road, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Jul 2025 at 12:26.
13 Oct and 14 Nov 2025
Severn Trent Water are proposing to carry out Utility asset works on Barrow Lane, Tarvin, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 3 Jul 2025 at 11:47.
13 Oct and 14 Nov 2025
Severn Trent Water are proposing to carry out Utility asset works on Heath Lane, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 5 Aug 2025 at 10:45.
13 Oct and 14 Nov 2025
Severn Trent Water are proposing to carry out Utility asset works on Heath Lane, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 3 Jul 2025 at 11:47.
13 Oct and 19 Dec 2025
Severn Trent Water are proposing to carry out Utility asset works on Main Street, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Jul 2025 at 12:43.
13 Oct and 19 Dec 2025
Severn Trent Water are proposing to carry out Utility asset works on Main Street, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 2 Jul 2025 at 13:30.
13 and 17 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Elmwood Avenue, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 23 Jul 2025 at 13:17.
13 and 17 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Elmwood Avenue, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 22 Jul 2025 at 08:38.
13 and 17 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Elmwood Avenue, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 21 Jul 2025 at 14:38.
13 Oct and 14 Nov 2025
Severn Trent Water are proposing to carry out Utility asset works on Barrow Lane, Tarvin, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 5 Aug 2025 at 12:41.
20 Oct and 21 Nov 2025
Severn Trent Water are proposing to carry out Utility asset works on Warrington Road, Mickle Trafford, Chester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 09:10.
20 and 24 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Gordon Lane, Backford, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 19 Aug 2025 at 15:45.
20 and 24 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Gordon Lane, Backford, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 9 Jul 2025 at 10:59.
20 and 24 Oct 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Gordon Lane, Backford, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 9 Jul 2025 at 08:45.
20 and 22 Oct 2025
Welsh Water were proposing to carry out Utility asset works on Norley Drive, Great Boughton, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Welsh Water on 24 Jul 2025 at 09:31.
25 Oct and 2 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Overleigh Road, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 15:41.
25 Oct and 2 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Overleigh Road, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 10:51.
25 Oct and 2 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Overleigh Road, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jul 2025 at 09:27.
25 Oct and 2 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Overleigh Road, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 14:42.
25 Oct and 2 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Overleigh Road, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 11:40.
3 and 7 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 10:28.
3 and 18 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Footpath Ludlow Drive To Thornton Road, Ellesmere Port.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 18 November 2025. The works were due to impact the footway, verge and footpath.
This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 15:00.
10 Nov and 19 Dec 2025
Severn Trent Water are proposing to carry out Utility asset works on St Peters Way, Mickle Trafford, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 12:27.
10 and 21 Nov 2025
Severn Trent Water are proposing to carry out Utility asset works on Church Rds, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 8 Jul 2025 at 13:33.
10 and 21 Nov 2025
Severn Trent Water are proposing to carry out Utility asset works on Church Rds, Barrow, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Aug 2025 at 12:51.
13 Nov and 10 Dec 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Moston Road, Moston, Chester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 21 Aug 2025 at 15:13.
13 Nov and 10 Dec 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Moston Road, Moston, Chester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 22 Aug 2025 at 09:15.
17 and 21 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Aug 2025 at 13:42.
17 and 21 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Aug 2025 at 14:04.
17 and 21 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 3 Jun 2025 at 15:53.
Roadworks Map near to Ermine Road, CHESTER, CH2 3PP (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Ermine Road, CHESTER, CH2 3PP (20 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Sep 2025 - 10 Sep 2025)
(Scheduled: 18 Jul 2025 - 30 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.