ROADWORKS SUMMARY
HAVERHILL, CB9 1AE
Introduction
View current and future planned roadworks and road closures for CB9 1AE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to HAVERHILL, CB9 1AE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Jan and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 14:56.
6 Jan and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 11 Nov 2024 at 11:49.
6 Jan and 7 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:24.
6 Jan and 7 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 08:58.
9 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 16:17.
9 Jan and 23 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:25.
9 Jan and 10 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:19.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Sturmer Road, Haverhill.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 16:28 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 08:38.
28 Feb 2025
Anglian Water are carrying out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 12:01 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Jan 2025 at 12:01.
14 Feb 2025
Anglian Water are carrying out Utility repair and maintenance works on The Endway, Steeple Bumpstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 12:01 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Jan 2025 at 12:02.
Tuesday
Anglian Water are carrying out Utility repair and maintenance works on Mill Hill, Haverhill.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2025 at 10:00 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 15 Jan 2025 at 15:16.
Thursday
Anglian Water are carrying out Utility repair and maintenance works on Skippers Lane, Withersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2025 at 08:40 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Jan 2025 at 13:38.
Friday
Essex County Council are proposing to carry out Highway improvement works on Kedington Road, Sturmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 15:40.
Friday
Essex County Council are proposing to carry out Highway improvement works on Kedington Road, Sturmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 08:57.
27 and 29 Jan 2025
Essex County Council were proposing to carry out Highway improvement works on Finkle Green, Birdbrook.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Essex County Council on 19 Dec 2024 at 08:18.
27 Jan and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 14:52.
27 Jan and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 08:56.
27 Jan and 17 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Water Lane, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 16:33.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Finkle Green, Birdbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Sep 2024 at 11:22.
27 Jan and 21 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 16:16.
27 Jan and 21 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Nov 2024 at 09:22.
30 Jan and 23 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:29.
30 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:35.
30 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:31.
30 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:33.
30 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:35.
3 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Jan 2025 at 09:35.
3 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 Dec 2024 at 14:24.
3 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Jan 2025 at 09:36.
3 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 Dec 2024 at 14:19.
7 Feb and 8 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on North Avenue, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 February 2025 and run through until 8 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:21.
7 Feb and 9 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Eastern Avenue, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 14:43.
10 Feb and 10 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Withersfield Road, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 13:26.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ash Grove, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 13:26.
10 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Eastern Avenue, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 11:17.
10 Feb and 9 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Eastern Avenue, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 16:39.
10 and 24 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Queensway, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:22.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ash Grove, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:09.
14 Feb and 30 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Crowland Road, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 February 2025 and run through until 30 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:22.
17 and 19 Feb 2025
Suffolk County Council are proposing to carry out Highway improvement works on Dane Common, Kedington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 1 Oct 2024 at 15:53.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beech Grove, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:10.
17 Feb and 11 Apr 2025
Suffolk County Council are proposing to carry out Highway improvement works on Beech Grove, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 17 Jan 2025 at 10:06.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beech Grove, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 14:17.
17 and 21 Feb 2025
Suffolk County Council are proposing to carry out Highway improvement works on Millfields Way, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 29 Oct 2024 at 12:19.
17 and 21 Feb 2025
Essex County Council are proposing to carry out Remedial works on Ashen Lane, Ashen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 12:38.
21 Feb and 7 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Allington Walk, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:23.
21 Feb and 6 May 2025
Cadent Gas were proposing to carry out Utility asset works on Eastern Avenue, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:24.
24 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chestnut Close, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 13:25.
24 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chestnut Close, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:11.
24 Feb and 28 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Bumpstead Road, Sturmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 11 Nov 2024 at 12:03.
24 Feb and 28 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Bumpstead Road, Sturmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:17.
24 Feb and 28 Mar 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 10:15.
28 Feb and 1 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 1 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 14:15.
28 Feb and 1 Apr 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 16:42.
28 Feb and 1 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 1 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 16:23.
3 and 17 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Castle Lane, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:25.
3 Mar and 14 Apr 2025
Suffolk County Council are proposing to carry out Works for road purposes on Withersfield Road, Great Thurlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 9 Jan 2025 at 09:58.
3 and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Allington Walk, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 14:18.
3 and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Allington Walk, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:11.
10 and 14 Mar 2025
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Valley Wash, Hundon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 09:19.
10 and 15 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Valley Wash, Hundon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 10:18.
10 and 15 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Valley Wash, Hundon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:47.
10 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Queensway, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 14:18.
10 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Queensway, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:12.
14 and 18 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Girton Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 11:39.
14 Mar and 4 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Downs Crescent, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:25.
17 Mar and 14 Apr 2025
Suffolk County Council are proposing to carry out Works for road purposes on Withersfield Road, Great Thurlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 10 Jan 2025 at 10:35.
17 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Close, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 17:27.
17 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Broadcroft Crescent, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 17:28.
20 and 26 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Crowland Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 18 Dec 2024 at 08:39.
31 Mar and 21 May 2025
Cadent Gas are proposing to carry out Utility asset works on Crowland Road, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 12:07.
31 Mar and 21 May 2025
Cadent Gas are proposing to carry out Utility asset works on Crowland Road, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 17:24.
1 and 8 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Steeple Bumpstead Road, Helions Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Jan 2025 at 17:05.
7 and 22 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Crowland Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 14 Jan 2025 at 15:22.
7 and 15 Apr 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Haverhill Road, Kedington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 8 Oct 2024 at 09:28.
7 and 11 Apr 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Haverhill Road, Kedington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 11 Oct 2024 at 09:08.
7 and 11 Apr 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Haverhill Road, Kedington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 29 Oct 2024 at 08:50.
7 and 14 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Drapers Green, Helions Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 16:29.
14 and 16 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Girton Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 13 Jan 2025 at 16:25.
14 and 16 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Girton Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 14:02.
16 and 24 Apr 2025
BT are proposing to carry out Utility asset works on Haverhill Road, Horseheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 6 Jan 2025 at 14:45.
Roadworks Map near to HAVERHILL, CB9 1AE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to HAVERHILL, CB9 1AE (27 Events)
(Scheduled Dates)
(miles)
(Scheduled: 15 Jan 2025 - 21 Jan 2025)
(Scheduled: 13 Jan 2025 - 28 Jan 2025)
(Scheduled: 13 Jan 2025 - 28 Jan 2025)
(Scheduled: 17 Jan 2025 - 21 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.