View current and future planned roadworks and road closures for Kitten Close, CB9 0PU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Kitten Close, HAVERHILL, CB9 0PU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kitten Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
21 Feb and 6 May 2025
Details
View Map
Share
Eastern Avenue

Cadent Gas were proposing to carry out Utility asset works on Eastern Avenue, Haverhill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:24.

Cadent Gas logo
LONG TERM
Between
31 Mar and 21 May 2025
Details
View Map
Share
Follow
Crowland Road

Cadent Gas are proposing to carry out Utility asset works on Crowland Road, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 17:24.

Cadent Gas logo
LONG TERM
Between
31 Mar and 21 May 2025
Details
View Map
Share
Follow
Crowland Road

Cadent Gas are proposing to carry out Utility asset works on Crowland Road, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 12:07.

Cadent Gas logo
LONG TERM
Until
21 May 2025
Details
View Map
Share
Follow
Crowland Road

Cadent Gas are carrying out Utility asset works on Crowland Road, Haverhill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 08:55 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 08:57.

Cadent Gas logo
LONG TERM
Until
5 Jun 2025
Details
View Map
Share
Follow
Castle Lane

Cadent Gas are carrying out Utility asset works on Castle Lane, Haverhill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:53 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 08:59.

Suffolk County Council logo
LONG TERM
Between
7 Apr and 19 May 2025
Details
View Map
Share
Follow
Hales Barn Road

Suffolk County Council are proposing to carry out Works for road purposes on Hales Barn Road, Haverhill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 24 Mar 2025 at 12:44.

Suffolk County Council logo
LONG TERM
Until
19 May 2025
Details
View Map
Share
Follow
Hales Barn Road

Suffolk County Council are carrying out Works for road purposes on Hales Barn Road, Haverhill.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:00 and could run through until 19 May 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 8 Apr 2025 at 11:10.

Cadent Gas logo
LONG TERM
Until
28 May 2025
Details
View Map
Share
Follow
Downs Crescent

Cadent Gas are carrying out Utility asset works on Downs Crescent, Haverhill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 08:12 and could run through until 28 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 08:21.

Suffolk County Council logo
LONG TERM
Between
7 Apr and 19 May 2025
Details
View Map
Share
Follow
Hales Barn Road

Suffolk County Council are proposing to carry out Works for road purposes on Hales Barn Road, Haverhill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 6 Mar 2025 at 10:59.

Nexfibre Networks Limited logo
Finishing
Tuesday
Details
View Map
Share
Follow
Crowland Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Crowland Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Jan 2025 at 15:22.

Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Haverhill Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Haverhill Road, Little Wratting.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the verge only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Feb 2025 at 13:05.

Between
15 and 25 Apr 2025
Details
View Map
Share
Haverhill Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Haverhill Road, Little Wratting.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 25 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Apr 2025 at 13:52.

BT logo
Between
16 and 24 Apr 2025
Details
View Map
Share
Haverhill Road

BT were proposing to carry out Utility asset works on Haverhill Road, Horseheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 April 2025 and run through until 24 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 09:56.

Anglian Water logo
LONG TERM
Between
22 Apr and 17 Oct 2025
Details
View Map
Share
Follow
Sturmer Road

Anglian Water are proposing to carry out Utility asset works on Sturmer Road, New England.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Apr 2025 at 10:10.

Anglian Water logo
LONG TERM
Between
22 Apr and 17 Oct 2025
Details
View Map
Share
Sturmer Road

Anglian Water were proposing to carry out Utility asset works on Sturmer Road, New England.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 17 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Apr 2025 at 10:01.

Anglian Water logo
LONG TERM
Between
22 Apr and 17 Oct 2025
Details
View Map
Share
Follow
Sturmer Road

Anglian Water are proposing to carry out Utility asset works on Sturmer Road, New England.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 24 Mar 2025 at 16:13.

Essex County Council logo
Between
23 Apr and 21 May 2025
Details
View Map
Share
Follow
Water Lane

Essex County Council are proposing to carry out Highway improvement works on Water Lane, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Mar 2025 at 14:41.

Suffolk County Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Mill Road

Suffolk County Council were proposing to carry out Highway repair and maintenance works on Mill Road, Birdbrook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 9 Apr 2025 at 14:46.

Suffolk County Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Mill Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Mill Road, Birdbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 9 Apr 2025 at 08:11.

Essex County Council logo
Between
23 Apr and 21 May 2025
Details
View Map
Share
Follow
Water Lane

Essex County Council are proposing to carry out Highway improvement works on Water Lane, Steeple Bumpstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 31 Mar 2025 at 08:59.

Suffolk County Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Baythorne End

Suffolk County Council were proposing to carry out Highway improvement works on Baythorne End, Stoke By Clare.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 9 Apr 2025 at 14:46.

Anglian Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Hamlet Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Hamlet Road, Haverhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Jan 2025 at 09:02.

Cadent Gas logo
LONG TERM
Between
28 Apr and 11 Jun 2025
Details
View Map
Share
Follow
Downs Crescent

Cadent Gas are proposing to carry out Utility asset works on Downs Crescent, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 12:08.

Nexfibre Networks Limited logo
Between
1 and 9 May 2025
Details
View Map
Share
Follow
Mill Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Mill Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 27 Jan 2025 at 16:15.

Nexfibre Networks Limited logo
Between
1 and 9 May 2025
Details
View Map
Share
Follow
Chauntry Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Chauntry Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Jan 2025 at 12:24.

Nexfibre Networks Limited logo
Between
1 and 9 May 2025
Details
View Map
Share
Follow
Burton End

Nexfibre Networks Limited are proposing to carry out Utility asset works on Burton End, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Feb 2025 at 11:12.

Nexfibre Networks Limited logo
Between
1 and 9 May 2025
Details
View Map
Share
Follow
Mill Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Mill Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 30 Jan 2025 at 15:40.

Cadent Gas logo
Between
2 and 14 May 2025
Details
View Map
Share
Follow
St Botolphs Way

Cadent Gas are proposing to carry out Utility asset works on St Botolphs Way, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 08:03.

Cadent Gas logo
LONG TERM
Between
6 May and 11 Jun 2025
Details
View Map
Share
Wratting Road

Cadent Gas were proposing to carry out Utility asset works on Wratting Road, Haverhill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 11:04.

Nexfibre Networks Limited logo
Between
8 May and 5 Jun 2025
Details
View Map
Share
Follow
Haverhill Road (A1307)

Nexfibre Networks Limited are proposing to carry out Utility asset works on Haverhill Road (A1307), Horseheath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 5 June 2025. The works will impact the verge only.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Feb 2025 at 08:59.

Nexfibre Networks Limited logo
Between
8 May and 5 Jun 2025
Details
View Map
Share
Follow
Cambridge Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Cambridge Road, Withersfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 5 June 2025. The works will impact the verge only.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Feb 2025 at 17:14.

Nexfibre Networks Limited logo
Between
10 and 18 May 2025
Details
View Map
Share
Follow
Burton End

Nexfibre Networks Limited are proposing to carry out Utility asset works on Burton End, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 18 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Feb 2025 at 13:53.

Nexfibre Networks Limited logo
Between
10 and 18 May 2025
Details
View Map
Share
Follow
Burton End

Nexfibre Networks Limited are proposing to carry out Utility asset works on Burton End, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 18 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Feb 2025 at 09:27.

Nexfibre Networks Limited logo
Between
10 and 18 May 2025
Details
View Map
Share
Follow
Burton End

Nexfibre Networks Limited are proposing to carry out Utility asset works on Burton End, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Feb 2025 at 11:42.

Anglian Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Broad Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Broad Road, Little Thurlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Feb 2025 at 14:14.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Cardinals Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cardinals Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2025 at 14:51.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Mill Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2025 at 14:49.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Mill Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Shudy Camps.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2025 at 14:49.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Horseheath Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Horseheath Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2025 at 14:50.

Cambridgeshire County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Cardinals Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cardinals Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 4 Mar 2025 at 16:21.

Cambridgeshire County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Mill Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 4 Mar 2025 at 16:24.

Cambridgeshire County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Mill Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Shudy Camps.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 4 Mar 2025 at 16:24.

Cambridgeshire County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Horseheath Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Horseheath Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 4 Mar 2025 at 16:24.

Essex County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Water Lane

Essex County Council are proposing to carry out Highway improvement works on Water Lane, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Jan 2025 at 15:51.

Essex County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Water Lane

Essex County Council are proposing to carry out Highway improvement works on Water Lane, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 14:11.

Essex County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Water Lane

Essex County Council are proposing to carry out Highway improvement works on Water Lane, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Mar 2025 at 10:15.

Essex County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Kedington Road

Essex County Council are proposing to carry out Highway improvement works on Kedington Road, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Jan 2025 at 15:47.

Essex County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Kedington Road

Essex County Council are proposing to carry out Highway improvement works on Kedington Road, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Jan 2025 at 17:57.

Essex County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Kedington Road

Essex County Council are proposing to carry out Highway improvement works on Kedington Road, Sturmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Mar 2025 at 10:18.

Cadent Gas logo
Between
22 May and 17 Jun 2025
Details
View Map
Share
Follow
Broadcroft Crescent

Cadent Gas are proposing to carry out Utility asset works on Broadcroft Crescent, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 13:09.

Nexfibre Networks Limited logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Withersfield Road

Nexfibre Networks Limited were proposing to carry out Utility asset works on Withersfield Road, Haverhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 8 Apr 2025 at 15:10.

Nexfibre Networks Limited logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Withersfield Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Withersfield Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 20 Mar 2025 at 08:48.

Cadent Gas logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Crowland Road

Cadent Gas are proposing to carry out Utility asset works on Crowland Road, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 12:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Haverhill Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Haverhill Road, Barnardiston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 31 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Feb 2025 at 12:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Haverhill Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Haverhill Road, Stradishall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 31 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Feb 2025 at 09:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Jun and 4 Aug 2025
Details
View Map
Share
Haverhill Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Haverhill Road, Barnardiston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 4 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Feb 2025 at 14:24.

Cadent Gas logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
St Botolphs Way

Cadent Gas are proposing to carry out Utility asset works on St Botolphs Way, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 12:41.

BT logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Follow
Haverhill Road (A1307)

BT are proposing to carry out Utility asset works on Haverhill Road (A1307), Horseheath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 3 Mar 2025 at 09:58.

LONG TERM
Between
16 Jun and 8 Sep 2025
Details
View Map
Share
Follow
Haverhill Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Remedial works on Haverhill Road, Little Wratting.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Feb 2025 at 13:31.

LONG TERM
Between
16 Jun and 8 Sep 2025
Details
View Map
Share
Follow
Haverhill Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Remedial works on Haverhill Road, Little Wratting.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Feb 2025 at 13:07.

Nexfibre Networks Limited logo
Between
27 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Withersfield Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Withersfield Road, Haverhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Mar 2025 at 09:36.

Suffolk County Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Chapel Street

Suffolk County Council are proposing to carry out Highway improvement works on Chapel Street, Stoke By Clare.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 15 Apr 2025 at 14:08.

Essex County Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Tilbury Road

Essex County Council are proposing to carry out Highway improvement works on Tilbury Road, Ridgewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Apr 2025 at 15:28.

Suffolk County Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Mill Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Mill Road, Birdbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Apr 2025 at 09:08.

Suffolk County Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Baythorne End

Suffolk County Council are proposing to carry out Highway improvement works on Baythorne End, Stoke By Clare.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 15 Apr 2025 at 08:09.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Castle Lane

Cadent Gas are proposing to carry out Utility asset works on Castle Lane, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 12:42.

Essex County Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Tilbury Green

Essex County Council are proposing to carry out Highway improvement works on Tilbury Green, Ridgewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Apr 2025 at 15:26.

BT logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Haverhill Road

BT are proposing to carry out Utility asset works on Haverhill Road, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 3 Mar 2025 at 09:56.

Suffolk County Council logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Howe Road

Suffolk County Council are proposing to carry out Section 50 on Howe Road, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 15 Apr 2025 at 09:07.

Suffolk County Council logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Howe Road

Suffolk County Council are proposing to carry out Section 50 on Howe Road, Haverhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 15 Apr 2025 at 09:56.


Roadworks Map near to Kitten Close, HAVERHILL, CB9 0PU (26 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Last Updated: 17 Apr 2025 12:40
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Kitten Close, HAVERHILL, CB9 0PU (26 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Gigaclear logo
BAILEY CLOSE 
(0.1 miles)
Gigaclear
Remedial works - Footway - Give and take
Cancelled
(Scheduled: 16 Apr 2025 - 17 Apr 2025)
0.1
Details
Share
2
Nexfibre Networks Limited logo
ROCKALL CLOSE 
(0.2 miles)
Nexfibre Networks Limited
Remedial works - Footway, Carriageway -
In Progress
Since: 16 Apr 2025 16:05
(Scheduled: 15 Apr 2025 - 22 Apr 2025)
0.2
Details
Share
Follow
3
Nexfibre Networks Limited logo
SHETLAND ROAD 
(0.2 miles)
Nexfibre Networks Limited
Utility asset works - Footway - No carriageway incursion
Complete
16 Apr 2025 11:35 - 17 Apr 2025 12:15
0.2
Details
Share
4
Anglian Water logo
CHALKSTONE WAY 
(0.3 miles)
Anglian Water
Utility repair and maintenance works - Footway - Multi-way signals
In Progress
Since: 15 Apr 2025 08:59
(Scheduled: 15 Apr 2025 - 17 Apr 2025)
0.3
Details
Share
Follow
5
Nexfibre Networks Limited logo
ROSS CLOSE 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 16 Apr 2025 16:50
(Scheduled: 16 Apr 2025 - 22 Apr 2025)
0.3
Details
Share
Follow
6
Anglian Water logo
PIPERS CLOSE 
(0.4 miles)
Anglian Water
Optional permit (no fee) e.g. for traffic management etc - Footway - Some carriageway incursion
In Progress
Since: 15 Apr 2025 09:59
(Scheduled: 15 Apr 2025 - 17 Apr 2025)
0.4
Details
Share
Follow
7
Anglian Water logo
URGENT
  
HUNDON PLACE 
(0.5 miles)
Anglian Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 8 Apr 2025 18:12
(Scheduled: 8 Apr 2025 - 23 Apr 2025)
0.5
Details
Share
Follow
8
Nexfibre Networks Limited logo
HUNDON PLACE 
(0.5 miles)
Nexfibre Networks Limited
Remedial works - Footway, Verge - No carriageway incursion
In Progress
Since: 16 Apr 2025 16:10
(Scheduled: 15 Apr 2025 - 22 Apr 2025)
0.5
Details
Share
Follow
9
Nexfibre Networks Limited logo
INGHAM ROAD 
(0.5 miles)
Nexfibre Networks Limited
Remedial works - Footway, Verge - No carriageway incursion
In Progress
Since: 16 Apr 2025 16:10
(Scheduled: 15 Apr 2025 - 22 Apr 2025)
0.5
Details
Share
Follow
10
BT logo
ELMHURST CLOSE 
(0.5 miles)
BT
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 16 Apr 2025 - 22 Apr 2025
0.5
Details
Share
Follow
  • ...