ROADWORKS SUMMARY
Rockall, NEWMARKET, CB8 8TP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Rockall, CB8 8TP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Rockall, NEWMARKET, CB8 8TP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Rockall are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
19 May 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are carrying out Utility asset works on Gazeley Road, Kentford.

These works are categorised as Major.

The works started on 21 November 2023 at 11:00 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2023 at 11:12.

Anglian Water logo
LONG TERM
Until
5 Aug 2025
Details
View Map
Share
Follow
Kiln Lane

Anglian Water are carrying out Utility asset works on Kiln Lane, Rede.

These works are categorised as Major.

The works started on 6 February 2024 at 10:00 and could run through until 5 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 6 Feb 2024 at 11:32.

Anglian Water logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Rede Road

Anglian Water are carrying out Utility asset works on Rede Road, Whepstead.

These works are categorised as Major.

The works started on 16 February 2024 at 16:00 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:04.

Cambridgeshire County Council logo
LONG TERM
Between
20 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Little Green

Cambridgeshire County Council are proposing to carry out Section 50 on Little Green, Cheveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 7 Jan 2025 at 10:03.

Cambridgeshire County Council logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Little Green

Cambridgeshire County Council are carrying out Section 50 on Little Green, Cheveley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:33 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 20 Jan 2025 at 14:45.

Cityfibre Metro Networks logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Rede Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Rede Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 13:03.

Suffolk County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Coalpit Lane

Suffolk County Council are proposing to carry out Highway improvement works on Coalpit Lane, Forest Heath, Higham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 15 Jan 2025 at 16:05.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gazeley Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 3 Feb 2025 at 11:19.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gazeley Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 14:41.

Suffolk County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Colethorpe Lane

Suffolk County Council are proposing to carry out Highway improvement works on Colethorpe Lane, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 15 Jan 2025 at 16:05.

Anglian Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Kiln Lane

Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 08:00.

Suffolk County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Colethorpe Lane

Suffolk County Council are proposing to carry out Highway improvement works on Colethorpe Lane, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 14 Jan 2025 at 16:55.

Anglian Water logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Kiln Lane

Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 08:41.

Anglian Water logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Kiln Lane

Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:59.

Cityfibre Metro Networks logo
Between
3 and 30 Mar 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 13:59.

Anglian Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Twites Corner

Anglian Water are proposing to carry out Utility repair and maintenance works on Twites Corner, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 13:06.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 12:49.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:47.

Cityfibre Metro Networks logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Assington Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Assington Green, Stansfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 12:51.

Cityfibre Metro Networks logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Assington Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Assington Green, Stansfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:24.

Suffolk County Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Attleton Green

Suffolk County Council are proposing to carry out Highway improvement works on Attleton Green, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Jan 2025 at 14:16.

Suffolk County Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Attleton Green

Suffolk County Council are proposing to carry out Highway improvement works on Attleton Green, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 16:07.

Suffolk County Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
New England Lane

Suffolk County Council are proposing to carry out Highway improvement works on New England Lane, Cowlinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 16:08.

Suffolk County Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
New England Lane

Suffolk County Council are proposing to carry out Highway improvement works on New England Lane, Cowlinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Jan 2025 at 14:16.

Cityfibre Metro Networks logo
Between
20 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Lower Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Lower Green, Denston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 3 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:26.

Cityfibre Metro Networks logo
Between
20 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wickham Street Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Wickham Street Road, Denston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 3 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 13:01.

Cityfibre Metro Networks logo
Between
20 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wickham Street Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Wickham Street Road, Denston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 3 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:27.

Cityfibre Metro Networks logo
Between
20 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Lower Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Lower Green, Denston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 3 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 13:01.

Cityfibre Metro Networks logo
Between
24 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Meeting Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Meeting Green, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 08:58.

Cityfibre Metro Networks logo
Between
24 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Meeting Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Meeting Green, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:45.

Cityfibre Metro Networks logo
Between
24 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Nunnery Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Nunnery Green, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Jan 2025 at 15:49.

Cityfibre Metro Networks logo
Between
24 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Nunnery Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Nunnery Green, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 08:59.

Cityfibre Metro Networks logo
Between
24 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Cemetery Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cemetery Road, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:45.

Cityfibre Metro Networks logo
Between
24 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Cemetery Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cemetery Road, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 08:58.

Cityfibre Metro Networks logo
LONG TERM
Between
31 Mar and 7 May 2025
Details
View Map
Share
Follow
Rede Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Rede Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 7 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.

Anglian Water logo
Between
31 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Needham Street

Anglian Water are proposing to carry out Section 58 on Needham Street, Gazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 24 Jan 2025 at 09:30.

Cityfibre Metro Networks logo
Between
4 and 17 Apr 2025
Details
View Map
Share
Follow
Top Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Top Green, Denston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:28.

Cityfibre Metro Networks logo
Between
4 and 17 Apr 2025
Details
View Map
Share
Follow
Top Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Top Green, Denston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 13:01.

Cityfibre Metro Networks logo
Between
4 and 17 Apr 2025
Details
View Map
Share
Follow
Water Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Water Lane, Denston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:29.

Cityfibre Metro Networks logo
Between
4 and 17 Apr 2025
Details
View Map
Share
Follow
Water Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Water Lane, Denston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 12:52.

Anglian Water logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Mill Road

Anglian Water are proposing to carry out Section 58 on Mill Road, Gazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 24 Jan 2025 at 15:32.

Anglian Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Front Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Front Street, Ousden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 24 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Jan 2025 at 10:13.

Cityfibre Metro Networks logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
The Duddery

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Duddery, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 09:00.

Cityfibre Metro Networks logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
The Duddery

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Duddery, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:44.

Cityfibre Metro Networks logo
Between
29 Apr and 28 May 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Stradishall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 28 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 09:10.

Cityfibre Metro Networks logo
Between
29 Apr and 28 May 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Stradishall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 28 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 08:52.

Cityfibre Metro Networks logo
Between
29 Apr and 28 May 2025
Details
View Map
Share
Follow
Edmunds Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Edmunds Hill, Stradishall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 28 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 09:05.

Cityfibre Metro Networks logo
Between
29 Apr and 28 May 2025
Details
View Map
Share
Follow
Edmunds Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Edmunds Hill, Stradishall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 28 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Jan 2025 at 08:53.

Cityfibre Metro Networks logo
Between
7 and 20 May 2025
Details
View Map
Share
Follow
Coltsfoot Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coltsfoot Green, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 20 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 09:01.

Cityfibre Metro Networks logo
Between
7 and 20 May 2025
Details
View Map
Share
Follow
Coltsfoot Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coltsfoot Green, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 20 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jan 2025 at 15:46.

Anglian Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Cheveley Park Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Cheveley Park Road, Woodditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Feb 2025 at 10:07.

Anglian Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Malting End

Anglian Water were proposing to carry out Utility repair and maintenance works on Malting End, Wickhambrook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Feb 2025 at 09:04.

Anglian Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Malting End

Anglian Water are proposing to carry out Utility repair and maintenance works on Malting End, Wickhambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Feb 2025 at 15:03.


Roadworks Map near to Rockall, NEWMARKET, CB8 8TP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Feb 2025 16:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Rockall, NEWMARKET, CB8 8TP (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
MAJOR
  
LADYS GREEN 
(0.9 miles)
Anglian Water
Utility asset works - Carriageway - Some carriageway incursion
In Progress
Since: 27 Feb 2023 12:08
(Scheduled: 27 Feb 2023 - 31 Mar 2025)
0.9
Details
Share
Follow
2
Anglian Water logo
MAJOR
  
OUSDEN ROAD 
(0.9 miles)
Anglian Water
Utility asset works - Carriageway - Some carriageway incursion
In Progress
Since: 27 Feb 2023 12:08
(Scheduled: 27 Feb 2023 - 31 Mar 2025)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.