ROADWORKS SUMMARY
Newmarket Heath, NEWMARKET, CB8 0XG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Newmarket Heath, CB8 0XG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Newmarket Heath, NEWMARKET, CB8 0XG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Newmarket Heath are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Swaffham Heath Road (C218)

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Swaffham Heath Road (C218), Swaffham Bulbeck.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 15 Oct 2024 at 10:12.

Cambridgeshire County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Cambridge To Newmarket Road

Cambridgeshire County Council are carrying out Highway improvement works on Cambridge To Newmarket Road, Swaffham Bulbeck.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 15 Oct 2024 at 10:11.

Cambridgeshire County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Swaffham Heath Road

Cambridgeshire County Council are carrying out Highway improvement works on Swaffham Heath Road, Dullingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2024 at 13:32.

Suffolk County Council logo
Between
23 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Fordham Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Fordham Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 16 Oct 2024 at 10:18.

Suffolk County Council logo
Between
23 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Fordham Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Fordham Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 29 Oct 2024 at 12:42.

Suffolk County Council logo
Between
23 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Fordham Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Fordham Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 29 Oct 2024 at 13:04.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Hall Farm

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Hall Farm, Stetchworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 13:09.

Gigaclear logo
Finishing
Tuesday
Details
View Map
Share
Follow
High Street

Gigaclear are carrying out Utility repair and maintenance works on High Street, Swaffham Bulbeck.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:10 and could run through until 5 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Oct 2024 at 08:14.

Gigaclear logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Gigaclear are proposing to carry out Utility repair and maintenance works on High Street, Swaffham Bulbeck.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Jul 2024 at 09:59.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
London Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on London Road, Dullingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 13:05.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
London Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on London Road, Stetchworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 13:06.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Station Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Station Road, Dullingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 13:18.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
London Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on London Road, Westley Waterless.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 13:07.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Bradley Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Bradley Road, Burrough Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Sep 2024 at 15:05.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Palace Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Palace Street, Newmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Aug 2024 at 10:13.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Palace Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Palace Street, Newmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Aug 2024 at 14:32.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Palace Street

Anglian Water are carrying out Utility repair and maintenance works on Palace Street, Newmarket.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 07:18 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 07:18.

Anglian Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Toyse Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Toyse Lane, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2024 at 16:25.

Anglian Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Toyse Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Toyse Lane, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Sep 2024 at 16:26.

Cambridge Water Company logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Brinkley Road

Cambridge Water Company are proposing to carry out New service connection on Brinkley Road, Little Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 16 Sep 2024 at 11:26.

Anglian Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Snailwell Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Snailwell Road, Chippenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 13 Sep 2024 at 12:11.

Anglian Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Mill Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 08:53.

Anglian Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Mill Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 15:41.

Anglian Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Mill Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Mill Lane, Burwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Sep 2024 at 08:57.

Anglian Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Snailwell Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Snailwell Road, Chippenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 08:52.

National Highways logo
Between
18 and 23 Nov 2024
Details
View Map
Share
Follow
Swaffham Heath Road (C218)

National Highways are proposing to carry out Works for road purposes on Swaffham Heath Road (C218), Swaffham Bulbeck.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Oct 2024 at 07:00.

National Highways logo
Between
18 and 23 Nov 2024
Details
View Map
Share
Follow
Swaffham Heath Road (C218)

National Highways are proposing to carry out Works for road purposes on Swaffham Heath Road (C218), Swaffham Bulbeck.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 23 Oct 2024 at 12:42.

Cambridge Water Company logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Brinkley Road

Cambridge Water Company are proposing to carry out New service connection on Brinkley Road, Little Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 20 Sep 2024 at 15:39.

Electricity Network Company logo
Between
22 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Willie Snaith Road

Electricity Network Company are proposing to carry out Utility asset works on Willie Snaith Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 10 Sep 2024 at 08:00.

Electricity Network Company logo
Between
22 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Willie Snaith Road

Electricity Network Company are proposing to carry out Utility asset works on Willie Snaith Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 08:33.

Electricity Network Company logo
Between
22 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Willie Snaith Road

Electricity Network Company are proposing to carry out Utility asset works on Willie Snaith Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 6 Sep 2024 at 09:56.

Anglian Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Centre Drive

Anglian Water are proposing to carry out Utility repair and maintenance works on Centre Drive, Cheveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Sep 2024 at 13:56.

Anglian Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Newnham Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Newnham Lane, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 13:04.

Cambridgeshire County Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Dullingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 24 Sep 2024 at 08:18.

Cambridgeshire County Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Dullingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2024 at 15:33.


Roadworks Map near to Newmarket Heath, NEWMARKET, CB8 0XG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 22:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Newmarket Heath, NEWMARKET, CB8 0XG (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
CHURCHILL AVENUE, SUFFOLK 
(1.0 miles)
BT
Utility asset works - Footway, Verge - Give and take
Complete
29 Oct 2024 14:00 - 15:00
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.