ROADWORKS SUMMARY
Jermyn Close, CAMBRIDGE, CB4 2HQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Jermyn Close, CB4 2HQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Jermyn Close, CAMBRIDGE, CB4 2HQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Jermyn Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Between
7 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Silver Street

Cambridgeshire County Council are proposing to carry out Works for road purposes on Silver Street, Cambridge.

These works are categorised as Major.

The works will start on or after 7 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 29 Jul 2025 at 14:42.

Cambridgeshire County Council logo
LONG TERM
Until
16 Jan 2026
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are carrying out Highway improvement works on High Street, Barton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2025 at 09:30 and could run through until 16 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 4 Aug 2025 at 15:05.

Cambridgeshire County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Hills Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Hills Road, Cambridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 10 Jan 2025 at 14:31.

Cambridgeshire County Council logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Hills Road

Cambridgeshire County Council are carrying out Highway improvement works on Hills Road, Cambridge.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 20:00 and could run through until 3 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 10 Jul 2025 at 14:10.

Cambridgeshire County Council logo
LONG TERM
Between
30 May 2025 and 29 May 2026
Details
View Map
Share
Follow
Addenbrookes Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Addenbrookes Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 29 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 18 Feb 2025 at 11:50.

Cambridgeshire County Council logo
LONG TERM
Between
2 Jun and 20 Oct 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Cottenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 6 Jun 2024 at 14:34.

Cambridgeshire County Council logo
LONG TERM
Until
30 Oct 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are carrying out Highway improvement works on Oakington Road, Cottenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Aug 2025 at 15:07.

Cambridgeshire County Council logo
LONG TERM
Between
9 Jun and 30 Oct 2025
Details
View Map
Share
Follow
Coton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Coton Road, Grantchester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 28 May 2025 at 16:03.

Cambridgeshire County Council logo
LONG TERM
Between
2 Aug and 5 Oct 2025
Details
View Map
Share
Follow
Hinton Road

Cambridgeshire County Council are proposing to carry out Section 50 on Hinton Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 8 Aug 2025 at 14:23.

Cambridgeshire County Council logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Hinton Road

Cambridgeshire County Council are carrying out Section 50 on Hinton Road, Fulbourn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 09:00 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 18 Aug 2025 at 12:34.

Cambridgeshire County Council logo
LONG TERM
Between
2 Aug and 9 Nov 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

Cambridgeshire County Council are proposing to carry out Highway improvement works on Fulbourn Old Drift, Fulbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 15:18.

Cambridgeshire County Council logo
LONG TERM
Between
2 Aug and 9 Nov 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

Cambridgeshire County Council are proposing to carry out Highway improvement works on Fulbourn Old Drift, Fulbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 15 Jul 2025 at 09:16.

Cambridgeshire County Council logo
LONG TERM
Between
2 Aug and 5 Oct 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

Cambridgeshire County Council are proposing to carry out Section 50 on Fulbourn Old Drift, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 8 Aug 2025 at 14:23.

Cambridgeshire County Council logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

Cambridgeshire County Council are carrying out Section 50 on Fulbourn Old Drift, Fulbourn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 09:00 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 18 Aug 2025 at 12:34.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulbourn Old Drift, Teversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jun 2025 at 09:41.

Cambridgeshire County Council logo
LONG TERM
Until
30 Jan 2026
Details
View Map
Share
Follow
Barton Road

Cambridgeshire County Council are carrying out Highway improvement works on Barton Road, Grantchester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 20:00 and could run through until 30 January 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2025 at 07:57.

Cadent Gas logo
LONG TERM
Between
11 Aug 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Bateman Street

Cadent Gas are proposing to carry out Utility asset works on Bateman Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:46.

Cadent Gas logo
LONG TERM
Between
11 Aug 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Bateman Street

Cadent Gas are proposing to carry out Utility asset works on Bateman Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 12:46.

Cadent Gas logo
LONG TERM
Between
11 Aug and 28 Nov 2025
Details
View Map
Share
Follow
Russell Street

Cadent Gas are proposing to carry out Utility asset works on Russell Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:42.

Cadent Gas logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Russell Street

Cadent Gas are carrying out Utility asset works on Russell Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 08:53 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 08:59.

Cadent Gas logo
LONG TERM
Between
11 Aug and 28 Nov 2025
Details
View Map
Share
Follow
Coronation Street

Cadent Gas are proposing to carry out Utility asset works on Coronation Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:40.

Cadent Gas logo
LONG TERM
Until
3 Dec 2025
Details
View Map
Share
Follow
Coronation Street

Cadent Gas are carrying out Utility asset works on Coronation Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2025 at 11:46 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 11:51.

Cadent Gas logo
LONG TERM
Between
11 Aug and 28 Nov 2025
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Utility asset works on Union Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 14:39.

Cadent Gas logo
LONG TERM
Between
11 Aug and 28 Nov 2025
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Utility asset works on Union Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 12:50.

Cadent Gas logo
LONG TERM
Between
11 Aug 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Hills Road

Cadent Gas are proposing to carry out Utility asset works on Hills Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 12:31.

Cadent Gas logo
LONG TERM
Between
11 Aug 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Hills Road

Cadent Gas are proposing to carry out Utility asset works on Hills Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 15:09.

Cadent Gas logo
LONG TERM
Until
20 Feb 2026
Details
View Map
Share
Follow
Hills Road

Cadent Gas are carrying out Utility asset works on Hills Road, Cambridge.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2025 at 08:44 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 09:01.

Cadent Gas logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Union Road

Cadent Gas are carrying out Utility asset works on Union Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 August 2025 at 12:07 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 12:50.

Cadent Gas logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Bateman Street

Cadent Gas are carrying out Utility asset works on Bateman Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 August 2025 at 11:51 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 12:52.

Cambridge Water Company logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Cowley Road

Cambridge Water Company are carrying out Utility asset works on Cowley Road, Cambridge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 8 Sep 2025 at 16:31.

Cadent Gas logo
LONG TERM
Between
25 Aug and 26 Sep 2025
Details
View Map
Share
Sedley Taylor Road

Cadent Gas were proposing to carry out Utility asset works on Sedley Taylor Road, Cambridge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 12:40.

Cadent Gas logo
LONG TERM
Between
25 Aug 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Hills Road

Cadent Gas are proposing to carry out Utility asset works on Hills Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 15:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 28 Sep 2025
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Bridge Street, Cambridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2025 at 15:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 28 Sep 2025
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bridge Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 08:41.

Cambridgeshire County Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Comberton Road

Cambridgeshire County Council are carrying out Highway improvement works on Comberton Road, Barton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 26 Aug 2025 at 11:41.

Cambridgeshire County Council logo
LONG TERM
Between
1 Sep and 22 Dec 2025
Details
View Map
Share
Follow
Burleigh Place

Cambridgeshire County Council are proposing to carry out Works for road purposes on Burleigh Place, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 11:11.

Cambridgeshire County Council logo
LONG TERM
Between
1 Sep and 22 Dec 2025
Details
View Map
Share
Follow
Burleigh Place

Cambridgeshire County Council are proposing to carry out Works for road purposes on Burleigh Place, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 11:46.

Cambridgeshire County Council logo
LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
The Footpath

Cambridgeshire County Council are proposing to carry out Highway improvement works on The Footpath, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 11:38.

Cambridgeshire County Council logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
The Footpath

Cambridgeshire County Council are proposing to carry out Highway improvement works on The Footpath, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 12:23.

Cambridgeshire County Council logo
LONG TERM
Between
2 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Whitwell Way

Cambridgeshire County Council are proposing to carry out Highway improvement works on Whitwell Way, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 12:27.

Cambridgeshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Ely Road (A10)

Cambridgeshire County Council are carrying out Highway improvement works on Ely Road (A10), Landbeach.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2025 at 09:30 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 8 Sep 2025 at 08:30.

Cambridgeshire County Council logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Cherry Hinton Road (C235)

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Cherry Hinton Road (C235), Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Sep 2025 at 10:56.

Cambridgeshire County Council logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Perne Road (A1134)

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Perne Road (A1134), Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Sep 2025 at 10:46.

Cambridgeshire County Council logo
Between
9 Sep and 3 Oct 2025
Details
View Map
Share
Follow
New Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on New Road, Barton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 14 Jul 2025 at 13:42.

Cadent Gas logo
Thursday
Details
View Map
Share
Cambridge Footpath 16

Cadent Gas carried out Utility repair and maintenance works on Cambridge Footpath 16, Cambridge.

The works were originally planned between 10 Sep 2025 and 25 Sep 2025 and were actually completed between 10 Sep 2025 (02:29) and 18 Sep 2025 (15:19). The works impacted the verge only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 15:27.

Cambridgeshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Brentwood Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brentwood Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 26 Jun 2025 at 10:45.

Cambridgeshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Brentwood Close

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Brentwood Close, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 08:00 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2025 at 10:52.

Cambridgeshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Bergholt Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bergholt Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 1 Jul 2025 at 09:20.

Cambridgeshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bergholt Close

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Bergholt Close, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 08:00 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2025 at 10:55.

Cambridgeshire County Council logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Milton Road Roundabout

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Milton Road Roundabout, Milton.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 16:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2025 at 14:49.

Between
13 Sep and 5 Oct 2025
Details
View Map
Share
Newmarket Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility asset works on Newmarket Road, Cambridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 September 2025 and run through until 5 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Jun 2025 at 13:21.

Between
13 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Newmarket Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Newmarket Road, Cambridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Jul 2025 at 10:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Gazelle Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Gazelle Way, Teversham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Feb 2025 at 12:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Gazelle Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Gazelle Way, Teversham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Aug 2025 at 10:47.

Cambridgeshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Fernlea Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Fernlea Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 1 Jul 2025 at 09:24.

Cambridgeshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Fernlea Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Fernlea Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 9 Jul 2025 at 09:21.

Cambridge Water Company logo
Finishing
Today
Details
View Map
Share
Follow
St Philips Road

Cambridge Water Company are carrying out Utility repair and maintenance works on St Philips Road, Cambridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 21:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 18 Sep 2025 at 15:42.

Cambridge Water Company logo
Finishing
Today
Details
View Map
Share
Follow
Penarth Place

Cambridge Water Company are carrying out Utility repair and maintenance works on Penarth Place, Cambridge.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 13:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 15 Sep 2025 at 15:24.

Cambridgeshire County Council logo
LONG TERM
Between
15 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Trinity Street

Cambridgeshire County Council are proposing to carry out Section 50 on Trinity Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Jun 2025 at 09:39.

Cambridgeshire County Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Trinity Street

Cambridgeshire County Council are carrying out Section 50 on Trinity Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2025 at 12:40.

Cambridgeshire County Council logo
LONG TERM
Between
15 Sep and 24 Oct 2025
Details
View Map
Share
Trinity Street

Cambridgeshire County Council were proposing to carry out Section 50 on Trinity Street, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Jun 2025 at 10:58.

Cambridgeshire County Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Whitwell Way

Cambridgeshire County Council are proposing to carry out Highway improvement works on Whitwell Way, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 12:20.

Cambridgeshire County Council logo
LONG TERM
Between
15 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Whitwell Way

Cambridgeshire County Council are proposing to carry out Highway improvement works on Whitwell Way, Coton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 4 Sep 2025 at 13:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
High Ditch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 15:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
High Ditch Road

UK Power Networks Eastern & London were proposing to carry out New service connection on High Ditch Road, Fen Ditton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 10 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jul 2025 at 14:51.

Cambridge Water Company logo
Finishing
Today
Details
View Map
Share
Follow
Milton Road

Cambridge Water Company are carrying out New service connection on Milton Road, Impington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:00 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 15 Sep 2025 at 09:38.

Cambridgeshire County Council logo
Between
16 Sep and 10 Oct 2025
Details
View Map
Share
Follow
The Footpath

Cambridgeshire County Council are proposing to carry out Highway improvement works on The Footpath, Coton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 1 Sep 2025 at 11:59.

Cambridgeshire County Council logo
Between
16 Sep and 10 Oct 2025
Details
View Map
Share
Follow
The Footpath

Cambridgeshire County Council are proposing to carry out Highway improvement works on The Footpath, Coton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 10 Sep 2025 at 14:03.

Cambridge Water Company logo
Monday
Details
View Map
Share
Haslingfield Road

Cambridge Water Company carried out Utility repair and maintenance works on Haslingfield Road, Barton.

The road was closed for some or all of the period.

The works were originally planned between 18 Sep 2025 and 22 Sep 2025 and were actually completed on 18 Sep 2025 between 11:00 and 16:10. The works impacted the verge only.

This roadwork event was last updated by Cambridge Water Company on 18 Sep 2025 at 16:15.

Hutchinson 3G logo
Finishing
Thursday
Details
View Map
Share
Wulfstan Way

Hutchinson 3G were proposing to carry out Utility asset works on Wulfstan Way, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 21 Jul 2025 at 09:19.

Cambridgeshire County Council logo
LONG TERM
Between
22 Sep and 14 Nov 2025
Details
View Map
Share
Follow
The Footpath

Cambridgeshire County Council are proposing to carry out Highway improvement works on The Footpath, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 14 November 2025. The works will impact the carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 10 Sep 2025 at 11:48.

Cambridgeshire County Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Brook Lane

Cambridgeshire County Council are proposing to carry out Highway improvement works on Brook Lane, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 12:23.

Cambridgeshire County Council logo
LONG TERM
Between
26 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 12:23.

UK Power Networks Eastern & London logo
Between
28 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Woodhouse Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodhouse Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 3 October 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 08:56.

Cambridgeshire County Council logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Fendon Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Fendon Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 11 Sep 2025 at 21:55.

Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Devonshire Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility asset works on Devonshire Road, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Jul 2025 at 12:39.

Cambridgeshire County Council logo
LONG TERM
Between
29 Sep 2025 and 29 May 2026
Details
View Map
Share
Follow
Adams Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Adams Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 May 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2025 at 12:11.

Cambridgeshire County Council logo
LONG TERM
Between
29 Sep and 8 Nov 2025
Details
View Map
Share
Follow
Whitwell Way

Cambridgeshire County Council are proposing to carry out Highway improvement works on Whitwell Way, Coton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2025 at 11:02.

Cambridgeshire County Council logo
Between
2 and 4 Oct 2025
Details
View Map
Share
Follow
Coleridge Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Coleridge Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 10 Sep 2025 at 14:44.

Cambridgeshire County Council logo
LONG TERM
Between
6 Oct and 28 Nov 2025
Details
View Map
Share
Follow
New Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on New Road, Barton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 22 Aug 2025 at 08:26.

Between
6 and 31 Oct 2025
Details
View Map
Share
Devonshire Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility asset works on Devonshire Road, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Aug 2025 at 15:49.

UK Power Networks Eastern & London logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Madingley Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Madingley Road, Cambridge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 16:16.

UK Power Networks Eastern & London logo
Between
7 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulbourn Old Drift, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jun 2025 at 10:52.

UK Power Networks Eastern & London logo
Between
7 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulbourn Old Drift, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 12:41.

Cambridgeshire County Council logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2025 at 12:23.

UK Power Networks Eastern & London logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Woodhouse Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodhouse Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2025 at 09:09.

UK Power Networks Eastern & London logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Woodhouse Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodhouse Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2025 at 09:27.

Cityfibre Metro Networks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Milton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Milton Road, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Aug 2025 at 08:59.

Cityfibre Metro Networks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Milton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Milton Road, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Aug 2025 at 09:20.

Cityfibre Metro Networks logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Clay Close Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Clay Close Lane, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Aug 2025 at 15:12.

Cityfibre Metro Networks logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Clay Close Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Clay Close Lane, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Aug 2025 at 12:09.

Network Rail logo
Between
17 and 19 Oct 2025
Details
View Map
Share
Follow
Bannold Road

Network Rail are proposing to carry out Works for Rail Purposes on Bannold Road, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Jul 2025 at 08:33.

Network Rail logo
Between
17 and 19 Oct 2025
Details
View Map
Share
Follow
Bannold Road

Network Rail are proposing to carry out Works for Rail Purposes on Bannold Road, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Sep 2025 at 10:13.

Cambridgeshire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Brooklands Avenue

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brooklands Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2025 at 12:05.

Cadent Gas logo
LONG TERM
Between
20 Oct and 13 Dec 2025
Details
View Map
Share
Follow
Cromwell Road

Cadent Gas are proposing to carry out Utility asset works on Cromwell Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:36.

Cambridgeshire County Council logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Coton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 4 Sep 2025 at 13:27.

Cambridgeshire County Council logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Coton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 5 Sep 2025 at 13:08.

Cambridgeshire County Council logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 5 Mar 2025 at 14:26.

Cambridgeshire County Council logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 15 Jul 2025 at 14:02.

Cambridgeshire County Council logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 29 Jul 2025 at 14:09.

Cityfibre Metro Networks logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Park Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Park Lane, Dry Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Aug 2025 at 15:49.

Cityfibre Metro Networks logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Park Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Park Lane, Dry Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Aug 2025 at 09:05.

Cambridge Water Company logo
Between
23 and 31 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridge Water Company are proposing to carry out New service connection on Cambridge Road, Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 22 Aug 2025 at 10:12.

Cambridge Water Company logo
Between
23 and 31 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridge Water Company are proposing to carry out New service connection on Cambridge Road, Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 26 Aug 2025 at 10:47.

Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Newmarket Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Newmarket Road, Cambridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Sep 2025 at 16:30.

Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Newmarket Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Newmarket Road, Cambridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Sep 2025 at 09:38.

Cambridgeshire County Council logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Cambridge Road (B1049)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road (B1049), Impington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2025 at 12:31.

Cambridgeshire County Council logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Cambridge Road (B1049)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road (B1049), Impington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2025 at 15:37.

Hutchinson 3G logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Wulfstan Way

Hutchinson 3G are proposing to carry out Utility asset works on Wulfstan Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 15 Aug 2025 at 13:08.

Hutchinson 3G logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Wulfstan Way

Hutchinson 3G are proposing to carry out Utility asset works on Wulfstan Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 9 Sep 2025 at 14:52.

Cambridgeshire County Council logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Norfolk Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on Norfolk Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 15 Sep 2025 at 16:36.

Cambridgeshire County Council logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Whitwell Way

Cambridgeshire County Council are proposing to carry out Highway improvement works on Whitwell Way, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2025 at 11:43.

Hutchinson 3G logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Mount Pleasant

Hutchinson 3G are proposing to carry out Utility asset works on Mount Pleasant, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 11 Aug 2025 at 15:20.

Hutchinson 3G logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Mount Pleasant

Hutchinson 3G are proposing to carry out Utility asset works on Mount Pleasant, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 10 Sep 2025 at 11:45.

Cityfibre Metro Networks logo
Between
27 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Park Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Park Street, Dry Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Aug 2025 at 15:13.

Cityfibre Metro Networks logo
Between
27 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Park Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Park Street, Dry Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Aug 2025 at 13:27.

Cambridgeshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 2 Jun 2025 at 09:40.

Cambridgeshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 29 May 2025 at 11:23.

Cambridgeshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
New Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on New Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 29 May 2025 at 11:21.

Cambridgeshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 29 May 2025 at 11:19.

BT logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility repair and maintenance works on Park Lane, Cambridgeshire, Histon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Jul 2025 at 08:20.

Cambridge Water Company logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Park Lane

Cambridge Water Company are proposing to carry out New service connection on Park Lane, Histon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 30 Apr 2025 at 16:04.

Cambridge Water Company logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Park Lane

Cambridge Water Company are proposing to carry out New service connection on Park Lane, Histon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 13 May 2025 at 09:34.

Cambridgeshire County Council logo
Between
30 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Girton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 3 Mar 2025 at 17:13.

Cambridgeshire County Council logo
Between
30 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Girton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Mar 2025 at 14:39.

Cadent Gas logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
New Street

Cadent Gas are proposing to carry out Utility asset works on New Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 17:00.

Cadent Gas logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
Follow
New Street

Cadent Gas are proposing to carry out Utility asset works on New Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 14:30.

Cambridgeshire County Council logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
The Footpath

Cambridgeshire County Council are proposing to carry out Highway improvement works on The Footpath, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 1 Sep 2025 at 12:18.

Cambridgeshire County Council logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
The Footpath

Cambridgeshire County Council are proposing to carry out Highway improvement works on The Footpath, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 3 Sep 2025 at 15:51.

Cambridge Water Company logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Hobart Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Hobart Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 5 Sep 2025 at 16:03.

Cityfibre Metro Networks logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Oakington Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Oakington Road, Dry Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Aug 2025 at 16:30.

Cityfibre Metro Networks logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Oakington Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Oakington Road, Dry Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2025 at 10:44.

Cadent Gas logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Abbey Walk

Cadent Gas are proposing to carry out Utility asset works on Abbey Walk, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 15:00.

Cadent Gas logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
York Street

Cadent Gas are proposing to carry out Utility asset works on York Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 14:30.

Cambridgeshire County Council logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 3 Mar 2025 at 17:01.

Cambridgeshire County Council logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Mar 2025 at 14:43.

Cityfibre Metro Networks logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Harding Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Harding Way, Histon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2025 at 14:03.

Cityfibre Metro Networks logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Harding Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Harding Way, Histon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 10:24.

Cityfibre Metro Networks logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Harding Way

Cityfibre Metro Networks were proposing to carry out Utility asset works on Harding Way, Histon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 12:33.

Cityfibre Metro Networks logo
Between
11 and 18 Nov 2025
Details
View Map
Share
Park Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Park Lane, Histon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 18 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Aug 2025 at 13:35.

Cityfibre Metro Networks logo
Between
13 and 17 Nov 2025
Details
View Map
Share
Manor Park

Cityfibre Metro Networks were proposing to carry out Utility asset works on Manor Park, Histon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 17 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2025 at 14:12.

Cambridgeshire County Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Jun 2025 at 17:28.

Cambridgeshire County Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 11 Jun 2025 at 15:03.

Cambridgeshire County Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Jun 2025 at 09:54.

Cambridgeshire County Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
New Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on New Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jun 2025 at 15:30.

Cambridgeshire County Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jun 2025 at 09:24.

Cambridgeshire County Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Jun 2025 at 15:18.

Cityfibre Metro Networks logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Footpath Leading To Foxhollow

Cityfibre Metro Networks were proposing to carry out Utility asset works on Footpath Leading To Foxhollow, Bar Hill.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Aug 2025 at 10:41.

Cambridge Water Company logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Cambridge Road

Cambridge Water Company were proposing to carry out New service connection on Cambridge Road, Oakington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 23 Jun 2025 at 11:49.

Cityfibre Metro Networks logo
Between
1 and 9 Dec 2025
Details
View Map
Share
High Street

Cityfibre Metro Networks were proposing to carry out Utility asset works on High Street, Dry Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 9 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 11:43.

Cityfibre Metro Networks logo
Between
1 and 9 Dec 2025
Details
View Map
Share
Follow
High Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Dry Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 9 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 11:45.

Cityfibre Metro Networks logo
Between
3 and 5 Dec 2025
Details
View Map
Share
Manor Park

Cityfibre Metro Networks were proposing to carry out Utility asset works on Manor Park, Histon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 11:47.

Cityfibre Metro Networks logo
Between
3 and 8 Dec 2025
Details
View Map
Share
Follow
Manor Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Manor Park, Histon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 11:51.

Cambridgeshire County Council logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 4 Sep 2025 at 10:12.

Cambridgeshire County Council logo
LONG TERM
Between
15 Dec 2025 and 5 Jun 2026
Details
View Map
Share
Follow
Addenbrookes Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Addenbrookes Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 5 June 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 11 Apr 2025 at 09:35.


Roadworks Map near to Jermyn Close, CAMBRIDGE, CB4 2HQ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 23:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Jermyn Close, CAMBRIDGE, CB4 2HQ (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cambridge Water Company logo
FORDWICH CLOSE 
(0.0 miles)
Cambridge Water Company
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 20 Sep 2025 - 22 Sep 2025
0.0
Details
Share
Follow
2
Cityfibre Metro Networks logo
MERE WAY 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.2
Details
Share
Follow
3
Virgin Media logo
TAVISTOCK ROAD 
(0.4 miles)
Virgin Media
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 20 Sep 2025
0.4
Details
Share
Follow
4
BT logo
METCALFE ROAD 
(0.5 miles)
BT
Utility asset works - Footway, Verge - Give and take
In Progress
Since: 18 Sep 2025 09:30
(Scheduled: 18 Sep 2025 - 19 Sep 2025)
0.5
Details
Share
Follow
5
Cambridgeshire County Council logo
CAMBRIDGE ROAD (B1049) 
(0.7 miles)
Cambridgeshire County Council
Highway improvement works - Verge - No carriageway incursion
Planned
Scheduled: 17 Sep 2025 - 19 Sep 2025
0.7
Details
Share
Follow
6
BT logo
CHESTERTON HALL CRESCENT 
(0.9 miles)
BT
Utility asset works - Footway, Verge - Give and take
Cancelled
(Scheduled: 19 Sep 2025 - 22 Sep 2025)
0.9
Details
Share
7
BT logo
CHESTERTON HALL CRESCENT 
(0.9 miles)
BT
Utility asset works - Footway, Verge - Give and take
Planned
Scheduled: 19 Sep 2025 - 22 Sep 2025
0.9
Details
Share
Follow
8
UK Power Networks Eastern & London logo
RAMSDEN SQUARE 
(1.0 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 15 Sep 2025 09:58
(Scheduled: 15 Sep 2025 - 19 Sep 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.