Image of petrol pumps

View current and future planned roadworks and road closures for Villa Road, CB24 1BU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Villa Road, CAMBRIDGE, CB24 1BU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Villa Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Rampton Road

Cadent Gas are proposing to carry out Utility asset works on Rampton Road, Longstanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:52.

Cadent Gas logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Footpath Leading To Gladeside And Almond Grove

Cadent Gas are carrying out Utility asset works on Footpath Leading To Gladeside And Almond Grove, Bar Hill.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 4 November 2024 at 11:14 and could run through until 6 December 2024. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:10.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Footpath Leading To Gladeside And Almond Grove

Cadent Gas are proposing to carry out Utility asset works on Footpath Leading To Gladeside And Almond Grove, Bar Hill.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 14:35.

Cadent Gas logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Trafalgar Way

Cadent Gas were proposing to carry out Utility asset works on Trafalgar Way, Bar Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 14:25.

Cadent Gas logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Crafts Way

Cadent Gas were proposing to carry out Utility asset works on Crafts Way, Bar Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:31.

Cambridgeshire County Council logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huntingdon Road Eastbound

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Eastbound, Fen Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:23.

Cambridgeshire County Council logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huntingdon Road Eastbound

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Eastbound, Fen Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Oct 2024 at 15:22.

Cambridgeshire County Council logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huntingdon Road Westbound

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Westbound, Fen Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:23.

Cambridgeshire County Council logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huntingdon Road Westbound

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Westbound, Fen Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Oct 2024 at 15:22.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crafts Way

Cadent Gas are proposing to carry out Utility asset works on Crafts Way, Bar Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:50.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Hollytrees

Cadent Gas were proposing to carry out Utility asset works on Hollytrees, Bar Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:31.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Hollytrees

Cadent Gas are proposing to carry out Utility asset works on Hollytrees, Bar Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:18.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
The Brambles

Cadent Gas were proposing to carry out Utility asset works on The Brambles, Bar Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:39.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
The Brambles

Cadent Gas are proposing to carry out Utility asset works on The Brambles, Bar Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:17.

Cambridge Water Company logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

Cambridge Water Company are proposing to carry out Utility asset works on Station Road, Over.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 18 Oct 2024 at 16:03.

Cambridge Water Company logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Thornton Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Thornton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 10 Oct 2024 at 14:03.

Cambridge Water Company logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Thornton Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Thornton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 2 Oct 2024 at 16:07.

Cambridge Water Company logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Woodlark Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Woodlark Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 18 Oct 2024 at 12:40.

Cambridge Water Company logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Woodlark Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Woodlark Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 17 Oct 2024 at 12:22.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Girton Road

Cambridgeshire County Council were proposing to carry out Highway improvement works on Girton Road, Girton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:38.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Girton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:02.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Girton Road

Cambridgeshire County Council were proposing to carry out Highway improvement works on Girton Road, Girton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:36.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Girton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:46.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Girton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 25 Sep 2024 at 10:19.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Huntingdon Road

Cambridgeshire County Council were proposing to carry out Highway improvement works on Huntingdon Road, Girton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:36.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Huntingdon Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Huntingdon Road, Girton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 25 Sep 2024 at 10:19.

Cambridgeshire County Council logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Oakington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Nov 2024 at 11:22.

Cambridge Water Company logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Butt Lane (C206)

Cambridge Water Company are proposing to carry out New service connection on Butt Lane (C206), Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 27 Sep 2024 at 13:52.

G2 Energy IDNO logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Cameron Road

G2 Energy IDNO are proposing to carry out Utility asset works on Cameron Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 26 Nov 2024 at 08:16.

Cambridge Water Company logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridge Water Company are proposing to carry out Utility asset works on Station Road, Over.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 25 Oct 2024 at 09:56.

Cambridge Water Company logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Butt Lane (C206)

Cambridge Water Company are proposing to carry out New service connection on Butt Lane (C206), Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 18 Oct 2024 at 14:41.

Cambridgeshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Fen Drayton Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Fen Drayton Road, Swavesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 22 Nov 2024 at 16:07.

Cambridgeshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Twentypence Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Twentypence Road, Cottenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 13:36.


Roadworks Map near to Villa Road, CAMBRIDGE, CB24 1BU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 06:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Villa Road, CAMBRIDGE, CB24 1BU (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
RAMPTON ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 28 Oct 2024 - 29 Nov 2024
0.4
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
RAMPTON ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Complete
1 Nov 2024 09:52 - 22 Nov 2024 11:53
0.4
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.