ROADWORKS SUMMARY
Saxon Way, CAMBRIDGE, CB23 8AP
Introduction
View current and future planned roadworks and road closures for Saxon Way, CB23 8AP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Saxon Way, CAMBRIDGE, CB23 8AP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Saxon Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Dec 2024
Cadent Gas are carrying out Utility asset works on Headlands, Fenstanton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 09:32 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:51.
Friday
Cadent Gas are proposing to carry out Utility asset works on Rampton Road, Longstanton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:52.
6 Dec 2024
Cadent Gas are carrying out Utility asset works on Footpath Leading To Gladeside And Almond Grove, Bar Hill.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 4 November 2024 at 11:14 and could run through until 6 December 2024. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:10.
Friday
Cadent Gas are proposing to carry out Utility asset works on Footpath Leading To Gladeside And Almond Grove, Bar Hill.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 14:35.
11 Nov and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Trafalgar Way, Bar Hill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 14:25.
11 Nov and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Crafts Way, Bar Hill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:31.
18 Nov 2024 and 30 Mar 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Westbound, Fen Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 18 Oct 2024 at 15:22.
18 Nov 2024 and 30 Mar 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Westbound, Fen Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:23.
18 Nov and 6 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Hollytrees, Bar Hill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:31.
18 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Crafts Way, Bar Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:50.
18 Nov 2024 and 30 Mar 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Eastbound, Fen Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 18 Oct 2024 at 15:22.
18 Nov 2024 and 30 Mar 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Eastbound, Fen Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:23.
6 Dec 2024
Cadent Gas are carrying out Utility asset works on Church Leys, Fenstanton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 12:50 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 08:39.
25 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Hollytrees, Bar Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:18.
25 Nov and 13 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on The Brambles, Bar Hill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:39.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on The Brambles, Bar Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:17.
9 and 20 Dec 2024
Cambridge Water Company are proposing to carry out Utility asset works on Station Road, Over.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridge Water Company on 18 Oct 2024 at 16:03.
16 and 19 Dec 2024
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Thornton Road, Girton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 2 Oct 2024 at 16:07.
16 and 19 Dec 2024
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Thornton Road, Girton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 10 Oct 2024 at 14:03.
18 and 20 Dec 2024
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Woodlark Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 17 Oct 2024 at 12:22.
18 and 20 Dec 2024
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Woodlark Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 18 Oct 2024 at 12:40.
6 Jan and 14 Feb 2025
Cambridgeshire County Council were proposing to carry out Highway improvement works on Girton Road, Girton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:36.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hilton Road, Fenstanton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:50.
6 and 10 Jan 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Conington Road, Fenstanton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:00.
6 and 10 Jan 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Conington Road, Conington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:03.
6 and 27 Jan 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Broadway, Bourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 16:05.
6 Jan and 14 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Huntingdon Road, Girton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridgeshire County Council on 25 Sep 2024 at 10:19.
6 Jan and 14 Feb 2025
Cambridgeshire County Council were proposing to carry out Highway improvement works on Huntingdon Road, Girton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:36.
6 Jan and 14 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Cambridgeshire County Council on 25 Sep 2024 at 10:19.
6 Jan and 14 Feb 2025
Cambridgeshire County Council were proposing to carry out Highway improvement works on Girton Road, Girton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:38.
6 Jan and 14 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:02.
6 Jan and 14 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:46.
13 Jan and 21 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Oakington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 14 Nov 2024 at 11:22.
20 and 31 Jan 2025
Cambridge Water Company are proposing to carry out Utility asset works on Station Road, Over.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridge Water Company on 25 Oct 2024 at 09:56.
20 and 24 Jan 2025
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Arbury Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 23 Oct 2024 at 15:39.
27 and 29 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:57.
27 and 29 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 09:30.
29 Jan and 11 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Swaynes Lane, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:56.
10 and 28 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Carlton Way, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 23 Apr 2024 at 12:04.
10 and 14 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Barton Road, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:56.
13 and 19 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Hines Lane, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 11:30.
13 and 19 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Hines Lane, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 11:20.
17 Feb and 2 Mar 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Jeavons Lane, Cambourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 6 Nov 2024 at 13:07.
17 and 21 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Fen Drayton Road, Swavesey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 22 Nov 2024 at 16:07.
18 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Green End, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:41.
18 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Green End, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:32.
24 Feb and 7 Mar 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on St Neots Road, Hardwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Cambridgeshire County Council on 18 Nov 2024 at 13:49.
Roadworks Map near to Saxon Way, CAMBRIDGE, CB23 8AP
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Saxon Way, CAMBRIDGE, CB23 8AP (12 Events)
(Scheduled Dates)
(miles)
(Scheduled: 4 Nov 2024 - 6 Dec 2024)
(Scheduled: 18 Nov 2024 - 6 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.