ROADWORKS SUMMARY
Princess Drive, CAMBRIDGE, CB22 3DL
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for Princess Drive, CB22 3DL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Princess Drive, CAMBRIDGE, CB22 3DL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Princess Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Jul 2025
Cambridgeshire County Council are carrying out Works for road purposes on Cambridge Road, Hinxton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 09:39 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 13:50.
Sunday
UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 12:58.
4 Mar 2025
UK Power Networks Eastern & London are carrying out New service connection on Coldhams Lane, Cambridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 11:30 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 14:59.
Sunday
UK Power Networks Eastern & London were proposing to carry out New service connection on Queens Meadow, Cambridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 10:51.
Sunday
UK Power Networks Eastern & London are proposing to carry out New service connection on Queens Meadow, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:01.
4 Mar 2025
UK Power Networks Eastern & London are carrying out New service connection on Queens Meadow, Cambridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 11:30 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 14:59.
Sunday
UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 12:53.
22 Mar 2025
UK Power Networks Eastern & London are carrying out New service connection on Coldhams Lane, Cambridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 11:29 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 14:59.
11 Apr 2025
UK Power Networks Eastern & London are carrying out New service connection on Perne Road (A1134), Cambridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 08:00 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Feb 2025 at 11:30.
3 Mar 2025
UK Power Networks Eastern & London are carrying out New service connection on Brooks Road, Cambridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 11:00 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Jan 2025 at 11:19.
Friday
Cambridgeshire County Council are proposing to carry out Works for road purposes on Station Road, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 16 Aug 2024 at 15:37.
Friday
Cambridgeshire County Council are carrying out Works for road purposes on Station Road, Great Shelford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 09:00 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 27 Jan 2025 at 09:04.
Friday
Cambridgeshire County Council are proposing to carry out Section 50 on Station Road, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 6 Sep 2024 at 09:36.
Friday
Cambridgeshire County Council are proposing to carry out Section 50 on Station Road, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 6 Sep 2024 at 09:49.
2 and 28 Feb 2025
Cambridgeshire County Council are proposing to carry out roadworks on M11 J11 Leave N, South Cambridgeshire.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 28 Jan 2025 at 10:17.
3 Feb and 29 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Hobart Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 9 Jan 2025 at 16:14.
3 Feb and 29 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Suez Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 9 Jan 2025 at 16:15.
3 Feb and 29 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Marmora Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 9 Jan 2025 at 16:13.
3 Feb and 29 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Madras Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 9 Jan 2025 at 16:14.
Tomorrow
Cityfibre Metro Networks are proposing to carry out Utility asset works on Stonebridge Lane, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 12 Nov 2024 at 12:09.
Tomorrow
Cityfibre Metro Networks are carrying out Utility asset works on Stonebridge Lane, Fulbourn.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 09:00 and could run through until 18 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Feb 2025 at 09:17.
10 Feb and 2 Mar 2025
Cambridge Water Company were proposing to carry out Utility asset works on Fulbourn Old Drift, Fulbourn.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 2 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 25 Nov 2024 at 14:58.
Today
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Natal Road, Cambridge.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 10:37 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Feb 2025 at 11:40.
Sunday
Cambridge Water Company are proposing to carry out Utility asset works on Church Street, Harston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 16 Dec 2024 at 14:05.
Sunday
Cambridge Water Company are carrying out Utility asset works on Church Street, Harston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 09:00 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 17 Feb 2025 at 09:13.
17 Feb 2025 and 24 Dec 2027
Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Hauxton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 December 2027. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Cambridgeshire County Council on 3 Feb 2025 at 13:29.
17 Feb 2025 and 24 Dec 2027
Cambridgeshire County Council are proposing to carry out Highway improvement works on Trumpington Park And Ride Access Road, Cambridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 December 2027. The works will impact the carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Cambridgeshire County Council on 3 Feb 2025 at 13:29.
17 Feb and 9 Mar 2025
Cambridge Water Company are proposing to carry out Utility asset works on Fulbourn Old Drift, Fulbourn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 16 Dec 2024 at 12:25.
17 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Teversham Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 12:53.
14 Mar 2025
Cadent Gas are carrying out Utility asset works on Teversham Road, Fulbourn.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 08:58 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 09:04.
17 Feb and 16 Mar 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 10 Oct 2024 at 14:02.
17 Feb and 16 Mar 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 10 Oct 2024 at 16:04.
17 Feb and 16 May 2025
Cadent Gas were proposing to carry out Utility asset works on Station Road, Fulbourn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:22.
17 Feb and 16 May 2025
Cadent Gas were proposing to carry out Utility asset works on Wilbraham Road, Fulbourn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:22.
17 Feb and 4 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cambridge Footpath 9, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the cycleway only.
This roadwork event was last updated by Cambridgeshire County Council on 22 Jan 2025 at 15:25.
18 Feb and 16 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:20.
22 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 10:38.
22 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 2 Dec 2024 at 10:12.
22 Feb and 3 Mar 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Station Road, Great Shelford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Dec 2024 at 07:50.
22 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 9 Jan 2025 at 14:55.
24 and 26 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Carmen Street, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 12:34.
24 and 26 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Carmen Street, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Dec 2024 at 13:36.
24 Feb and 5 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Church Lane, Sawston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Dec 2024 at 10:12.
28 Feb and 16 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Hillfield, Foxton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:20.
3 Mar and 26 Jun 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Hobart Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 5 Feb 2025 at 15:27.
3 Mar and 26 Jun 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Marmora Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 5 Feb 2025 at 15:13.
3 Mar and 26 Jun 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Madras Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 5 Feb 2025 at 15:28.
3 Mar and 26 Jun 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Suez Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 5 Feb 2025 at 15:27.
3 Mar and 18 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cambridge Footpath 9, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the cycleway only.
This roadwork event was last updated by Cambridgeshire County Council on 4 Feb 2025 at 12:53.
5 and 7 Mar 2025
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Ross Street, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridge Water Company on 10 Jan 2025 at 15:07.
5 and 7 Mar 2025
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Ross Street, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridge Water Company on 17 Jan 2025 at 12:14.
7 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Newmarket Road, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:41.
7 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Newmarket Road, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Feb 2025 at 11:46.
7 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:42.
7 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Feb 2025 at 11:42.
7 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Ickleton Road, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:43.
7 and 11 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Ickleton Road, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 14:08.
10 and 13 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Ickleton Road, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Dec 2024 at 11:17.
10 and 13 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Ickleton Road, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 30 Jan 2025 at 16:04.
10 and 14 Mar 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Rectory Road, Duxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:16.
10 Mar and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 11:24.
10 Mar and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 12:04.
10 Mar and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 11:40.
10 Mar and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 11:24.
10 Mar and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 08:34.
10 Mar and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Wilbraham Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 11:24.
10 Mar and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Wilbraham Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 11:41.
10 Mar and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Wilbraham Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 11:40.
13 Mar and 4 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Barnwell Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 4 April 2025. The works will impact the cycleway only.
This roadwork event was last updated by Cambridgeshire County Council on 20 Jan 2025 at 17:58.
17 and 29 Mar 2025
Essex County Council were proposing to carry out Highway improvement works on Walden Road, Great Chesterford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 18:31.
17 and 21 Mar 2025
Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Granhams Road, Great Shelford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 24 Dec 2024 at 08:19.
24 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Street, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 09:00.
24 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Street, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 9 Jan 2025 at 11:16.
24 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Mingle Lane, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 09:00.
24 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Mingle Lane, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 9 Jan 2025 at 11:13.
24 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Mingle Lane, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 09:00.
24 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Mingle Lane, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 9 Jan 2025 at 11:15.
24 and 30 Mar 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Argyle Street, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 7 Feb 2025 at 12:30.
24 and 30 Mar 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Great Eastern Street, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 31 Jan 2025 at 14:17.
6 and 25 Apr 2025
Cambridge Water Company are proposing to carry out Utility asset works on Devonshire Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridge Water Company on 23 Aug 2024 at 11:40.
7 and 21 Apr 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jan 2025 at 15:32.
7 and 11 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Sep 2024 at 12:21.
7 and 11 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Sep 2024 at 12:57.
7 and 11 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Sep 2024 at 10:26.
7 Apr and 28 Jun 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Worts Causeway, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 31 Jan 2025 at 11:48.
7 Apr and 28 Jun 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Worts Causeway, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 31 Jan 2025 at 15:34.
7 Apr and 28 Jun 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Field Way, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 31 Jan 2025 at 11:48.
7 Apr and 28 Jun 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Field Way, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cambridgeshire County Council on 31 Jan 2025 at 15:34.
7 Apr and 22 Aug 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Hills Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Cambridgeshire County Council on 6 Aug 2024 at 09:37.
7 Apr and 8 Aug 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Hills Road, Cambridge.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Cambridgeshire County Council on 6 Sep 2024 at 10:15.
8 and 11 Apr 2025
Cambridge Water Company were proposing to carry out Utility repair and maintenance works on High Street (C233), Cambridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 April 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Cambridge Water Company on 17 Dec 2024 at 11:36.
8 and 11 Apr 2025
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street (C233), Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Cambridge Water Company on 31 Dec 2024 at 14:29.
9 and 13 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on St Vigors Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 13 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 22 Jan 2025 at 14:52.
10 and 13 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on All Saints Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 13 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 22 Jan 2025 at 14:47.
10 and 20 Apr 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Mowbray Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Feb 2025 at 10:46.
10 and 14 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Fulbourn Old Drift, Teversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 21 Jan 2025 at 13:58.
11 and 14 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Godwin Close, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 00:05.
11 and 14 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Gunhild Close, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 21 Jan 2025 at 14:25.
12 and 16 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Gunhild Way, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 21 Jan 2025 at 14:14.
13 and 17 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Godwin Way, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 21 Jan 2025 at 14:51.
14 and 22 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Dogget Lane, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 9 Jan 2025 at 11:26.
14 and 22 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Dogget Lane, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Feb 2025 at 11:49.
14 and 18 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on St Thomas's Square, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 21 Jan 2025 at 15:16.
14 and 17 Apr 2025
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street (C233), Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Cambridge Water Company on 10 Jan 2025 at 15:10.
14 and 17 Apr 2025
Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street (C233), Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Cambridge Water Company on 5 Feb 2025 at 14:44.
14 Apr and 12 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brooklands Avenue, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 30 Jan 2025 at 10:57.
15 and 19 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on St Thomas's Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 21 Jan 2025 at 15:20.
16 and 22 Apr 2025
Cambridgeshire County Council are proposing to carry out Works for road purposes on Hills Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 23 Sep 2024 at 15:04.
16 and 22 Apr 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 23 Sep 2024 at 16:01.
16 and 22 Apr 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Glisson Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 23 Sep 2024 at 13:42.
16 and 22 Apr 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Glisson Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 23 Sep 2024 at 16:01.
17 and 24 Apr 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Suez Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 11 Feb 2025 at 17:17.
21 Apr and 19 Sep 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Hills Road, Cambridge.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Cambridgeshire County Council on 10 Jan 2025 at 14:31.
21 Apr and 16 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Mowbray Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 16:22.
21 and 24 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Ludlow Lane, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 9 Jan 2025 at 15:10.
21 and 24 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Ludlow Lane, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Feb 2025 at 11:52.
23 Apr and 1 May 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 23 Sep 2024 at 15:53.
23 Apr and 1 May 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 23 Sep 2024 at 16:01.
23 Apr and 1 May 2025
Cambridgeshire County Council were proposing to carry out Section 50 on Hills Road, Cambridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 23 Sep 2024 at 15:47.
28 Apr and 16 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Mowbray Road, Cambridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 16:50.
28 Apr and 2 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 6 Feb 2025 at 16:12.
28 Apr and 2 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 13 Feb 2025 at 10:59.
28 Apr and 2 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Wilbraham Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 28 Jan 2025 at 16:03.
28 Apr and 2 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Wilbraham Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 6 Feb 2025 at 16:12.
28 Apr and 2 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Wilbraham Road, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 13 Feb 2025 at 11:01.
30 Apr and 17 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Perne Road (A1134), Cambridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 17 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 16:44.
2 and 8 May 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 10 Oct 2024 at 14:19.
2 and 8 May 2025
Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 10 Oct 2024 at 16:04.
6 May and 6 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fulbourn Old Drift, Fulbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:14.
8 and 12 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Street, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Feb 2025 at 10:16.
8 and 12 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on School Street, Great Chesterford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 12 Feb 2025 at 12:59.
11 and 17 May 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Coleridge Road, Cambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 27 Jan 2025 at 11:32.
12 and 23 May 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Street, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 11:29.
12 and 16 May 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Vine Close, Stapleford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 11 Feb 2025 at 11:45.
12 and 16 May 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Vine Close, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 11:29.
Roadworks Map near to Princess Drive, CAMBRIDGE, CB22 3DL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Princess Drive, CAMBRIDGE, CB22 3DL (12 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Feb 2025 - 2 Mar 2025)
(Scheduled: 14 Feb 2025 - 18 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.