ROADWORKS SUMMARY
Front Street, BRAMPTON, CA8 1NN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Front Street, CA8 1NN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Front Street, BRAMPTON, CA8 1NN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Front Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Road From Nickies Hill Crossroads North To Knorren Bridge

Cumberland Council were proposing to carry out Highway repair and maintenance works on Road From Nickies Hill Crossroads North To Knorren Bridge, Walton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 23 Jan 2025 at 14:59.

Cumberland Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Road Leading From Knorren Bridge North To High Greenhill

Cumberland Council were proposing to carry out Highway repair and maintenance works on Road Leading From Knorren Bridge North To High Greenhill, Kirkcambeck.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 7 Feb 2025 at 18:02.

Cumberland Council logo
LONG TERM
Between
1 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Road Leading From Knorren Bridge North To High Greenhill

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Knorren Bridge North To High Greenhill, Kirkcambeck.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 15 Nov 2024 at 07:37.

Cumberland Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Road From Nickies Hill Crossroads North To Knorren Bridge

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road From Nickies Hill Crossroads North To Knorren Bridge, Walton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 10 Oct 2024 at 14:31.

Cumberland Council logo
Finishing
Tomorrow
Details
View Map
Share
Front Street

Cumberland Council were proposing to carry out Highway repair and maintenance works on Front Street, Brampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 9 Dec 2024 at 08:43.

Cumberland Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Front Street

Cumberland Council are proposing to carry out Highway repair and maintenance works on Front Street, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 13 Nov 2024 at 11:14.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 31 Jul 2024 at 16:25.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Oct 2024 at 09:22.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 10:05.

Fibrus Networks logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Road Leading From Chapel House Caravan To Car Park East Of Ullerbank Farm

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Chapel House Caravan To Car Park East Of Ullerbank Farm, Talkin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 5 Feb 2025 at 12:37.

Fibrus Networks logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Road Leading From Chapel House Caravan To Car Park East Of Ullerbank Farm

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Chapel House Caravan To Car Park East Of Ullerbank Farm, Talkin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 10 Feb 2025 at 09:28.

Fibrus Networks logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Road Leading From End Rectory Road To Carrick Fell Junction

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From End Rectory Road To Carrick Fell Junction, Heads Nook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Fibrus Networks on 13 Feb 2025 at 15:33.

Fibrus Networks logo
Between
6 and 8 Mar 2025
Details
View Map
Share
Follow
Road Leading From End Rectory Road To Carrick Fell Junction

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From End Rectory Road To Carrick Fell Junction, Heads Nook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 8 March 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 13 Feb 2025 at 15:34.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Road Leading To Wrea And Unity Farms From Capon Hill

BT were proposing to carry out Utility repair and maintenance works on Road Leading To Wrea And Unity Farms From Capon Hill, Brampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Dec 2024 at 07:32.

United Utilities Water (formerly North West Water) logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Paving Brow

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Paving Brow, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Dec 2024 at 14:49.

United Utilities Water (formerly North West Water) logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Paving Brow

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Paving Brow, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 09:40.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Irthington To Newtown At Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Irthington To Newtown At Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 09:16.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Irthington To Newtown At Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Irthington To Newtown At Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Jan 2025 at 07:48.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 09:18.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Jan 2025 at 07:49.

Fibrus Networks logo
Between
19 and 22 Mar 2025
Details
View Map
Share
Follow
Access Road To Walby From The B6264

Fibrus Networks are proposing to carry out Utility asset works on Access Road To Walby From The B6264, Crosby On Eden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 22 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 12 Feb 2025 at 12:48.

Cumberland Council logo
LONG TERM
Between
24 Mar and 31 May 2025
Details
View Map
Share
Follow
Road Leading From Knorren Bridge North To High Greenhill

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Knorren Bridge North To High Greenhill, Kirkcambeck.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 29 Jan 2025 at 13:31.

BT logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Back Lane

BT are proposing to carry out Utility asset works on Back Lane, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Jan 2025 at 13:16.

BT logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Back Lane

BT are proposing to carry out Utility asset works on Back Lane, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 14 Jan 2025 at 10:27.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Road Leading To Wrea And Unity Farms From Capon Hill

BT are proposing to carry out Utility repair and maintenance works on Road Leading To Wrea And Unity Farms From Capon Hill, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 16 Jan 2025 at 09:45.

Northern Gas Networks logo
LONG TERM
Between
7 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Newby East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newby East, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 10:22.

Network Rail logo
Between
13 and 15 Apr 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Network Rail are proposing to carry out Works for Rail Purposes on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Jan 2025 at 14:10.

Network Rail logo
Between
13 and 15 Apr 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Network Rail are proposing to carry out Works for Rail Purposes on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Dec 2024 at 08:03.

Cumberland Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Road Leading From Junction South Of Irthington To Laversdale Lane Junction Via Laversdale

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Junction South Of Irthington To Laversdale Lane Junction Via Laversdale, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 5 Feb 2025 at 11:51.

Cumberland Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Road Leading From Junction South Of Irthington To Laversdale Lane Junction Via Laversdale

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Junction South Of Irthington To Laversdale Lane Junction Via Laversdale, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 6 Feb 2025 at 11:54.

Northern Gas Networks logo
LONG TERM
Between
21 Apr and 18 Jul 2025
Details
View Map
Share
Newby East

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Newby East, Wetheral.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 18 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Jan 2025 at 08:25.

Fibrus Networks logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
From Junction 43 On The M6 To Warwick On Eden On The A69t Via Wetheral

Fibrus Networks are proposing to carry out Utility asset works on From Junction 43 On The M6 To Warwick On Eden On The A69t Via Wetheral, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 11 Feb 2025 at 09:21.

Electricity North West (NorWeb) logo
Between
23 and 29 Apr 2025
Details
View Map
Share
Follow
Road Leading To Wrea And Unity Farms From Capon Hill

Electricity North West (NorWeb) are proposing to carry out New service connection on Road Leading To Wrea And Unity Farms From Capon Hill, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Jan 2025 at 10:49.

Cumberland Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Road Leading From Corry House Junction South To Fenton Lane End Via Fenton

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Corry House Junction South To Fenton Lane End Via Fenton, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Feb 2025 at 11:45.

Cumberland Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Road Leading From Corry House Junction South To Fenton Lane End Via Fenton

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Corry House Junction South To Fenton Lane End Via Fenton, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Feb 2025 at 11:51.


Roadworks Map near to Front Street, BRAMPTON, CA8 1NN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Front Street, BRAMPTON, CA8 1NN (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cumberland Council logo
MAJOR
  
FRONT STREET 
(0.1 miles)
Cumberland Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 10 Feb 2025 - 18 Feb 2025
0.1
Details
Share
Follow
2
Cumberland Council logo
MAJOR
  
FRONT STREET 
(0.1 miles)
Cumberland Council
Highway repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 10 Feb 2025 - 18 Feb 2025)
0.1
Details
Share
3
Northern Gas Networks logo
EMERGENCY
  
TREE ROAD 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
In Progress
Since: 16 Feb 2025 19:10
(Scheduled: 16 Feb 2025 - 21 Feb 2025)
0.4
Details
Share
Follow
4
Electricity North West (NorWeb) logo
TOWNFOOT INDUSTRIAL ESTATE 
(0.5 miles)
Electricity North West (NorWeb)
New service connection - Footway - Some carriageway incursion
In Progress
Since: 5 Feb 2025 16:35
(Scheduled: 5 Feb 2025 - 17 Feb 2025)
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.