ROADWORKS SUMMARY
Kirkland Road, WIGTON, CA7 9JB
Introduction

View current and future planned roadworks and road closures for Kirkland Road, CA7 9JB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Kirkland Road, WIGTON, CA7 9JB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kirkland Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
24 and 28 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on Moorhouse To Junction With Wigton To Oulton, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 4 Mar 2025 at 13:50.
24 and 28 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Fibrus Networks on 10 Mar 2025 at 14:55.
24 and 28 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Fibrus Networks on 5 Mar 2025 at 11:59.
24 and 28 Mar 2025
Fibrus Networks were proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Fibrus Networks on 4 Mar 2025 at 15:38.
24 and 28 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Fibrus Networks on 3 Mar 2025 at 13:47.
24 and 28 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on From The A596 To The A595, Thursby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 10 Mar 2025 at 14:51.
24 and 28 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on From The A596 To The A595, Thursby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 4 Mar 2025 at 11:40.
24 and 28 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on Moorhouse To Junction With Wigton To Oulton, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 10 Mar 2025 at 14:50.
24 Mar and 4 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on B5302 Wigton To Waverbridge, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 12 Feb 2025 at 08:23.
31 Mar and 4 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With B5307 At Fingland To Little Bampton, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 7 Jan 2025 at 10:03.
31 Mar and 8 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With B5307 At Fingland To Little Bampton, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 8 Jan 2025 at 10:52.
7 and 11 Apr 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Minor Road Through Aikton To Moordyke, Aikton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the verge only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 Dec 2024 at 08:27.
7 and 11 Apr 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Minor Road Through Aikton To Moordyke, Aikton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the verge only.
This roadwork event was last updated by Electricity North West (NorWeb) on 24 Feb 2025 at 07:43.
14 and 18 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 8 Jan 2025 at 10:34.
14 and 18 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 22 Jan 2025 at 08:09.
14 and 18 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 7 Jan 2025 at 10:09.
28 Apr and 2 May 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With B5307 At Fingland To Little Bampton, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 4 Feb 2025 at 14:11.
29 Apr and 1 May 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Water Street, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Mar 2025 at 07:17.
29 Apr and 1 May 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Water Street, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Feb 2025 at 08:06.
2 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Shaw Wood Road To Junction With Whinnow Road, Thursby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 13 Mar 2025 at 08:09.
2 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on Wiggonby On The C2051 To The A596, Aikton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 13 Mar 2025 at 08:11.
2 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on Thornby To Woodhouses, Aikton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 13 Mar 2025 at 08:12.
2 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on From The B5307 To The C2051 Via Oughterby, Aikton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 14 Mar 2025 at 08:18.
2 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on Cuddy Lonning, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 14 Mar 2025 at 12:33.
2 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on Longthwaite Road, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 14 Mar 2025 at 12:30.
2 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on Cuddy Lonning To Longthwaite, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 14 Mar 2025 at 12:35.
2 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on Wigton To Junction With Fletchertown To The A596 At Leegate House, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 14 Mar 2025 at 12:36.
9 and 20 Jun 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With A596 Near Parkgate To Junction With Wigton To Junction With Flechertown To A596, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 24 Feb 2025 at 07:58.
Roadworks Map near to Kirkland Road, WIGTON, CA7 9JB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Kirkland Road, WIGTON, CA7 9JB (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 13 Mar 2025 - 17 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.