ROADWORKS SUMMARY
Kirkbride, WIGTON, CA7 5HW
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for CA7 5HW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Kirkbride, WIGTON, CA7 5HW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Tomorrow
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Minor Road From The Green To Lane End, Blencogo.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 February 2025 at 20:48 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Feb 2025 at 09:10.
Sunday
Fibrus Networks are proposing to carry out Utility asset works on Glasson To Junction With Whitrigg To Bowness On Solway At Guard House, Glasson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the verge only.
This roadwork event was last updated by Fibrus Networks on 10 Dec 2024 at 13:48.
3 and 7 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With B5307 At Fingland To Little Bampton, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 11 Dec 2024 at 11:55.
5 and 11 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on Minor Road From Bowness On Solway To Kirkbride, Bowness On Solway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 12 Dec 2024 at 15:02.
5 and 11 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on Whitrigg To Bowness On Solway Via Kirkbride, Bowness On Solway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 12 Dec 2024 at 15:02.
10 and 14 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 11 Dec 2024 at 13:04.
17 and 21 Mar 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Drumburgh To Junction With Easton To Eastonbridge Cottage, Bowness On Solway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 4 Feb 2025 at 08:32.
17 and 21 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on Glasson To Junction With Whitrigg To Bowness On Solway At Guard House, Glasson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 2 Jan 2025 at 11:55.
17 and 21 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on Minor Road Through Anthorn Village Along Foreshore, Anthorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 13 Dec 2024 at 11:52.
24 Mar and 4 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on B5302 Wigton To Waverbridge, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 12 Feb 2025 at 08:23.
24 and 28 Mar 2025
Fibrus Networks are proposing to carry out Utility asset works on Anthorn To Whitrigg, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 13 Dec 2024 at 12:04.
31 Mar and 4 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With B5307 At Fingland To Little Bampton, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 7 Jan 2025 at 10:03.
31 Mar and 8 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With B5307 At Fingland To Little Bampton, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 8 Jan 2025 at 10:52.
31 Mar and 4 Apr 2025
Fibrus Networks were proposing to carry out Utility asset works on West Whitrigg To Whitrigg, Kirkbride.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 19 Dec 2024 at 11:31.
7 and 11 Apr 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Minor Road Through Aikton To Moordyke, Aikton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the verge only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 Dec 2024 at 08:27.
7 and 11 Apr 2025
Fibrus Networks were proposing to carry out Utility asset works on Angerton To Whitrigg, Bowness On Solway.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 19 Dec 2024 at 11:35.
8 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Abbey Road, Abbeytown.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 21 Jan 2025 at 08:43.
8 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Abbey Road, Abbeytown.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 27 Jan 2025 at 08:45.
8 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Abbey Road, Abbeytown.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 22 Jan 2025 at 13:14.
14 and 18 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 22 Jan 2025 at 08:09.
14 and 18 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 8 Jan 2025 at 10:34.
14 and 18 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With Kirkbride To Oulton At Corbet Houses To Wiggonby, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 7 Jan 2025 at 10:09.
21 and 25 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on Minor Road Through Anthorn Village Along Foreshore, Anthorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 10 Jan 2025 at 09:02.
21 and 25 Apr 2025
Fibrus Networks are proposing to carry out Utility asset works on Anthorn To Whitrigg, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 10 Jan 2025 at 09:02.
28 Apr and 2 May 2025
Fibrus Networks are proposing to carry out Utility asset works on From Junction With B5307 At Fingland To Little Bampton, Kirkbride.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 4 Feb 2025 at 14:11.
29 Apr and 1 May 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Water Street, Wigton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Feb 2025 at 08:06.
Roadworks Map near to Kirkbride, WIGTON, CA7 5HW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Kirkbride, WIGTON, CA7 5HW (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.