ROADWORKS SUMMARY
Orton Grange, CARLISLE, CA5 6JZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for CA5 6JZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Orton Grange, CARLISLE, CA5 6JZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Between
1 Dec 2024 and 1 Dec 2025
Details
View Map
Share
Follow
Court Square

Cumberland Council are proposing to carry out Highway improvement works on Court Square, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 21 Oct 2024 at 15:21.

Cumberland Council logo
LONG TERM
Until
1 Dec 2025
Details
View Map
Share
Follow
Court Square

Cumberland Council are carrying out Highway improvement works on Court Square, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 07:00 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 2 Dec 2024 at 09:56.

Cumberland Council logo
LONG TERM
Until
18 Oct 2025
Details
View Map
Share
Follow
The Crescent

Cumberland Council are carrying out Highway improvement works on The Crescent, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 06:00 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 28 Aug 2025 at 10:09.

Cumberland Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Road Leading From Stoneraise Through Ratten Row

Cumberland Council are carrying out Highway improvement works on Road Leading From Stoneraise Through Ratten Row, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 00:01 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 27 Aug 2025 at 16:21.

Cumberland Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Peter Lane

Cumberland Council are carrying out Highway improvement works on Peter Lane, Newby West.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 01:00 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 19 Sep 2025 at 11:03.

Cumberland Council logo
LONG TERM
Between
27 May and 24 Oct 2025
Details
View Map
Share
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Mar 2025 at 10:01.

Cumberland Council logo
LONG TERM
Between
9 Jun and 7 Nov 2025
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 5 Mar 2025 at 11:05.

Cumberland Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are carrying out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2025 at 06:01 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 9 Jun 2025 at 08:07.

Cumberland Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Cargo

Cumberland Council were proposing to carry out Highway improvement works on Cargo, Cargo.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 7 Jul 2025 at 13:28.

Cumberland Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Cargo

Cumberland Council are proposing to carry out Highway improvement works on Cargo, Cargo.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 September 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 21 May 2025 at 14:23.

Cumberland Council logo
LONG TERM
Between
16 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Thornby To Woodhouses

Cumberland Council are proposing to carry out Highway repair and maintenance works on Thornby To Woodhouses, Aikton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 21 Feb 2025 at 13:51.

Cumberland Council logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate

Cumberland Council are carrying out Highway improvement works on Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate, Cargo.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 07:30 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 Jun 2025 at 07:46.

Cumberland Council logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Cargo

Cumberland Council are carrying out Highway improvement works on Cargo, Cargo.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 07:30 and could run through until 5 October 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 16 Jun 2025 at 07:46.

Cumberland Council logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Thornby To Woodhouses

Cumberland Council were proposing to carry out Highway repair and maintenance works on Thornby To Woodhouses, Aikton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 7 Jul 2025 at 12:41.

Cumberland Council logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Thornby To Woodhouses

Cumberland Council are proposing to carry out Highway repair and maintenance works on Thornby To Woodhouses, Aikton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 14 Mar 2025 at 13:22.

Cumberland Council logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Thornby To Woodhouses

Cumberland Council are proposing to carry out Highway repair and maintenance works on Thornby To Woodhouses, Aikton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 20 Mar 2025 at 14:16.

Cumberland Council logo
LONG TERM
Between
11 Jul and 15 Dec 2025
Details
View Map
Share
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 July 2025 and run through until 15 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Feb 2025 at 13:59.

Cumberland Council logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council are carrying out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 July 2025 at 01:04 and could run through until 5 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 1 Aug 2025 at 10:35.

Cumberland Council logo
LONG TERM
Between
4 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Access To Blackhall Wood From The C1014

Cumberland Council are proposing to carry out Highway repair and maintenance works on Access To Blackhall Wood From The C1014, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 2 Jun 2025 at 08:31.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 7 Nov 2025
Details
View Map
Share
Holmrook Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Holmrook Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 7 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 14:54.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 7 Nov 2025
Details
View Map
Share
Follow
Holmrook Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holmrook Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 11:55.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 7 Nov 2025
Details
View Map
Share
Follow
Holmrook Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holmrook Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 24 Jun 2025 at 15:52.

Cumberland Council logo
LONG TERM
Between
4 Aug 2025 and 18 Dec 2026
Details
View Map
Share
Follow
Water Street

Cumberland Council are proposing to carry out Highway improvement works on Water Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 December 2026. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 6 Jun 2025 at 10:44.

Cumberland Council logo
LONG TERM
Between
4 Aug 2025 and 3 Aug 2026
Details
View Map
Share
Follow
Water Street

Cumberland Council are proposing to carry out Highway improvement works on Water Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 August 2026. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 10 Jun 2025 at 08:29.

Cumberland Council logo
LONG TERM
Until
8 Oct 2025
Details
View Map
Share
Follow
Thornby To Woodhouses

Cumberland Council are carrying out Highway repair and maintenance works on Thornby To Woodhouses, Aikton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 5 Sep 2025 at 15:04.

Northern Gas Networks logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Holmrook Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Holmrook Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 08:01.

Cumberland Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Access To Blackhall Wood From The C1014

Cumberland Council are carrying out Highway repair and maintenance works on Access To Blackhall Wood From The C1014, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 5 Sep 2025 at 15:05.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Lorne Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lorne Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Jun 2025 at 09:02.

Cumberland Council logo
LONG TERM
Between
3 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 11 Jun 2025 at 15:45.

Cumberland Council logo
Until
22 Sep 2025
Details
View Map
Share
Follow
Newby Cross Village

Cumberland Council are carrying out Highway improvement works on Newby Cross Village, Newby Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 00:01 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 15 Sep 2025 at 09:35.

Cumberland Council logo
Between
4 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Orton Road In Dalston

Cumberland Council are proposing to carry out Works for road purposes on Orton Road In Dalston, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 9 Jun 2025 at 11:34.

Cumberland Council logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Orton Road In Dalston

Cumberland Council are carrying out Works for road purposes on Orton Road In Dalston, Carlisle.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 08:30 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 11 Sep 2025 at 16:30.

Cumberland Council logo
LONG TERM
Between
8 Sep and 12 Nov 2025
Details
View Map
Share
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 12 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 31 Jul 2025 at 15:28.

Electricity North West (NorWeb) logo
Finishing
Sunday
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Aug 2025 at 13:42.

Fibrus Networks logo
Finishing
Thursday
Details
View Map
Share
Glebe Close

Fibrus Networks were proposing to carry out Utility asset works on Glebe Close, Dalston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 September 2025 and run through until 25 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 27 Jun 2025 at 12:38.

Cumberland Council logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Road Leading From Junction South Of Hawksdale Hall South To Rose Bridge

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Junction South Of Hawksdale Hall South To Rose Bridge, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 16 Jul 2025 at 08:16.

Cumberland Council logo
Until
10 Oct 2025
Details
View Map
Share
Follow
Road Leading From Junction South Of Hawksdale Hall South To Rose Bridge

Cumberland Council are carrying out Highway repair and maintenance works on Road Leading From Junction South Of Hawksdale Hall South To Rose Bridge, Dalston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:00 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 18 Sep 2025 at 14:24.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Junction West Of Dalston Bridge To Hawksdale Village Junction

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Junction West Of Dalston Bridge To Hawksdale Village Junction, Dalston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Aug 2025 at 13:37.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Junction West Of Dalston Bridge To Hawksdale Village Junction

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Junction West Of Dalston Bridge To Hawksdale Village Junction, Dalston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Aug 2025 at 08:14.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Junction West Of Dalston Bridge To Hawksdale Village Junction

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Junction West Of Dalston Bridge To Hawksdale Village Junction, Dalston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 10:32.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Junction West Of Dalston Bridge To Hawksdale Village Junction

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Junction West Of Dalston Bridge To Hawksdale Village Junction, Dalston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Aug 2025 at 08:27.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
5 Dec 2025
Details
View Map
Share
Follow
Junction West Of Dalston Bridge To Hawksdale Village Junction

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Junction West Of Dalston Bridge To Hawksdale Village Junction, Dalston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:44 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2025 at 09:44.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
The Green

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on The Green, Dalston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Aug 2025 at 13:36.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
The Green

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on The Green, Dalston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Aug 2025 at 08:14.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
The Green

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on The Green, Dalston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 10:31.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
The Green

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on The Green, Dalston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Aug 2025 at 08:19.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
The Green

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on The Green, Dalston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2025 at 12:11.

Northern Gas Networks logo
Until
10 Oct 2025
Details
View Map
Share
Follow
Lorne Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Lorne Street, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 09:15.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
16 Sep and 5 Dec 2025
Details
View Map
Share
Follow
The Green

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on The Green, Dalston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2025 at 13:48.

United Utilities Water (formerly North West Water) logo
Between
16 and 22 Sep 2025
Details
View Map
Share
Moor Park Avenue

United Utilities Water (formerly North West Water) carried out Utility repair and maintenance works on Moor Park Avenue, Carlisle.

The road was closed for some or all of the period.

The works were originally planned between 16 Sep 2025 and 22 Sep 2025 and were actually completed between 16 Sep 2025 (10:03) and 22 Sep 2025 (16:47). The works impacted the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Sep 2025 at 17:04.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
19 Sep and 5 Dec 2025
Details
View Map
Share
Follow
The Green

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on The Green, Dalston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Sep 2025 at 11:00.

Fibrus Networks logo
Between
19 Sep and 2 Oct 2025
Details
View Map
Share
Glebe Close

Fibrus Networks were proposing to carry out Utility asset works on Glebe Close, Dalston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 2 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 4 Jul 2025 at 15:43.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lakerigg

Cumberland Council are carrying out Highway repair and maintenance works on Lakerigg, Dalston.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 19 Sep 2025 at 15:13.

Cumberland Council logo
LONG TERM
Between
22 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Dalston Road

Cumberland Council are proposing to carry out Highway improvement works on Dalston Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 9 Sep 2025 at 12:58.

Fibrus Networks logo
Between
26 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Glebe Close

Fibrus Networks are proposing to carry out Utility asset works on Glebe Close, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 8 Jul 2025 at 10:52.

Fibrus Networks logo
Between
26 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Glebe Close

Fibrus Networks are proposing to carry out Utility asset works on Glebe Close, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 22 Jul 2025 at 14:29.

Cumberland Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Newbiggin Road

Cumberland Council are proposing to carry out Highway improvement works on Newbiggin Road, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Aug 2025 at 14:46.

Cumberland Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Newbiggin Road

Cumberland Council are proposing to carry out Highway improvement works on Newbiggin Road, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 15 Sep 2025 at 09:38.

Northern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Currock Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Currock Road, Carlisle.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 10:43.

Northern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Currock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Currock Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 11:24.

Northern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Currock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Currock Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 12:48.

Northern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Currock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Currock Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 14:36.

Fibrus Networks logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Road Leading From Raughton To Raughton Head Via Gaitsgill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Raughton To Raughton Head Via Gaitsgill, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 4 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 4 Jul 2025 at 09:26.

Fibrus Networks logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Road Leading From Raughton To Raughton Head Via Gaitsgill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Raughton To Raughton Head Via Gaitsgill, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 4 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Sep 2025 at 08:55.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
6 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
A595 From Junction With B5302 To Access Road To The Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on A595 From Junction With B5302 To Access Road To The Street, Wigton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Aug 2025 at 16:07.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
6 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
A595 From Junction With B5302 To Access Road To The Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on A595 From Junction With B5302 To Access Road To The Street, Wigton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Sep 2025 at 14:20.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
6 Oct 2025 and 6 Feb 2026
Details
View Map
Share
A595 From Junction With B5302 To Access Road To The Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on A595 From Junction With B5302 To Access Road To The Street, Wigton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 6 February 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Sep 2025 at 09:34.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
6 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
A595 Crofton Bridge To Junction With B5302

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on A595 Crofton Bridge To Junction With B5302, West Woodside.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Sep 2025 at 11:56.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
6 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
A595 Crofton Bridge To Junction With B5302

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on A595 Crofton Bridge To Junction With B5302, West Woodside.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Sep 2025 at 12:37.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
6 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
A595 Crofton Bridge To Junction With B5302

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on A595 Crofton Bridge To Junction With B5302, West Woodside.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Sep 2025 at 10:58.

Cumberland Council logo
Between
6 and 12 Oct 2025
Details
View Map
Share
Follow
Road Leading From Brisco To Wreay

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 13 Aug 2025 at 07:31.

Northern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Currock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Currock Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Jun 2025 at 10:07.

Northern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Currock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Currock Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 14:54.

Northern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Currock Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Currock Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Sep 2025 at 10:25.

Cumberland Council logo
LONG TERM
Between
6 Oct 2025 and 30 Jan 2026
Details
View Map
Share
Eastern Way

Cumberland Council were proposing to carry out Highway repair and maintenance works on Eastern Way, Carlisle.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 30 January 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cumberland Council on 7 Jul 2025 at 15:06.

Cumberland Council logo
LONG TERM
Between
6 Oct 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Eastern Way

Cumberland Council are proposing to carry out Highway repair and maintenance works on Eastern Way, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 9 Jul 2025 at 09:15.

Cumberland Council logo
LONG TERM
Between
6 Oct 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Eastern Way

Cumberland Council are proposing to carry out Highway repair and maintenance works on Eastern Way, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 10 Jul 2025 at 13:27.

Cumberland Council logo
LONG TERM
Between
6 Oct 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Eastern Way

Cumberland Council are proposing to carry out Highway repair and maintenance works on Eastern Way, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 11 Jul 2025 at 08:19.

Fibrus Networks logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Nine Rigg

Fibrus Networks were proposing to carry out Utility asset works on Nine Rigg, Dalston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Fibrus Networks on 9 Jul 2025 at 15:02.

Electricity North West (NorWeb) logo
Between
9 and 29 Oct 2025
Details
View Map
Share
Follow
Petteril Bank Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Petteril Bank Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Aug 2025 at 09:53.

Electricity North West (NorWeb) logo
Between
9 and 29 Oct 2025
Details
View Map
Share
Follow
Petteril Bank Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Petteril Bank Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Aug 2025 at 14:58.

Cumberland Council logo
Between
12 and 18 Oct 2025
Details
View Map
Share
Follow
The Crescent

Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 28 Aug 2025 at 09:57.

Cumberland Council logo
LONG TERM
Between
13 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 1 Aug 2025 at 10:41.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
13 Oct 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Aikton To Wiggonby

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Aikton To Wiggonby, Thursby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Aug 2025 at 13:28.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
13 Oct 2025 and 19 Jan 2026
Details
View Map
Share
Follow
From The B5307 To The C2051 Via Oughterby

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on From The B5307 To The C2051 Via Oughterby, Aikton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Aug 2025 at 13:29.

Cumberland Council logo
Between
13 and 18 Oct 2025
Details
View Map
Share
Follow
The Crescent

Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 29 Aug 2025 at 10:39.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
13 Oct 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Oughterby Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Oughterby Village, Oughterby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Aug 2025 at 13:27.

Electricity North West (NorWeb) logo
Between
16 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2025 at 09:09.

Cumberland Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Junction In Hawksdale Village To Nether Welton Farm

Cumberland Council are proposing to carry out Highway repair and maintenance works on Junction In Hawksdale Village To Nether Welton Farm, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Sep 2025 at 10:04.

Cumberland Council logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Road Leading From Brisco To Wreay

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 18 Sep 2025 at 08:33.

Cumberland Council logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Road Leading From Brisco To Wreay

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 17 Sep 2025 at 14:41.

Cumberland Council logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Road Leading From Brisco To Wreay

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 22 Sep 2025 at 09:42.

Cumberland Council logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Road Leading From Brisco To Wreay

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 1 Aug 2025 at 14:16.

Fibrus Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Nine Rigg

Fibrus Networks are proposing to carry out Utility asset works on Nine Rigg, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Fibrus Networks on 11 Jul 2025 at 08:53.

Fibrus Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Nine Rigg

Fibrus Networks are proposing to carry out Utility asset works on Nine Rigg, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Fibrus Networks on 21 Aug 2025 at 11:41.

Northern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Dalston Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Dalston Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 12:46.

Electricity North West (NorWeb) logo
Between
29 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Kirkbampton To Junction With Fingland To Little Bampton

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkbampton To Junction With Fingland To Little Bampton, Kirkbampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Jul 2025 at 14:14.

Electricity North West (NorWeb) logo
Between
29 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Kirkbampton To Junction With Fingland To Little Bampton

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkbampton To Junction With Fingland To Little Bampton, Kirkbampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 31 Jul 2025 at 15:54.

Electricity North West (NorWeb) logo
Between
29 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Kirkbampton To Junction With Fingland To Little Bampton

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkbampton To Junction With Fingland To Little Bampton, Kirkbampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Aug 2025 at 07:35.

Electricity North West (NorWeb) logo
Between
29 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Kirkbampton To Junction With Fingland To Little Bampton

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkbampton To Junction With Fingland To Little Bampton, Kirkbampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Aug 2025 at 13:59.

Electricity North West (NorWeb) logo
Between
29 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Kirkbampton Village

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkbampton Village, Kirkbampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Jul 2025 at 14:14.

Electricity North West (NorWeb) logo
Between
29 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Kirkbampton Village

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkbampton Village, Kirkbampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 31 Jul 2025 at 15:53.

Electricity North West (NorWeb) logo
Between
29 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Kirkbampton Village

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkbampton Village, Kirkbampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Aug 2025 at 07:36.

Electricity North West (NorWeb) logo
Between
29 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Kirkbampton Village

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkbampton Village, Kirkbampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Aug 2025 at 13:58.

Cumberland Council logo
Between
3 and 16 Nov 2025
Details
View Map
Share
Newbiggin Road

Cumberland Council were proposing to carry out Highway improvement works on Newbiggin Road, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 16 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 1 Aug 2025 at 14:23.

Cumberland Council logo
Between
3 and 16 Nov 2025
Details
View Map
Share
Newbiggin Road

Cumberland Council were proposing to carry out Highway improvement works on Newbiggin Road, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 16 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 17 Sep 2025 at 14:33.

Cumberland Council logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Dalston Road

Cumberland Council are proposing to carry out Highway improvement works on Dalston Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 10 Sep 2025 at 11:31.

Northern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Orton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Orton Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Jul 2025 at 10:40.

Cumberland Council logo
Between
10 and 18 Nov 2025
Details
View Map
Share
Follow
Road Leading From Rose Bridge To Birkdale Castle Junction Via Raughton Head

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Rose Bridge To Birkdale Castle Junction Via Raughton Head, Raughton Head.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 4 Sep 2025 at 09:18.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
10 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Junction West Of Dalston Bridge To Hawksdale Village Junction

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Junction West Of Dalston Bridge To Hawksdale Village Junction, Dalston.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 30 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Aug 2025 at 11:20.

Cumberland Council logo
LONG TERM
Between
10 Nov 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Eastern Way

Cumberland Council are proposing to carry out Highway repair and maintenance works on Eastern Way, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 22 Jul 2025 at 08:26.

Cumberland Council logo
Between
11 and 25 Nov 2025
Details
View Map
Share
Follow
Newbiggin Road

Cumberland Council are proposing to carry out Highway improvement works on Newbiggin Road, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 22 Sep 2025 at 09:38.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
17 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Wiggonby On The C2051 To The A596

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Wiggonby On The C2051 To The A596, Aikton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 12:25.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
17 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Wiggonby Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Wiggonby Village, Wiggonby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 12:25.

United Utilities Water (formerly North West Water) logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Beech Grove

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Beech Grove, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Sep 2025 at 08:49.

United Utilities Water (formerly North West Water) logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Follow
Road Leading From Orton Grange Junction To North Of Great Orton

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Road Leading From Orton Grange Junction To North Of Great Orton, Great Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Sep 2025 at 15:26.

United Utilities Water (formerly North West Water) logo
Between
16 and 18 Dec 2025
Details
View Map
Share
Follow
Parton Village

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Parton Village, Parton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2025 and could run through until 18 December 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 07:13.


Roadworks Map near to Orton Grange, CARLISLE, CA5 6JZ (6 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Last Updated: 22 Sep 2025 23:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Orton Grange, CARLISLE, CA5 6JZ (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Fibrus Networks logo
ROAD LEADING FROM CARDEWLEES TO ORTON GRANGE 
(0.2 miles)
Fibrus Networks
Utility asset works - Verge - Two-way signals
Planned
Scheduled: 23 Sep 2025 - 25 Sep 2025
0.2
Details
Share
Follow
2
Fibrus Networks logo
ROAD LEADING FROM CARDEWLEES SERVICE STATION TO BARRAS BROW 
(0.5 miles)
Fibrus Networks
Utility asset works - Verge - Multi-way signals
Planned
Scheduled: 23 Sep 2025 - 25 Sep 2025
0.5
Details
Share
Follow
3
Fibrus Networks logo
ROAD LEADING FROM NEWBY CROSS TO CARDEWLEES VIA ORTON GRANGE 
(0.6 miles)
Fibrus Networks
Utility asset works - Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 23 Sep 2025 - 25 Sep 2025)
0.6
Details
Share
4
Fibrus Networks logo
NEALHOUSE VILLAGE 
(0.8 miles)
Fibrus Networks
Utility asset works - Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 23 Sep 2025 - 25 Sep 2025)
0.8
Details
Share
5
Fibrus Networks logo
THURSBY TO CARDEWLEES 
(0.8 miles)
Fibrus Networks
Utility asset works - Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 23 Sep 2025 - 25 Sep 2025)
0.8
Details
Share
6
Fibrus Networks logo
NEALHOUSE VILLAGE 
(0.8 miles)
Fibrus Networks
Utility asset works - Verge - No carriageway incursion
Cancelled
(Scheduled: 23 Sep 2025 - 25 Sep 2025)
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.