ROADWORKS SUMMARY
Corby Hill, CARLISLE, CA4 8QB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for CA4 8QB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Corby Hill, CARLISLE, CA4 8QB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cumwhinton Drive

Cumberland Council are carrying out Highway repair and maintenance works on Cumwhinton Drive, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 09:00 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 13 Jan 2025 at 13:53.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Tree Road

Cumberland Council are proposing to carry out Highway improvement works on Tree Road, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 11 Sep 2024 at 14:15.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Tree Road

Cumberland Council are carrying out Highway improvement works on Tree Road, Brampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 10:00 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 13 Jan 2025 at 10:28.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Tree Road

Cumberland Council are proposing to carry out Highway improvement works on Tree Road, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Sep 2024 at 13:45.

Cumberland Council logo
Between
14 and 31 Jan 2025
Details
View Map
Share
Follow
Road Leading From Broomfallen Road To Cumwhinton

Cumberland Council are proposing to carry out Works for road purposes on Road Leading From Broomfallen Road To Cumwhinton, Cumwhinton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Jan 2025 at 15:26.

Cumberland Council logo
Between
14 and 31 Jan 2025
Details
View Map
Share
Road Leading From Broomfallen Road To Cumwhinton

Cumberland Council carried out Works for road purposes on Road Leading From Broomfallen Road To Cumwhinton, Cumwhinton.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 14 Jan 2025 and 31 Jan 2025 and were actually completed between 14 Jan 2025 (08:30) and 21 Jan 2025 (11:00). The works impacted the carriageway only.

This roadwork event was last updated by Cumberland Council on 21 Jan 2025 at 14:31.

Fibrus Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Road Leading From End Rectory Road To Carrick Fell Junction

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From End Rectory Road To Carrick Fell Junction, Heads Nook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 6 Sep 2024 at 12:37.

Fibrus Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Road Leading From End Rectory Road To Carrick Fell Junction

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From End Rectory Road To Carrick Fell Junction, Heads Nook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 6 Jan 2025 at 10:37.

Electricity North West (NorWeb) logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Montgomery Way

Electricity North West (NorWeb) are proposing to carry out New service connection on Montgomery Way, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Dec 2024 at 09:32.

Fibrus Networks logo
Between
7 and 9 Feb 2025
Details
View Map
Share
Follow
Road Leading From Corry House Junction South To Fenton Lane End Via Fenton

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Corry House Junction South To Fenton Lane End Via Fenton, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Jan 2025 at 11:45.

Fibrus Networks logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
From The C1024 To The C1034 Via Faugh

Fibrus Networks are proposing to carry out Utility asset works on From The C1024 To The C1034 Via Faugh, Heads Nook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Jan 2025 at 09:29.

Fibrus Networks logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Jan 2025 at 09:29.

Cumberland Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Beverley Rise

Cumberland Council are proposing to carry out Highway improvement works on Beverley Rise, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 22 Nov 2024 at 10:48.

Cumberland Council logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Front Street

Cumberland Council are proposing to carry out Highway repair and maintenance works on Front Street, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 13 Nov 2024 at 11:14.

Cumberland Council logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Front Street

Cumberland Council were proposing to carry out Highway repair and maintenance works on Front Street, Brampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 9 Dec 2024 at 08:43.

Network Rail logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Oct 2024 at 09:22.

Network Rail logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 31 Jul 2024 at 16:25.

Network Rail logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 10:05.

Network Rail logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jan 2025 at 13:37.

Cumberland Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Road Leading From Scaleby Moss Junction To Longpark Via Burnhill

Cumberland Council were proposing to carry out Highway repair and maintenance works on Road Leading From Scaleby Moss Junction To Longpark Via Burnhill, Scaleby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 17 Jan 2025 at 13:42.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Road Leading To Wrea And Unity Farms From Capon Hill

BT were proposing to carry out Utility repair and maintenance works on Road Leading To Wrea And Unity Farms From Capon Hill, Brampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Dec 2024 at 07:32.

Electricity North West (NorWeb) logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Durranhill Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Durranhill Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Dec 2024 at 11:27.

Cumberland Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Silverdale Road

Cumberland Council are proposing to carry out Highway repair and maintenance works on Silverdale Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 14 Jan 2025 at 12:55.

Cumberland Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Silverdale Road

Cumberland Council are proposing to carry out Highway repair and maintenance works on Silverdale Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 30 Dec 2024 at 10:01.

Hutchinson 3G logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Silverdale Road

Hutchinson 3G were proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 16 Jan 2025 at 09:45.

Electricity North West (NorWeb) logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Montgomery Way

Electricity North West (NorWeb) are proposing to carry out New service connection on Montgomery Way, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Dec 2024 at 11:26.

United Utilities Water (formerly North West Water) logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Paving Brow

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Paving Brow, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Dec 2024 at 14:49.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Irthington To Newtown At Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Irthington To Newtown At Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Jan 2025 at 07:48.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Jan 2025 at 07:49.

BT logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Back Lane

BT are proposing to carry out Utility asset works on Back Lane, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 14 Jan 2025 at 10:27.

United Utilities Water (formerly North West Water) logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Jan 2025 at 14:05.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Road Leading To Wrea And Unity Farms From Capon Hill

BT are proposing to carry out Utility repair and maintenance works on Road Leading To Wrea And Unity Farms From Capon Hill, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 16 Jan 2025 at 09:45.

Northern Gas Networks logo
LONG TERM
Between
7 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Newby East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newby East, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 10:22.

Network Rail logo
Between
13 and 15 Apr 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Network Rail are proposing to carry out Works for Rail Purposes on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Jan 2025 at 14:10.

Network Rail logo
Between
13 and 15 Apr 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Network Rail are proposing to carry out Works for Rail Purposes on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Dec 2024 at 08:03.

United Utilities Water (formerly North West Water) logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jan 2025 at 09:19.

Hutchinson 3G logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Silverdale Road

Hutchinson 3G were proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 16 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 17 Jan 2025 at 13:40.

Hutchinson 3G logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Silverdale Road

Hutchinson 3G are proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 17 Jan 2025 at 13:44.

Cumberland Council logo
LONG TERM
Between
15 Apr and 8 Jul 2025
Details
View Map
Share
Follow
Station Road

Cumberland Council are proposing to carry out Highway repair and maintenance works on Station Road, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 21 Jan 2025 at 11:40.

Cumberland Council logo
LONG TERM
Between
15 Apr and 8 Jul 2025
Details
View Map
Share
Follow
Road Leading From Wetheral Pasture To Wetheral

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Wetheral Pasture To Wetheral, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 21 Jan 2025 at 11:40.

United Utilities Water (formerly North West Water) logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jan 2025 at 15:40.


Roadworks Map near to Corby Hill, CARLISLE, CA4 8QB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Jan 2025 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Corby Hill, CARLISLE, CA4 8QB (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
URGENT
  
HURLEY ROAD 
(0.8 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 20 Jan 2025 13:00
(Scheduled: 20 Jan 2025 - 22 Jan 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.