ROADWORKS SUMMARY
The Orchard, CARLISLE, CA4 8LS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Orchard, CA4 8LS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Orchard, CARLISLE, CA4 8LS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Orchard are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Between
1 Oct 2023 and 29 May 2025
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 5 Jul 2023 at 08:59.

Cumberland Council logo
LONG TERM
Until
9 May 2025
Details
View Map
Share
Follow
Road Leading From Stoneraise Through Ratten Row

Cumberland Council are carrying out Highway improvement works on Road Leading From Stoneraise Through Ratten Row, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 07:00 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 16:04.

Cumberland Council logo
LONG TERM
Until
4 May 2025
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are carrying out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 07:00 and could run through until 4 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 15 Jan 2025 at 13:09.

Cumberland Council logo
LONG TERM
Between
5 Aug 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 17 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 17 Apr 2024 at 12:04.

Cumberland Council logo
LONG TERM
Between
5 Aug 2024 and 17 Apr 2025
Details
View Map
Share
Castle Street

Cumberland Council were proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 17 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 23 Aug 2024 at 11:30.

Cumberland Council logo
LONG TERM
Between
1 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 26 Feb 2024 at 15:19.

Cumberland Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
English Street

Cumberland Council are carrying out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 11 Dec 2024 at 12:09.

Cumberland Council logo
LONG TERM
Between
22 Oct 2024 and 22 Apr 2025
Details
View Map
Share
The Crescent

Cumberland Council were proposing to carry out Works for road purposes on The Crescent, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 22 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 18 Nov 2024 at 15:13.

Cumberland Council logo
LONG TERM
Between
11 Nov 2024 and 30 May 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 May 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 12:51.

Cumberland Council logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are carrying out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 29 Jan 2025 at 15:38.

Cumberland Council logo
LONG TERM
Between
1 Dec 2024 and 1 Dec 2025
Details
View Map
Share
Follow
Court Square

Cumberland Council are proposing to carry out Highway improvement works on Court Square, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 21 Oct 2024 at 15:21.

Cumberland Council logo
LONG TERM
Until
1 Dec 2025
Details
View Map
Share
Follow
Court Square

Cumberland Council are carrying out Highway improvement works on Court Square, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 07:00 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 2 Dec 2024 at 09:56.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 09:52.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 22 Nov 2024 at 13:07.

Cumberland Council logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Court Square Brow

Cumberland Council are proposing to carry out Highway improvement works on Court Square Brow, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 15:28.

Cumberland Council logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 15:22.

Cumberland Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 2 May 2024 at 15:50.

Cumberland Council logo
LONG TERM
Between
6 Jan and 27 Apr 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 9 Oct 2024 at 17:14.

Cumberland Council logo
LONG TERM
Until
27 Apr 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are carrying out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Jan 2025 at 12:25.

Cumberland Council logo
LONG TERM
Between
6 Jan and 27 Apr 2025
Details
View Map
Share
English Street

Cumberland Council were proposing to carry out Highway improvement works on English Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 23 Jan 2025 at 14:57.

Cumberland Council logo
LONG TERM
Between
12 Jan and 11 May 2025
Details
View Map
Share
The Crescent

Cumberland Council were proposing to carry out Works for road purposes on The Crescent, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 11 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 18 Nov 2024 at 15:26.

Cumberland Council logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Newbiggin Road

Cumberland Council are proposing to carry out Highway improvement works on Newbiggin Road, Durdar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 15:38.

Cumberland Council logo
Until
9 Feb 2025
Details
View Map
Share
Follow
Newbiggin Road

Cumberland Council are carrying out Highway improvement works on Newbiggin Road, Durdar.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 08:00 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 13 Jan 2025 at 09:14.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Scalegate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scalegate Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 12:17.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Scalegate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scalegate Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 14:31.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Ridley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridley Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 12:18.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Ridley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridley Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 14:31.

Cumberland Council logo
LONG TERM
Between
13 Jan and 4 May 2025
Details
View Map
Share
Follow
The Crescent

Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 21 Nov 2024 at 12:42.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road Leading From Broomfallen Road To Cumwhinton

Cumberland Council are proposing to carry out Works for road purposes on Road Leading From Broomfallen Road To Cumwhinton, Cumwhinton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Jan 2025 at 15:26.

Cumberland Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are proposing to carry out Works for road purposes on Devonshire Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 30 January 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cumberland Council on 14 Nov 2024 at 08:31.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are proposing to carry out Highway improvement works on Devonshire Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cumberland Council on 19 Nov 2024 at 16:16.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are proposing to carry out Highway improvement works on Devonshire Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cumberland Council on 8 Jan 2025 at 13:59.

Northern Gas Networks logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Scalegate Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Scalegate Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:00 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Jan 2025 at 08:54.

Northern Gas Networks logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Ridley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Ridley Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:00 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Jan 2025 at 08:56.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Bridge Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bridge Street, Carlisle.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 11:03.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bridge Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 15:43.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bridge Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 10:39.

Northern Gas Networks logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Bridge Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Bridge Street, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 08:01.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Annetwell Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Annetwell Street, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 07:45.

Northern Gas Networks logo
LONG TERM
Until
5 Mar 2025
Details
View Map
Share
Follow
Annetwell Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Annetwell Street, Carlisle.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 08:00 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 08:03.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Devonshire Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Devonshire Walk, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 14:23.

Northern Gas Networks logo
LONG TERM
Until
5 Mar 2025
Details
View Map
Share
Follow
Devonshire Walk

Northern Gas Networks are carrying out Utility repair and maintenance works on Devonshire Walk, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 08:00 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 08:02.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Castle Way

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Castle Way, Carlisle.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 11:41.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Castle Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 13:45.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Castle Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Oct 2024 at 09:30.

Northern Gas Networks logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Castle Way

Northern Gas Networks are carrying out Utility repair and maintenance works on Castle Way, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 08:00.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
South Henry Street

BT are proposing to carry out Utility asset works on South Henry Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Dec 2024 at 09:47.

Electricity North West (NorWeb) logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Montgomery Way

Electricity North West (NorWeb) are proposing to carry out New service connection on Montgomery Way, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Dec 2024 at 09:32.

Netomnia logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Place

Netomnia are carrying out Remedial works on Victoria Place, Carlisle.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 January 2025 at 09:15 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Netomnia on 29 Jan 2025 at 10:39.

Electricity North West (NorWeb) logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Oct 2024 at 08:31.

Electricity North West (NorWeb) logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 10:56.

Fibrus Networks logo
Between
7 and 9 Feb 2025
Details
View Map
Share
Follow
Road Leading From Corry House Junction South To Fenton Lane End Via Fenton

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Corry House Junction South To Fenton Lane End Via Fenton, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Jan 2025 at 11:45.

Fibrus Networks logo
Between
7 and 9 Feb 2025
Details
View Map
Share
Follow
Road Leading From Corry House Junction South To Fenton Lane End Via Fenton

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Corry House Junction South To Fenton Lane End Via Fenton, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 23 Jan 2025 at 14:01.

Cumberland Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Road Leading From Brisco To Wreay

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 30 Oct 2024 at 09:45.

Cumberland Council logo
LONG TERM
Between
10 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 27 Jan 2025 at 11:36.

Cumberland Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Beverley Rise

Cumberland Council are proposing to carry out Highway improvement works on Beverley Rise, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 22 Nov 2024 at 10:48.

Cumberland Council logo
LONG TERM
Between
10 Feb and 21 Apr 2025
Details
View Map
Share
Follow
The Crescent

Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 16:07.

Cumberland Council logo
LONG TERM
Between
10 Feb and 21 Apr 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 16:04.

Fibrus Networks logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
From The C1024 To The C1034 Via Faugh

Fibrus Networks are proposing to carry out Utility asset works on From The C1024 To The C1034 Via Faugh, Heads Nook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Jan 2025 at 09:29.

Fibrus Networks logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
From The C1024 To The C1034 Via Faugh

Fibrus Networks are proposing to carry out Utility asset works on From The C1024 To The C1034 Via Faugh, Heads Nook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 27 Jan 2025 at 13:18.

Cumberland Council logo
LONG TERM
Between
10 Feb and 21 Apr 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 15:43.

Fibrus Networks logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Jan 2025 at 09:29.

Fibrus Networks logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 27 Jan 2025 at 13:19.

Cumberland Council logo
LONG TERM
Between
13 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 27 Jan 2025 at 13:05.

Electricity North West (NorWeb) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Devonshire Walk

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Devonshire Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 11:07.

Cumberland Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Beverley Rise

Cumberland Council are proposing to carry out Highway improvement works on Beverley Rise, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 28 Jan 2025 at 14:35.

Northern Gas Networks logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Brook Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Street, Carlisle.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 14:08.

Northern Gas Networks logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Brook Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 09:18.

Northern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Milbourne Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Milbourne Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 08:34.

Electricity North West (NorWeb) logo
Between
25 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Brisco

Electricity North West (NorWeb) are proposing to carry out New service connection on Brisco, Brisco.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 4 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Dec 2024 at 10:01.

Electricity North West (NorWeb) logo
Between
25 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Brisco

Electricity North West (NorWeb) are proposing to carry out New service connection on Brisco, Brisco.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 4 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Jan 2025 at 12:11.

Cumberland Council logo
Between
2 and 7 Mar 2025
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are proposing to carry out Highway improvement works on Devonshire Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 22 Jan 2025 at 12:53.

Northern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Blundell Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blundell Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:53.

Northern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Blundell Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blundell Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 10:49.

Cumberland Council logo
LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Crown Street

Cumberland Council are proposing to carry out Highway repair and maintenance works on Crown Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 20 Dec 2024 at 15:25.

Electricity North West (NorWeb) logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Viaduct Estate Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 07:42.

Electricity North West (NorWeb) logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 10:46.

Electricity North West (NorWeb) logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Jan 2025 at 12:27.

Electricity North West (NorWeb) logo
LONG TERM
Between
5 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 08:10.

Hutchinson 3G logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Silverdale Road

Hutchinson 3G were proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 16 Jan 2025 at 09:45.

Cumberland Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Silverdale Road

Cumberland Council are proposing to carry out Highway repair and maintenance works on Silverdale Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 30 Dec 2024 at 10:01.

Cumberland Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Silverdale Road

Cumberland Council were proposing to carry out Highway repair and maintenance works on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cumberland Council on 28 Jan 2025 at 09:18.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
St Cuthberts Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Cuthberts Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 09:10.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
London Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 13:30.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Alexander Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 09:13.

Electricity North West (NorWeb) logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Durranhill Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Durranhill Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Dec 2024 at 11:27.

Electricity North West (NorWeb) logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Montgomery Way

Electricity North West (NorWeb) are proposing to carry out New service connection on Montgomery Way, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Dec 2024 at 11:26.

Electricity North West (NorWeb) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Devonshire Walk

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Devonshire Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 10:51.

Electricity North West (NorWeb) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Devonshire Walk

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Devonshire Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Jan 2025 at 11:58.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Jan 2025 at 07:49.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Junction North Of Irthing Mill To Lane End Farm Via Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 09:18.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Irthington To Newtown At Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Irthington To Newtown At Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Jan 2025 at 07:48.

United Utilities Water (formerly North West Water) logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Road Leading From Irthington To Newtown At Irthington

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Road Leading From Irthington To Newtown At Irthington, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 09:16.

BT logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
South Henry Street

BT are proposing to carry out Utility asset works on South Henry Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Jan 2025 at 14:11.

BT logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
South Henry Street

BT are proposing to carry out Utility asset works on South Henry Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Jan 2025 at 07:53.

United Utilities Water (formerly North West Water) logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Jan 2025 at 14:05.

Electricity North West (NorWeb) logo
LONG TERM
Between
5 Apr and 18 May 2025
Details
View Map
Share
Viaduct Estate Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 13:37.

Electricity North West (NorWeb) logo
LONG TERM
Between
5 Apr and 18 May 2025
Details
View Map
Share
Viaduct Estate Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 13:38.

Electricity North West (NorWeb) logo
LONG TERM
Between
5 Apr and 18 May 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:40.

Electricity North West (NorWeb) logo
LONG TERM
Between
5 Apr and 18 May 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Dec 2024 at 09:11.

Cumberland Council logo
LONG TERM
Between
7 Apr and 15 Jun 2025
Details
View Map
Share
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 15 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 10 Dec 2024 at 11:55.

Cumberland Council logo
LONG TERM
Between
7 Apr and 15 Jun 2025
Details
View Map
Share
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 15 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 15 Jan 2025 at 12:46.

Northern Gas Networks logo
LONG TERM
Between
7 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Newby East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newby East, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 10:22.

Network Rail logo
Between
13 and 15 Apr 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Network Rail are proposing to carry out Works for Rail Purposes on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Dec 2024 at 08:03.

Network Rail logo
Between
13 and 15 Apr 2025
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Network Rail are proposing to carry out Works for Rail Purposes on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Jan 2025 at 14:10.

United Utilities Water (formerly North West Water) logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jan 2025 at 09:19.

Hutchinson 3G logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Silverdale Road

Hutchinson 3G were proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 16 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 17 Jan 2025 at 13:40.

Hutchinson 3G logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Silverdale Road

Hutchinson 3G are proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 17 Jan 2025 at 13:44.

Cumberland Council logo
LONG TERM
Between
15 Apr and 8 Jul 2025
Details
View Map
Share
Road Leading From Wetheral Pasture To Wetheral

Cumberland Council were proposing to carry out Highway repair and maintenance works on Road Leading From Wetheral Pasture To Wetheral, Wetheral.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 8 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 28 Jan 2025 at 18:48.

Cumberland Council logo
LONG TERM
Between
15 Apr and 8 Jul 2025
Details
View Map
Share
Station Road

Cumberland Council were proposing to carry out Highway repair and maintenance works on Station Road, Cumwhinton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 8 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 28 Jan 2025 at 18:48.

United Utilities Water (formerly North West Water) logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jan 2025 at 15:40.

Northern Gas Networks logo
LONG TERM
Between
21 Apr and 18 Jul 2025
Details
View Map
Share
Newby East

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Newby East, Wetheral.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 18 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Jan 2025 at 08:25.

Fibrus Networks logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
Steeles Bank

Fibrus Networks are proposing to carry out Utility asset works on Steeles Bank, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 28 Jan 2025 at 08:10.

Fibrus Networks logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
From Junction 43 On The M6 To Warwick On Eden On The A69t Via Wetheral

Fibrus Networks are proposing to carry out Utility asset works on From Junction 43 On The M6 To Warwick On Eden On The A69t Via Wetheral, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 28 Jan 2025 at 08:04.

United Utilities Water (formerly North West Water) logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Jan 2025 at 08:48.


Roadworks Map near to The Orchard, CARLISLE, CA4 8LS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 29 Jan 2025 22:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Orchard, CARLISLE, CA4 8LS (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cumberland Council logo
MAJOR
  
ROAD LEADING FROM CROSSROADS IN GREAT CORBY NORTH EAST TO JUNCTION AT GREAT CORBY SCHOOL 
(0.0 miles)
Cumberland Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 28 Oct 2024 - 28 Feb 2025
0.0
Details
Share
Follow
2
Cumberland Council logo
MAJOR
  
ROAD LEADING FROM CROSSROADS IN GREAT CORBY NORTH EAST TO JUNCTION AT GREAT CORBY SCHOOL 
(0.0 miles)
Cumberland Council
Highway repair and maintenance works - Carriageway - Give and take
In Progress
Since: 28 Oct 2024 09:00
(Scheduled: 28 Oct 2024 - 28 Feb 2025)
0.0
Details
Share
Follow
3
United Utilities Water (formerly North West Water) logo
URGENT
  
GREAT CORBY 
(0.2 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Two-way signals
Complete
25 Jan 2025 20:43 - 28 Jan 2025 18:25
0.2
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.