ROADWORKS SUMMARY
Bramley Close, BRISTOL, BS49 4JY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bramley Close, BS49 4JY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bramley Close, BRISTOL, BS49 4JY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bramley Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Somerset Council logo
LONG TERM
Between
19 Feb 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Summer Lane

North Somerset Council are proposing to carry out Highway improvement works on Summer Lane, Banwell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 9 December 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:59.

North Somerset Council logo
LONG TERM
Between
19 Feb 2024 and 19 Aug 2025
Details
View Map
Share
Follow
Wolvershill Road

North Somerset Council are proposing to carry out Highway improvement works on Wolvershill Road, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 19 August 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 30 Jan 2024 at 10:50.

North Somerset Council logo
LONG TERM
Between
19 Feb 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Knightcott Road

North Somerset Council are proposing to carry out Highway improvement works on Knightcott Road, Banwell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 9 December 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:59.

North Somerset Council logo
LONG TERM
Between
19 Feb 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Locking Moor Road

North Somerset Council are proposing to carry out Highway improvement works on Locking Moor Road, Weston-super-mare.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 9 December 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:59.

North Somerset Council logo
LONG TERM
Between
19 Feb 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Knightcott

North Somerset Council are proposing to carry out Highway improvement works on Knightcott, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 9 December 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:58.

North Somerset Council logo
LONG TERM
Between
19 Feb 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Well Lane

North Somerset Council are proposing to carry out Highway improvement works on Well Lane, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 9 December 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:58.

North Somerset Council logo
LONG TERM
Between
1 Apr 2024 and 19 Dec 2026
Details
View Map
Share
Follow
East Street

North Somerset Council are proposing to carry out Highway improvement works on East Street, Banwell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 19 December 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:56.

North Somerset Council logo
LONG TERM
Between
2 Apr 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Riverside

North Somerset Council are proposing to carry out Highway improvement works on Riverside, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 9 December 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 10:05.

North Somerset Council logo
LONG TERM
Between
2 Apr 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Moor Road

North Somerset Council are proposing to carry out Highway improvement works on Moor Road, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 9 December 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 10:05.

North Somerset Council logo
LONG TERM
Between
2 Apr 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Towerhead Road

North Somerset Council are proposing to carry out Highway improvement works on Towerhead Road, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 9 December 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 10:04.

North Somerset Council logo
LONG TERM
Between
2 Apr 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Wolvershill Road

North Somerset Council are proposing to carry out Highway improvement works on Wolvershill Road, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 9 December 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 10:05.

North Somerset Council logo
LONG TERM
Between
2 Apr 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Moor Road

North Somerset Council are proposing to carry out Highway improvement works on Moor Road, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 9 December 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 10:05.

North Somerset Council logo
LONG TERM
Between
9 Apr 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Castle Hill

North Somerset Council are proposing to carry out Highway improvement works on Castle Hill, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 9 December 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 10:05.

North Somerset Council logo
LONG TERM
Between
9 Apr 2024 and 9 Dec 2026
Details
View Map
Share
Follow
Dark Lane

North Somerset Council are proposing to carry out Highway improvement works on Dark Lane, Banwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 9 December 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 10:04.

Western Power Distribution (South West) logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Hill Road

Western Power Distribution (South West) are carrying out New service connection on Hill Road, Sandford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2024 at 09:26 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Nov 2024 at 16:10.

Western Power Distribution (South West) logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
South Croft

Western Power Distribution (South West) are carrying out New service connection on South Croft, Winscombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2024 at 09:25 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Nov 2024 at 16:12.

North Somerset Council logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Knightcott Road

North Somerset Council are carrying out Works for road purposes on Knightcott Road, Banwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 09:30 and could run through until 27 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 2 Oct 2024 at 12:19.

North Somerset Council logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Locking Moor Road

North Somerset Council are carrying out Works for road purposes on Locking Moor Road, Weston-super-mare.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 09:30 and could run through until 27 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 2 Oct 2024 at 12:19.

North Somerset Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Greenhill Road

North Somerset Council are proposing to carry out Highway improvement works on Greenhill Road, Sandford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:59.

North Somerset Council logo
LONG TERM
Between
18 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Moor Road

North Somerset Council are proposing to carry out Highway improvement works on Moor Road, Yatton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 14 Nov 2024 at 15:35.

North Somerset Council logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Moor Road

North Somerset Council are carrying out Highway improvement works on Moor Road, Yatton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 18 Nov 2024 at 09:41.

Western Power Distribution (South West) logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Station Road

Western Power Distribution (South West) are carrying out New service connection on Station Road, Sandford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 December 2024 at 10:10 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 2 Dec 2024 at 08:26.

North Somerset Council logo
LONG TERM
Between
2 Dec 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Sidcot Lane

North Somerset Council are proposing to carry out Highway improvement works on Sidcot Lane, Winscombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:53.

North Somerset Council logo
LONG TERM
Between
2 Dec 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Woodborough Road

North Somerset Council are proposing to carry out Highway improvement works on Woodborough Road, Winscombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:59.

North Somerset Council logo
LONG TERM
Between
16 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Arnolds Way

North Somerset Council are proposing to carry out Section 50 on Arnolds Way, Yatton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 11 Dec 2024 at 17:02.

North Somerset Council logo
LONG TERM
Between
16 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Arnolds Way

North Somerset Council are proposing to carry out Section 50 on Arnolds Way, Yatton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 11 Dec 2024 at 16:39.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Puxton Lane

BT are carrying out Utility asset works on Puxton Lane, Hewish.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:30 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Dec 2024 at 11:11.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Puxton Lane

BT are proposing to carry out Utility asset works on Puxton Lane, Hewish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 26 Jun 2024 at 14:02.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Nye Road

BT are proposing to carry out Utility asset works on Nye Road, Sandford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 26 Jun 2024 at 14:03.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Drove Way

BT are carrying out Utility asset works on Drove Way, Sandford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:30 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Dec 2024 at 11:11.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Drove Way

BT are proposing to carry out Utility asset works on Drove Way, Sandford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 26 Jun 2024 at 14:02.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Nye Road

BT are carrying out Utility asset works on Nye Road, Sandford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:30 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Dec 2024 at 11:11.

North Somerset Council logo
Finishing
Saturday
Details
View Map
Share
North End Road

North Somerset Council were proposing to carry out Highway improvement works on North End Road, Yatton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by North Somerset Council on 29 Nov 2024 at 10:39.

North Somerset Council logo
Finishing
Saturday
Details
View Map
Share
High Street

North Somerset Council were proposing to carry out Highway improvement works on High Street, Yatton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by North Somerset Council on 29 Nov 2024 at 10:39.

North Somerset Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wolvershill Road

North Somerset Council are carrying out Works for road purposes on Wolvershill Road, Banwell.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 20 December 2024 and are due to last for only one day. The works will impact the carriageway and verge.

This roadwork event was last updated by North Somerset Council on 17 Dec 2024 at 16:13.

North Somerset Council logo
LONG TERM
Between
1 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Church Road

North Somerset Council are proposing to carry out Highway improvement works on Church Road, Winscombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:59.

North Somerset Council logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Clevedon Road

North Somerset Council are proposing to carry out Highway repair and maintenance works on Clevedon Road, Nailsea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 21 Nov 2024 at 15:22.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Washing Pound Lane

Virgin Media were proposing to carry out Utility asset works on Washing Pound Lane, Tickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 Sep 2024 at 10:56.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Washing Pound Lane

Virgin Media were proposing to carry out Utility asset works on Washing Pound Lane, Tickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Oct 2024 at 16:22.

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Claverham Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Claverham Road, Claverham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Nov 2024 at 07:42.

North Somerset Council logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Meadway Avenue

North Somerset Council are proposing to carry out Utility asset works on Meadway Avenue, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Somerset Council on 7 Nov 2024 at 15:39.

Bristol Waterworks Company logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Lye Hole Lane

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Lye Hole Lane, Redhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 16 Oct 2024 at 10:41.

Bristol Waterworks Company logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Lye Hole Lane

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Lye Hole Lane, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 23 Oct 2024 at 11:41.

North Somerset Council logo
Between
9 and 30 Jan 2025
Details
View Map
Share
Follow
The Lynch

North Somerset Council are proposing to carry out Highway improvement works on The Lynch, Winscombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:52.

Western Power Distribution (South West) logo
Between
11 and 21 Jan 2025
Details
View Map
Share
Follow
Station Road

Western Power Distribution (South West) are proposing to carry out New service connection on Station Road, St Georges, Weston-super-mare.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 15:51.

Western Power Distribution (South West) logo
Between
11 and 21 Jan 2025
Details
View Map
Share
Follow
Station Road

Western Power Distribution (South West) are proposing to carry out New service connection on Station Road, St Georges, Weston-super-mare.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 16 Oct 2024 at 10:03.

Bristol Waterworks Company logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Moor Road

Bristol Waterworks Company were proposing to carry out New service connection on Moor Road, Yatton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 2 Oct 2024 at 10:12.

Bristol Waterworks Company logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Moor Road

Bristol Waterworks Company were proposing to carry out New service connection on Moor Road, Yatton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 7 Nov 2024 at 15:51.

Bristol Waterworks Company logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Moor Road

Bristol Waterworks Company are proposing to carry out New service connection on Moor Road, Yatton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 9 Oct 2024 at 10:01.

North Somerset Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Clevedon Road

North Somerset Council are proposing to carry out Highway repair and maintenance works on Clevedon Road, Nailsea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 10 Dec 2024 at 16:19.

North Somerset Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Farleigh Road

North Somerset Council are proposing to carry out Section 50 on Farleigh Road, Backwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Somerset Council on 16 Dec 2024 at 11:16.

North Somerset Council logo
Between
22 and 31 Jan 2025
Details
View Map
Share
Follow
Birdcombe Close

North Somerset Council are proposing to carry out Highway repair and maintenance works on Birdcombe Close, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 21 Nov 2024 at 15:20.

North Somerset Council logo
Between
22 and 31 Jan 2025
Details
View Map
Share
Follow
Valley Way Road

North Somerset Council are proposing to carry out Highway repair and maintenance works on Valley Way Road, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 21 Nov 2024 at 15:19.

North Somerset Council logo
Between
29 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Birdcombe Close

North Somerset Council are proposing to carry out Highway repair and maintenance works on Birdcombe Close, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 12 Dec 2024 at 10:57.

North Somerset Council logo
Between
29 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Valley Way Road

North Somerset Council are proposing to carry out Highway repair and maintenance works on Valley Way Road, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 12 Dec 2024 at 14:50.

North Somerset Council logo
Between
1 and 13 Feb 2025
Details
View Map
Share
Follow
Greenfield Crescent

North Somerset Council are proposing to carry out Highway repair and maintenance works on Greenfield Crescent, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 21 Nov 2024 at 15:20.

North Somerset Council logo
LONG TERM
Between
3 Feb and 1 Oct 2025
Details
View Map
Share
Queensway

North Somerset Council were proposing to carry out Highway improvement works on Queensway, Weston-super-mare.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by North Somerset Council on 11 Dec 2024 at 11:06.

North Somerset Council logo
LONG TERM
Between
3 Feb and 1 Oct 2025
Details
View Map
Share
Bristol Road

North Somerset Council were proposing to carry out Highway improvement works on Bristol Road, St Georges, Weston-super-mare.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by North Somerset Council on 11 Dec 2024 at 11:43.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Perrings

Western Power Distribution (South West) are proposing to carry out Utility asset works on The Perrings, Nailsea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Oct 2024 at 11:44.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Perrings

Western Power Distribution (South West) are proposing to carry out Utility asset works on The Perrings, Nailsea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 31 Oct 2024 at 10:45.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Queens Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queens Road, Nailsea.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Oct 2024 at 11:44.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Queens Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queens Road, Nailsea.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 31 Oct 2024 at 10:46.

North Somerset Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Greenfield Crescent

North Somerset Council were proposing to carry out Highway repair and maintenance works on Greenfield Crescent, Nailsea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 12 Dec 2024 at 11:04.

North Somerset Council logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Greenfield Crescent

North Somerset Council were proposing to carry out Highway repair and maintenance works on Greenfield Crescent, Nailsea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 12 Dec 2024 at 10:06.

North Somerset Council logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Greenfield Crescent

North Somerset Council are proposing to carry out Highway repair and maintenance works on Greenfield Crescent, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 12 Dec 2024 at 15:26.

Wessex Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
The Triangle

Wessex Water are proposing to carry out Utility repair and maintenance works on The Triangle, Clevedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 4 Dec 2024 at 09:44.

Western Power Distribution (South West) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
School Road

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on School Road, Wrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (South West) on 26 Nov 2024 at 08:55.

Wessex Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
The Triangle

Wessex Water are proposing to carry out Utility repair and maintenance works on The Triangle, Clevedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Nov 2024 at 16:47.

North Somerset Council logo
LONG TERM
Between
10 Feb and 20 Nov 2025
Details
View Map
Share
Follow
Station Road

North Somerset Council are proposing to carry out Highway improvement works on Station Road, Sandford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Somerset Council on 19 Dec 2023 at 09:49.

Bristol Waterworks Company logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Elm Close

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Elm Close, Yatton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 3 Dec 2024 at 10:35.

Western Power Distribution (South West) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
School Road

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on School Road, Wrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (South West) on 20 Nov 2024 at 09:46.

Western Power Distribution (South West) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Ropers Lane

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Ropers Lane, Wrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 26 Nov 2024 at 10:31.

Western Power Distribution (South West) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Ropers Lane

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Ropers Lane, Wrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 20 Nov 2024 at 09:47.

North Somerset Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
New Road

North Somerset Council are proposing to carry out Highway repair and maintenance works on New Road, Churchill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by North Somerset Council on 17 Dec 2024 at 10:44.

North Somerset Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Elton Road

North Somerset Council are proposing to carry out Highway improvement works on Elton Road, Clevedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Somerset Council on 16 Dec 2024 at 12:26.

North Somerset Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Elton Road

North Somerset Council were proposing to carry out Highway improvement works on Elton Road, Clevedon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by North Somerset Council on 5 Dec 2024 at 09:09.

National Grid Electricity Transmission logo
Between
24 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Hanham Way

National Grid Electricity Transmission are proposing to carry out Permanent reinstatement on Hanham Way, Nailsea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 10 Dec 2024 at 14:28.

Wales And West Utilities logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
High Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on High Street, Yatton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Nov 2024 at 07:44.

North Somerset Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
The Beach

North Somerset Council are proposing to carry out Highway improvement works on The Beach, Clevedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by North Somerset Council on 5 Dec 2024 at 10:36.

Wessex Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Youngwood Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Youngwood Lane, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 3 Dec 2024 at 16:30.

Bristol Waterworks Company logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Kings Road

Bristol Waterworks Company are proposing to carry out New service connection on Kings Road, Wrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 14 Oct 2024 at 11:30.

Bristol Waterworks Company logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Kings Road

Bristol Waterworks Company are proposing to carry out New service connection on Kings Road, Wrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 9 Oct 2024 at 10:09.

Wessex Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Chelvey Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Chelvey Road, Chelvey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 3 Dec 2024 at 16:30.

Wessex Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Youngwood Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Youngwood Lane, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Nov 2024 at 11:28.


Roadworks Map near to Bramley Close, BRISTOL, BS49 4JY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bramley Close, BRISTOL, BS49 4JY (14 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
North Somerset Council logo
MENDIP ROAD 
(0.1 miles)
North Somerset Council
Highway improvement works - Carriageway - Stop/go boards
Cancelled
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.1
Details
Share
2
BT logo
URGENT
  
CHESCOMBE ROAD, NORTH SOMERSET 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
17 Dec 2024 08:00 - 09:30
0.2
Details
Share
3
North Somerset Council logo
MAJOR
  
HIGH STREET 
(0.4 miles)
North Somerset Council
Highway improvement works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 18 Dec 2024 - 21 Dec 2024)
0.4
Details
Share
4
North Somerset Council logo
STOWEY ROAD 
(0.5 miles)
North Somerset Council
Highway improvement works - Footway, Carriageway, Verge - Stop/go boards
Cancelled
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.5
Details
Share
5
BT logo
STOWEY ROAD 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Dec 2024 - 23 Dec 2024
0.5
Details
Share
Follow
6
North Somerset Council logo
SMALLWAY 
(0.6 miles)
North Somerset Council
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 18 Dec 2024 - 19 Dec 2024
0.6
Details
Share
Follow
7
North Somerset Council logo
KENN MOOR ROAD 
(0.8 miles)
North Somerset Council
Highway improvement works - Footway - No carriageway incursion
Cancelled
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.8
Details
Share
8
North Somerset Council logo
MAJOR
  
MOOR ROAD 
(0.9 miles)
North Somerset Council
Highway improvement works - Footway, Carriageway, Verge - Two-way signals
In Progress
Since: 18 Nov 2024 09:30
(Scheduled: 18 Nov 2024 - 17 Jan 2025)
0.9
Details
Share
Follow
9
North Somerset Council logo
MAJOR
  
MOOR ROAD 
(0.9 miles)
North Somerset Council
Highway improvement works - Footway, Carriageway, Verge - Two-way signals
Planned
Scheduled: 18 Nov 2024 - 17 Jan 2025
0.9
Details
Share
Follow
10
North Somerset Council logo
MAJOR
  
NORTH END ROAD 
(0.9 miles)
North Somerset Council
Highway improvement works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 18 Dec 2024 - 21 Dec 2024)
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.