ROADWORKS SUMMARY
Norton Lane, BRISTOL, BS40 8RX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Norton Lane, BS40 8RX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Norton Lane, BRISTOL, BS40 8RX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Norton Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bristol City Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Hereford Street

Bristol City Council are carrying out Highway improvement works on Hereford Street, Bedminster, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 June 2023 at 09:30 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol City Council on 14 Oct 2024 at 08:09.

Bristol City Council logo
LONG TERM
Between
26 Jun 2023 and 28 Mar 2025
Details
View Map
Share
Follow
Bamfield

Bristol City Council are proposing to carry out Highway improvement works on Bamfield, Hengrove, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2023 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 23 Feb 2023 at 13:17.

Bristol City Council logo
LONG TERM
Between
26 Jun 2023 and 28 Mar 2025
Details
View Map
Share
Follow
Tarnock Avenue

Bristol City Council are proposing to carry out Highway improvement works on Tarnock Avenue, Hengrove, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2023 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 23 Feb 2023 at 13:32.

Bristol City Council logo
LONG TERM
Between
26 Jun 2023 and 28 Mar 2025
Details
View Map
Share
Follow
Creswicke Road

Bristol City Council are proposing to carry out Highway improvement works on Creswicke Road, Knowle, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2023 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 23 Feb 2023 at 13:21.

Bristol City Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Airport Road

Bristol City Council are carrying out Highway improvement works on Airport Road, Hengrove, Bristol.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 09:30 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 12 Dec 2024 at 14:42.

Bristol City Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Filwood Park Lane

Bristol City Council are carrying out Highway improvement works on Filwood Park Lane, Knowle, Bristol.

These works are categorised as Major.

The works started on 31 July 2023 at 09:30 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 13 Dec 2024 at 16:30.

Bristol City Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Hengrove Way

Bristol City Council are carrying out Highway improvement works on Hengrove Way, Hartcliffe, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 09:30 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 12 Dec 2024 at 14:42.

Bristol City Council logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Clarke Street

Bristol City Council are carrying out Highway improvement works on Clarke Street, Bedminster, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 08:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 22 Oct 2024 at 08:27.

Bristol City Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Bamfield

Bristol City Council are carrying out Highway improvement works on Bamfield, Hengrove, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:30 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 12 Dec 2024 at 14:42.

Bristol City Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Clarke Street

Bristol City Council are carrying out Highway improvement works on Clarke Street, Bedminster, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 16 Dec 2024 at 11:58.

Bath And North East Somerset Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bristol Road, Chew Stoke, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 12:37.

Bristol Waterworks Company logo
Finishing
Wednesday
Details
View Map
Share
Hinton Blewett Road

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Hinton Blewett Road, Stowey, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 3 Oct 2024 at 15:01.

Bristol Waterworks Company logo
Finishing
Wednesday
Details
View Map
Share
Clutton Hill

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Clutton Hill, Clutton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 18 Oct 2024 at 09:54.

Bath And North East Somerset Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bristol Road, Chew Stoke, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 9 Dec 2024 at 09:55.

Bristol Waterworks Company logo
Finishing
Wednesday
Details
View Map
Share
Kingdown Road

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Kingdown Road, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 26 Sep 2024 at 11:34.

Bristol Waterworks Company logo
Finishing
Friday
Details
View Map
Share
Follow
Redlynch Lane

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Redlynch Lane, Chewton Keynsham, Keynsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 3 Jan 2025 at 15:14.

Bristol Waterworks Company logo
Finishing
Friday
Details
View Map
Share
Follow
Redlynch Lane

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Redlynch Lane, Chewton Keynsham, Keynsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 3 Jan 2025 at 08:57.

Wales And West Utilities logo
Between
10 and 23 Jan 2025
Details
View Map
Share
Follow
Goodwin Drive

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Goodwin Drive, Whitchurch, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Dec 2024 at 10:22.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Bath Road

Western Power Distribution (South West) were proposing to carry out Utility asset works on Bath Road, Brislington, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 3 Jan 2025 at 10:51.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Flowers Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on Flowers Hill, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Nov 2024 at 09:15.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Flowers Hill

Western Power Distribution (South West) were proposing to carry out Utility asset works on Flowers Hill, Brislington, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 3 Jan 2025 at 10:50.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bonville Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bonville Road, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Nov 2024 at 09:16.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bonville Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bonville Road, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 3 Jan 2025 at 11:09.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bath Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bath Road, Brislington, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Nov 2024 at 09:17.

Bristol Waterworks Company logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Chew Hill

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Chew Hill, Chew Magna, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 28 Oct 2024 at 09:38.

Bristol Waterworks Company logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Chew Hill

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Chew Hill, Chew Magna, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 23 Oct 2024 at 11:12.

Western Power Distribution (South West) logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Barnstaple Road

Western Power Distribution (South West) were proposing to carry out New service connection on Barnstaple Road, Knowle, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Nov 2024 at 12:43.

Bristol Waterworks Company logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Chew Hill

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Chew Hill, Chew Magna, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 17 Oct 2024 at 15:58.

Wessex Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
The Batch

Wessex Water are proposing to carry out Utility repair and maintenance works on The Batch, Butcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 31 Oct 2024 at 11:20.

Wessex Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Green Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Green Lane, Butcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 31 Oct 2024 at 11:21.

Bristol Waterworks Company logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Clutton Hill

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Clutton Hill, Clutton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 6 Nov 2024 at 14:45.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Glebe Walk

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Glebe Walk, Keynsham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Sep 2024 at 14:09.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Glebe Walk

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Glebe Walk, Keynsham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 13:50.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Glebe Walk

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Glebe Walk, Keynsham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Wales And West Utilities on 13 Sep 2024 at 13:43.

Bristol City Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Gores Marsh Road

Bristol City Council are proposing to carry out Highway improvement works on Gores Marsh Road, Ashton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 3 Sep 2024 at 12:35.

Western Power Distribution (South West) logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Old Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on Old Hill, Winford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Dec 2024 at 12:24.

Western Power Distribution (South West) logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Old Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on Old Hill, Winford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Dec 2024 at 11:22.

Western Power Distribution (South West) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wick Lane

Western Power Distribution (South West) are proposing to carry out New service connection on Wick Lane, Stanton Wick, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 31 Dec 2024 at 13:48.

Western Power Distribution (South West) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Wick Lane

Western Power Distribution (South West) were proposing to carry out New service connection on Wick Lane, Stanton Wick, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Dec 2024 at 08:44.

Western Power Distribution (South West) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Wick Lane

Western Power Distribution (South West) were proposing to carry out New service connection on Wick Lane, Stanton Wick, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 20 Dec 2024 at 12:03.

Wessex Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Broad Walk

Wessex Water are proposing to carry out Utility asset works on Broad Walk, Knowle, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Dec 2024 at 16:02.

Bristol City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Duckmoor Road

Bristol City Council are proposing to carry out Highway improvement works on Duckmoor Road, Ashton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 3 Sep 2024 at 10:47.

Wales And West Utilities logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Cameley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cameley Road, Cameley, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 2 Jan 2025 at 09:51.

Wales And West Utilities logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Cameley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cameley Road, Cameley, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 12:08.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Top Lane

BT are proposing to carry out Utility asset works on Top Lane, Farmborough, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 2 Dec 2024 at 15:46.

Wales And West Utilities logo
Between
11 and 14 Mar 2025
Details
View Map
Share
Follow
Lower Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Road, Hinton Blewett, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 24 Dec 2024 at 10:23.

Wessex Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Bristol Hill

Wessex Water were proposing to carry out Utility repair and maintenance works on Bristol Hill, Brislington, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 9 Dec 2024 at 13:58.

Wessex Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Brislington Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Brislington Hill, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 2 Jan 2025 at 16:40.


Roadworks Map near to Norton Lane, BRISTOL, BS40 8RX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Jan 2025 16:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Norton Lane, BRISTOL, BS40 8RX (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.