ROADWORKS SUMMARY
Badminton Road, BS37 0TE
Introduction

View current and future planned roadworks and road closures for Badminton Road, BS37 0TE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Badminton Road, BS37 0TE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Badminton Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Coalsack Lane, Winterbourne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:05.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Cooks Lane, Coalpit Heath.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Ruffet Road, Winterbourne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.
13 Feb 2024 and 12 Feb 2026
National Highways are proposing to carry out Works for road purposes on Badminton Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2024 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 8 Feb 2024 at 07:22.
12 Feb 2026
National Highways are carrying out Works for road purposes on Badminton Road, Winterbourne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 February 2024 at 00:01 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by National Highways on 25 Feb 2025 at 10:02.
1 Jul 2024 and 12 Dec 2025
National Highways are proposing to carry out Utility asset works on Cuckoo Lane, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 11 Jun 2024 at 06:12.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Nibley Lane, Yate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 12 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:35.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Nibley Lane, Iron Acton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:36.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bromley Heath Roundabout, Downend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:37.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road Avon Ring Road, Hambrook.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:37.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:38.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Wick Wick Roundabout, Downend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:39.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:36.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road, Stoke Gifford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:36.
7 Jan 2025 and 13 Apr 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Nibley Lane, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 April 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 16 Oct 2024 at 07:21.
7 Jan 2025 and 13 Apr 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Nibley Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 16 Oct 2024 at 07:17.
19 Dec 2025
South Gloucestershire Council are carrying out Highway improvement works on Bromley Heath Roundabout, Downend.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:04.
19 Dec 2025
South Gloucestershire Council are carrying out Highway improvement works on Filton Road Avon Ring Road, Hambrook.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:04.
19 Dec 2025
South Gloucestershire Council are carrying out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:05.
19 Dec 2025
South Gloucestershire Council are carrying out Highway improvement works on Wick Wick Roundabout, Downend.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:05.
19 Dec 2025
South Gloucestershire Council are carrying out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:03.
19 Dec 2025
South Gloucestershire Council are carrying out Highway improvement works on Filton Road, Stoke Gifford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:03.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.
14 Nov 2025
South Gloucestershire Council are carrying out Highway improvement works on Baileys Court Road, Bradley Stoke.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Mar 2025 at 07:07.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:12.
14 Nov 2025
South Gloucestershire Council are carrying out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Mar 2025 at 07:07.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:14.
14 Nov 2025
South Gloucestershire Council are carrying out Highway improvement works on Webbs Wood Road, Bradley Stoke.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Mar 2025 at 07:08.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.
14 Nov 2025
South Gloucestershire Council are carrying out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Mar 2025 at 07:08.
26 Sep 2025
South Gloucestershire Council are carrying out Highway improvement works on Wick Wick Roundabout, Downend.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 09:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Apr 2025 at 11:51.
26 Sep 2025
South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Winterbourne.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 09:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Apr 2025 at 11:52.
7 Apr 2025 and 6 Feb 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Winterbourne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 6 February 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 25 Jul 2024 at 15:07.
27 Mar 2026
South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Winterbourne.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:30 and could run through until 27 March 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 08:41.
6 Mar 2026
South Gloucestershire Council are carrying out Highway improvement works on Down Road, Westerleigh.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:30 and could run through until 6 March 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 08:42.
27 Mar 2026
South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:30 and could run through until 27 March 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 08:42.
Friday
South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Downend.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 2 Jun 2025 at 12:44.
Friday
South Gloucestershire Council are carrying out Highway improvement works on Avon Ring Road Badminton Road Roundabout To Westerleigh Road Roundabout, Downend.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 2 Jun 2025 at 12:44.
Friday
South Gloucestershire Council are carrying out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 2 Jun 2025 at 12:45.
17 Jun and 22 Sep 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Downend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 17 Mar 2025 at 12:09.
17 Jun and 22 Sep 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Badminton Road Roundabout To Westerleigh Road Roundabout, Downend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 17 Mar 2025 at 12:10.
17 Jun and 22 Sep 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 17 Mar 2025 at 12:10.
12 Sep 2025
South Gloucestershire Council are carrying out Highway improvement works on Webbs Wood Road, Bradley Stoke.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 2 Sep 2025 at 08:44.
7 Jul and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:19.
14 Jul 2025 and 6 Jun 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Down Road, Westerleigh.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 6 June 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 22 Apr 2025 at 12:12.
19 Dec 2025
South Gloucestershire Council are carrying out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 July 2025 at 09:30 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 Jul 2025 at 11:24.
20 Jul and 25 Sep 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 17 Apr 2025 at 08:41.
20 Jul and 25 Sep 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 17 Apr 2025 at 08:40.
21 Jul 2025 and 8 May 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 8 May 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 25 Jul 2024 at 15:10.
8 May 2026
South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 09:30 and could run through until 8 May 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 Jul 2025 at 15:10.
21 Jul 2025 and 8 May 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Yate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 8 May 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 25 Jul 2024 at 15:10.
8 May 2026
South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Yate.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 09:30 and could run through until 8 May 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 30 Jul 2025 at 15:10.
21 Jul and 4 Oct 2025
National Highways are proposing to carry out Highway repair and maintenance works on Trench Lane, Almondsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 13 May 2025 at 07:13.
4 Oct 2025
National Highways are carrying out Highway repair and maintenance works on Trench Lane, Almondsbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 06:00 and could run through until 4 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 29 Jul 2025 at 08:36.
21 Jul and 29 Sep 2025
National Highways were proposing to carry out Highway improvement works on Trench Lane, Almondsbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 29 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by National Highways on 29 Jul 2025 at 10:33.
Monday
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by South Gloucestershire Council on 15 May 2025 at 07:11.
Friday
BT were proposing to carry out Utility asset works on Cowship Lane, Wickwar.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 5 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 30 Jul 2025 at 14:08.
Friday
BT were proposing to carry out Utility asset works on Cowship Lane, Cromhall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 5 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 30 Jul 2025 at 13:50.
Friday
BT were proposing to carry out Utility asset works on The Downs, Wickwar.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 5 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 30 Jul 2025 at 14:23.
28 Sep 2025
South Gloucestershire Council are carrying out Highway improvement works on M32 J1 Leave Ne, City Of Bristol.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 20:00 and could run through until 28 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2025 at 07:17.
2 and 17 Sep 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Link Road, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 May 2025 at 11:41.
2 and 17 Sep 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Station Road, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 May 2025 at 11:47.
2 and 17 Sep 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Goose Green Way, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 May 2025 at 11:44.
Tuesday
BT are proposing to carry out Utility repair and maintenance works on Highfields Close, Stoke Gifford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 26 Jun 2025 at 10:47.
7 Sep and 30 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 12 Jun 2025 at 14:30.
8 Sep and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Park Lane, Frampton Cotterell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 11 Aug 2025 at 08:35.
15 and 17 Sep 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Old Gloucester Road, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 26 Jun 2025 at 12:08.
15 and 17 Sep 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Old Gloucester Road, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 5 Aug 2025 at 13:49.
19 and 21 Sep 2025
South Gloucestershire Council are proposing to carry out roadworks on Hounds Road, Chipping Sodbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2025 at 09:58.
19 and 21 Sep 2025
South Gloucestershire Council are proposing to carry out roadworks on High Street, Chipping Sodbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2025 at 09:59.
19 and 21 Sep 2025
South Gloucestershire Council are proposing to carry out roadworks on Wickwar Road, Chipping Sodbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2025 at 09:58.
19 and 21 Sep 2025
South Gloucestershire Council are proposing to carry out roadworks on Broad Street, Chipping Sodbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2025 at 09:58.
23 Sep and 30 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 30 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 11 Jun 2025 at 09:37.
26 and 29 Sep 2025
Network Rail are proposing to carry out Works for Rail Purposes on Hall End Lane, Wickwar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Jun 2025 at 09:10.
26 and 29 Sep 2025
Network Rail are proposing to carry out Works for Rail Purposes on Hall End Lane, Wickwar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 3 Jul 2025 at 09:51.
27 Sep and 6 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Limekiln Road, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 11 Apr 2025 at 12:19.
27 Sep and 6 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Limekiln Road, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Jun 2025 at 07:28.
6 Oct and 5 Dec 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Downend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 3 Jul 2025 at 16:20.
6 Oct and 2 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on M32 J1 Leave Ne, City Of Bristol.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 3 Jun 2025 at 13:42.
6 Oct and 2 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on M32 J1 Leave Ne, City Of Bristol.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 4 Jun 2025 at 10:06.
13 and 15 Oct 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Dyers Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 11 Jul 2025 at 10:54.
13 and 15 Oct 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Dyers Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 5 Aug 2025 at 13:58.
14 and 20 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Wapley Road, Codrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2025 at 10:34.
20 Oct 2025 and 30 Jan 2026
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Horse Street, Chipping Sodbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 21 May 2025 at 10:15.
20 Oct 2025 and 30 Jan 2026
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Horse Street, Chipping Sodbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 30 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 18 Jul 2025 at 15:54.
24 Oct 2025 and 26 Jun 2026
South Gloucestershire Council are proposing to carry out Works for road purposes on Bristol Road, Cromhall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 26 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 1 Aug 2025 at 15:54.
27 and 29 Oct 2025
BT are proposing to carry out Utility asset works on Siston Lane, Siston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 30 Jul 2025 at 13:15.
27 and 29 Oct 2025
BT are proposing to carry out Utility asset works on Siston Lane, Siston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 30 Jul 2025 at 15:01.
27 Oct and 7 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bromley Heath Roundabout, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:21.
27 Oct and 7 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:22.
27 Oct and 7 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road Avon Ring Road, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:20.
27 Oct and 7 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 12:38.
27 Oct and 7 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road, Stoke Gifford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:18.
27 Oct and 7 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:18.
27 and 30 Oct 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Hicks Common Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bristol Waterworks Company on 21 Aug 2025 at 12:46.
27 and 30 Oct 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Hicks Common Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bristol Waterworks Company on 1 Sep 2025 at 09:36.
31 Oct and 3 Nov 2025
South Gloucestershire Council are proposing to carry out Works for road purposes on Little Sodbury End Lane, Little Sodbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 11 Aug 2025 at 09:48.
1 Nov 2025 and 15 May 2026
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Greenways Road, Yate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2025 and could run through until 15 May 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 28 Aug 2025 at 08:25.
1 Nov 2025 and 15 May 2026
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Greenways Road, Yate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2025 and could run through until 15 May 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 08:42.
3 and 5 Nov 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Horton Road, Horton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 30 Jul 2025 at 12:57.
3 and 5 Nov 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Horton Road, Horton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 5 Aug 2025 at 14:03.
3 and 13 Nov 2025
BT are proposing to carry out Utility asset works on Cowship Lane, Wickwar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 18 Aug 2025 at 08:12.
3 and 13 Nov 2025
BT are proposing to carry out Utility asset works on Cowship Lane, Cromhall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 18 Aug 2025 at 08:11.
8 Nov 2025 and 21 Jan 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Park Lane, Frampton Cotterell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 21 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 7 Aug 2025 at 19:02.
10 and 12 Nov 2025
BT are proposing to carry out Utility asset works on Dyers Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 7 Aug 2025 at 13:01.
10 and 12 Nov 2025
BT are proposing to carry out Utility asset works on Dyers Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 Aug 2025 at 09:29.
17 Nov 2025 and 27 Nov 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Savages Wood Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:15.
17 Nov 2025 and 27 Nov 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Fiddlers Wood Lane, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:15.
17 Nov 2025 and 27 Nov 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:14.
24 and 26 Nov 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Teewell Avenue, Staple Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bristol Waterworks Company on 22 Aug 2025 at 14:34.
24 Nov 2025 and 4 Feb 2026
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Downend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 4 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 1 Aug 2025 at 10:43.
Roadworks Map near to Badminton Road, BS37 0TE (Loading...)













- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Badminton Road, BS37 0TE (14 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Jul 2025 - 8 May 2026)
(Scheduled: 21 Jul 2025 - 8 May 2026)
(Scheduled: 2 Sep 2025 - 4 Sep 2025)
(Scheduled: 4 Nov 2024 - 12 Feb 2026)
(Scheduled: 4 Nov 2024 - 12 Feb 2026)