ROADWORKS SUMMARY
Beech Close, BRISTOL, BS35 3NH
Introduction
View current and future planned roadworks and road closures for Beech Close, BS35 3NH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Beech Close, BRISTOL, BS35 3NH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Beech Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
20 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Coniston Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 13:54.
20 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Footpaths Network Bradley Road By 30 To Coniston Road By 155, Patchway.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 13 September 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 29 Oct 2024 at 10:21.
20 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Footpaths Bradley Road By 1 To Coniston Road By 153, Patchway.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 13 September 2024 at 14:05 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 29 Oct 2024 at 10:51.
7 Oct 2024 and 7 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 21 Feb 2024 at 15:47.
21 Oct and 13 Dec 2024
South Gloucestershire Council are proposing to carry out Highway repair and maintenance works on Perrinpit Road, Frampton Cotterell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 8 Oct 2024 at 07:12.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:40.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:54.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:30.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 13:24.
1 Nov 2024 and 3 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 9 Aug 2024 at 13:48.
1 Nov 2024 and 3 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 9 Aug 2024 at 13:55.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Nibley Lane, Iron Acton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:36.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Nibley Lane, Yate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 12 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:35.
20 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Bradley Road, Patchway.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 15:01.
Tuesday
South Gloucestershire Council are carrying out Highway improvement works on Washingpool Hill, Rudgeway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:16.
Tuesday
South Gloucestershire Council are carrying out Highway improvement works on Old Church Road, Rudgeway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:16.
Tuesday
South Gloucestershire Council are carrying out Highway improvement works on Fernhill, Almondsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:15.
Tuesday
South Gloucestershire Council are carrying out Highway improvement works on Hortham Lane, Almondsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:15.
Saturday
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Windermere Road, Patchway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 19 Aug 2024 at 14:12.
Friday
Bristol Waterworks Company are carrying out Utility repair and maintenance works on Durban Road, Patchway.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 18:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 22 Nov 2024 at 15:38.
Friday
Bristol Waterworks Company are carrying out Utility repair and maintenance works on Rodway Road, Patchway.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 18:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 21 Nov 2024 at 14:41.
Tuesday
South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Rudgeway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:16.
Tuesday
South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Almondsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:15.
6 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Moor Lane, Tockington.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 12:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 27 Nov 2024 at 11:42.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Hortham Lane, Almondsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:05.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Old Church Road, Rudgeway.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:16.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Almondsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:10.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Rudgeway.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:14.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Washingpool Hill, Rudgeway.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:15.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Fernhill, Almondsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:11.
Today
South Gloucestershire Council are carrying out Highway improvement works on Catherine Hill, Olveston.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 27 November 2024 and are due to last for only one day. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 27 Nov 2024 at 07:04.
27 Dec 2024 and 13 Jan 2025
South Gloucestershire Council are proposing to carry out Section 50 on Bristol Road, Frampton Cotterell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Oct 2024 at 07:55.
30 Dec 2024 and 24 Feb 2025
South Gloucestershire Council are proposing to carry out Highway repair and maintenance works on Perrinpit Road, Frampton Cotterell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 24 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Oct 2024 at 14:53.
2 and 17 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Grovesend Road, Thornbury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 10 Oct 2024 at 09:55.
6 Jan and 9 May 2025
South Gloucestershire Council were proposing to carry out Highway improvement works on Tytherington Road, Thornbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 7 Nov 2024 at 14:39.
6 Jan and 9 May 2025
South Gloucestershire Council were proposing to carry out Highway improvement works on Gloucester Road, Grovesend.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 7 Nov 2024 at 14:38.
6 Jan and 9 May 2025
South Gloucestershire Council were proposing to carry out Highway improvement works on Grovesend Road, Thornbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 7 Nov 2024 at 14:39.
7 Jan 2025 and 13 Apr 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Nibley Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 16 Oct 2024 at 07:17.
7 Jan 2025 and 13 Apr 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Nibley Lane, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 April 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 16 Oct 2024 at 07:21.
15 and 17 Jan 2025
Bristol Waterworks Company are proposing to carry out New service connection on Cooks Close, Bradley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bristol Waterworks Company on 16 Oct 2024 at 13:01.
18 and 21 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Thornbury Road, Alveston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 22 Oct 2024 at 15:05.
18 and 21 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Alveston Hill, Thornbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 22 Oct 2024 at 15:08.
19 and 27 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Chaingate Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Oct 2024 at 15:16.
12 and 14 Feb 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Shepperdine Road, Oldbury On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 13 Nov 2024 at 13:03.
17 Feb and 2 May 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Winterbourne Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:18.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:14.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:12.
17 Feb and 2 May 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:17.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.
24 and 26 Feb 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Dyers Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 18 Nov 2024 at 11:13.
Roadworks Map near to Beech Close, BRISTOL, BS35 3NH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Beech Close, BRISTOL, BS35 3NH (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 27 Nov 2024 - 6 Dec 2024)
(Scheduled: 18 Nov 2024 - 3 Dec 2024)
(Scheduled: 18 Nov 2024 - 3 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.