ROADWORKS SUMMARY
Bolingbroke Way, BRISTOL, BS34 6FE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bolingbroke Way, BS34 6FE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bolingbroke Way, BRISTOL, BS34 6FE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bolingbroke Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

South Gloucestershire Council logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Coalsack Lane

South Gloucestershire Council are carrying out Highway improvement works on Coalsack Lane, Winterbourne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:05.

South Gloucestershire Council logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Cooks Lane

South Gloucestershire Council are carrying out Highway improvement works on Cooks Lane, Coalpit Heath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.

South Gloucestershire Council logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Ruffet Road

South Gloucestershire Council are carrying out Highway improvement works on Ruffet Road, Winterbourne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.

National Highways logo
LONG TERM
Between
13 Feb 2024 and 12 Feb 2026
Details
View Map
Share
Follow
Badminton Road

National Highways are proposing to carry out Works for road purposes on Badminton Road, Winterbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2024 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 8 Feb 2024 at 07:22.

National Highways logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Badminton Road

National Highways are carrying out Works for road purposes on Badminton Road, Winterbourne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 February 2024 at 00:01 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by National Highways on 25 Feb 2025 at 10:02.

National Highways logo
LONG TERM
Between
1 Jul 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Cuckoo Lane

National Highways are proposing to carry out Utility asset works on Cuckoo Lane, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 11 Jun 2024 at 06:12.

Bristol City Council logo
LONG TERM
Between
2 Sep 2024 and 30 Aug 2026
Details
View Map
Share
Follow
Crow Lane

Bristol City Council are proposing to carry out Highway improvement works on Crow Lane, Henbury, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 August 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 3 Jul 2024 at 08:42.

Bristol City Council logo
LONG TERM
Between
2 Sep 2024 and 30 Aug 2026
Details
View Map
Share
Follow
Knole Lane

Bristol City Council are proposing to carry out Highway improvement works on Knole Lane, Brentry, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 August 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 3 Jul 2024 at 08:42.

South Gloucestershire Council logo
LONG TERM
Between
7 Oct 2024 and 7 Oct 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 21 Feb 2024 at 15:46.

South Gloucestershire Council logo
LONG TERM
Between
7 Oct 2024 and 7 Oct 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 21 Feb 2024 at 15:47.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Temple Street

Bristol City Council are proposing to carry out Highway improvement works on Temple Street, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Mitchell Lane

Bristol City Council are proposing to carry out Highway improvement works on Mitchell Lane, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Church Lane

Bristol City Council are proposing to carry out Highway improvement works on Church Lane, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
St Thomas Street East

Bristol City Council are proposing to carry out Highway repair and maintenance works on St Thomas Street East, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:22.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
St Thomas Street

Bristol City Council are proposing to carry out Highway improvement works on St Thomas Street, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Counterslip

Bristol City Council are proposing to carry out Highway improvement works on Counterslip, Redcliff, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:22.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Redcliff Street

Bristol City Council are proposing to carry out Highway improvement works on Redcliff Street, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Victoria Street

Bristol City Council are proposing to carry out Highway improvement works on Victoria Street, Redcliff, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:16.

Bristol City Council logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Queen Charlotte Street

Bristol City Council are carrying out Highway improvement works on Queen Charlotte Street, City Centre, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 22 Jul 2025 at 08:47.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 14:36.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:40.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gipsy Patch Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:30.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 13:24.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:54.

South Gloucestershire Council logo
LONG TERM
Between
1 Nov 2024 and 3 Nov 2025
Details
View Map
Share
Follow
Gipsy Patch Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 9 Aug 2024 at 13:55.

South Gloucestershire Council logo
LONG TERM
Between
1 Nov 2024 and 3 Nov 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 9 Aug 2024 at 13:48.

Bristol City Council logo
LONG TERM
Between
11 Nov 2024 and 31 Dec 2026
Details
View Map
Share
Passage Road

Bristol City Council were proposing to carry out Highway improvement works on Passage Road, Henbury, Bristol.

These works were categorised as Major.

The works were originally planned to start 11 November 2024 and run through until 31 December 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Bristol City Council on 28 Nov 2024 at 11:16.

Bristol City Council logo
LONG TERM
Between
2 Jan 2025 and 31 Dec 2026
Details
View Map
Share
Follow
Brentry Lane

Bristol City Council are proposing to carry out Highway improvement works on Brentry Lane, Brentry, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 December 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 7 Oct 2024 at 11:43.

Bristol City Council logo
LONG TERM
Between
2 Jan 2025 and 31 Dec 2026
Details
View Map
Share
Crow Lane

Bristol City Council were proposing to carry out Highway improvement works on Crow Lane, Henbury, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 December 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 15 Oct 2024 at 15:08.

Bristol City Council logo
LONG TERM
Between
2 Jan 2025 and 31 Dec 2026
Details
View Map
Share
Knole Lane

Bristol City Council were proposing to carry out Highway improvement works on Knole Lane, Brentry, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 December 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 15 Oct 2024 at 15:08.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Bromley Heath Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Bromley Heath Roundabout, Downend.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:37.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Filton Road Avon Ring Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road Avon Ring Road, Hambrook.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:37.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:38.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Wick Wick Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Wick Wick Roundabout, Downend.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:39.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
A4174 M32 Junction 1 Interchange

South Gloucestershire Council are proposing to carry out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:36.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Filton Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road, Stoke Gifford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:36.

Bristol City Council logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Brentry Lane

Bristol City Council are carrying out Highway improvement works on Brentry Lane, Brentry, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol City Council on 6 Jan 2025 at 08:35.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 09:57.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 10:12.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Portway

Bristol City Council are proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 27 Dec 2024 at 11:15.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Roman Way

Bristol City Council are proposing to carry out Highway improvement works on Roman Way, Sea Mills, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 27 Dec 2024 at 11:15.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 10:54.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 10:10.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 10:51.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Riverleaze

Bristol City Council are proposing to carry out Highway improvement works on Riverleaze, Sea Mills, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 27 Dec 2024 at 11:15.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 09:55.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Portway

Bristol City Council are proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 27 Dec 2024 at 11:15.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 10:05.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 10:46.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Dec 2024 at 09:52.

Bristol City Council logo
LONG TERM
Between
13 Jan 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Sylvan Way

Bristol City Council are proposing to carry out Highway improvement works on Sylvan Way, Sea Mills, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 27 Dec 2024 at 11:15.

Bristol City Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Passage Road

Bristol City Council are carrying out Highway improvement works on Passage Road, Henbury, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 09:00 and could run through until 31 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Bristol City Council on 11 Aug 2025 at 08:08.

Bristol City Council logo
LONG TERM
Until
30 Jan 2026
Details
View Map
Share
Follow
Victoria Street

Bristol City Council are carrying out Highway improvement works on Victoria Street, Redcliff, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 08:00 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 14 Jan 2025 at 08:58.

South Gloucestershire Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Bromley Heath Roundabout

South Gloucestershire Council are carrying out Highway improvement works on Bromley Heath Roundabout, Downend.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:04.

South Gloucestershire Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Filton Road Avon Ring Road

South Gloucestershire Council are carrying out Highway improvement works on Filton Road Avon Ring Road, Hambrook.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:04.

South Gloucestershire Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

South Gloucestershire Council are carrying out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:05.

South Gloucestershire Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Wick Wick Roundabout

South Gloucestershire Council are carrying out Highway improvement works on Wick Wick Roundabout, Downend.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:05.

South Gloucestershire Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
A4174 M32 Junction 1 Interchange

South Gloucestershire Council are carrying out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:03.

South Gloucestershire Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Filton Road

South Gloucestershire Council are carrying out Highway improvement works on Filton Road, Stoke Gifford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 20:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 30 May 2025 at 10:03.

Bristol City Council logo
LONG TERM
Until
5 Feb 2026
Details
View Map
Share
Follow
Church Lane

Bristol City Council are carrying out Highway improvement works on Church Lane, Redcliff, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 February 2025 at 09:30 and could run through until 5 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 20 Feb 2025 at 10:32.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 14 Nov 2025
Details
View Map
Share
Follow
Baileys Court Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.

South Gloucestershire Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Baileys Court Road

South Gloucestershire Council are carrying out Highway improvement works on Baileys Court Road, Bradley Stoke.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Mar 2025 at 07:07.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 14 Nov 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:12.

South Gloucestershire Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are carrying out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Mar 2025 at 07:07.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 14 Nov 2025
Details
View Map
Share
Follow
Webbs Wood Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:14.

South Gloucestershire Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Webbs Wood Road

South Gloucestershire Council are carrying out Highway improvement works on Webbs Wood Road, Bradley Stoke.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Mar 2025 at 07:08.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 14 Nov 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.

South Gloucestershire Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are carrying out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Mar 2025 at 07:08.

Bristol City Council logo
LONG TERM
Until
31 Jan 2026
Details
View Map
Share
Follow
Temple Street

Bristol City Council are carrying out Highway improvement works on Temple Street, Redcliff, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 31 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Feb 2025 at 08:31.

South Gloucestershire Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Wick Wick Roundabout

South Gloucestershire Council are carrying out Highway improvement works on Wick Wick Roundabout, Downend.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 09:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Apr 2025 at 11:51.

South Gloucestershire Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Badminton Road

South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Winterbourne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 09:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Apr 2025 at 11:52.

Bristol City Council logo
LONG TERM
Until
30 Jan 2026
Details
View Map
Share
Follow
Mitchell Lane

Bristol City Council are carrying out Highway improvement works on Mitchell Lane, Redcliff, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2025 at 08:30 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 3 Apr 2025 at 08:36.

South Gloucestershire Council logo
LONG TERM
Between
7 Apr 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Badminton Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Winterbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 6 February 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 25 Jul 2024 at 15:07.

South Gloucestershire Council logo
LONG TERM
Between
7 Apr and 14 Nov 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Almondsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 1 Aug 2024 at 09:43.

South Gloucestershire Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Almondsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 08:30.

South Gloucestershire Council logo
LONG TERM
Between
7 Apr and 14 Nov 2025
Details
View Map
Share
Follow
Hortham Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Hortham Lane, Almondsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 13:38.

South Gloucestershire Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Hortham Lane

South Gloucestershire Council are carrying out Highway improvement works on Hortham Lane, Almondsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 10:36.

South Gloucestershire Council logo
LONG TERM
Between
7 Apr and 14 Nov 2025
Details
View Map
Share
Follow
Old Church Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Old Church Road, Rudgeway.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 13:39.

South Gloucestershire Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Old Church Road

South Gloucestershire Council are carrying out Highway improvement works on Old Church Road, Rudgeway.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 10:36.

South Gloucestershire Council logo
LONG TERM
Between
7 Apr and 14 Nov 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Rudgeway.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 13:40.

South Gloucestershire Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Rudgeway.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 10:37.

South Gloucestershire Council logo
LONG TERM
Until
27 Mar 2026
Details
View Map
Share
Follow
Badminton Road

South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Winterbourne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 09:30 and could run through until 27 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 08:41.

South Gloucestershire Council logo
LONG TERM
Until
6 Mar 2026
Details
View Map
Share
Follow
Down Road

South Gloucestershire Council are carrying out Highway improvement works on Down Road, Westerleigh.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 09:30 and could run through until 6 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 08:42.

South Gloucestershire Council logo
LONG TERM
Until
27 Mar 2026
Details
View Map
Share
Follow
Badminton Road

South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Coalpit Heath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 09:30 and could run through until 27 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 08:42.

South Gloucestershire Council logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Old Church Road

South Gloucestershire Council are carrying out Highway improvement works on Old Church Road, Rudgeway.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 April 2025 at 09:30 and could run through until 31 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 May 2025 at 08:37.

South Gloucestershire Council logo
LONG TERM
Until
23 Sep 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 4 Jul 2025 at 13:50.

South Gloucestershire Council logo
LONG TERM
Until
9 Dec 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 4 Jul 2025 at 11:52.

South Gloucestershire Council logo
LONG TERM
Until
9 Dec 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 4 Jul 2025 at 11:46.

South Gloucestershire Council logo
LONG TERM
Between
1 Jun 2025 and 1 Jun 2026
Details
View Map
Share
Gloucester Road North

South Gloucestershire Council were proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 1 June 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 8 May 2025 at 11:41.

South Gloucestershire Council logo
LONG TERM
Between
1 Jun 2025 and 1 Jun 2026
Details
View Map
Share
Gloucester Road North

South Gloucestershire Council were proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 1 June 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 10:30.

South Gloucestershire Council logo
LONG TERM
Between
1 Jun 2025 and 1 Jun 2026
Details
View Map
Share
Gipsy Patch Lane

South Gloucestershire Council were proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 1 June 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 10:31.

South Gloucestershire Council logo
LONG TERM
Between
1 Jun 2025 and 1 Jun 2026
Details
View Map
Share
Gipsy Patch Lane

South Gloucestershire Council were proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 1 June 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 9 May 2025 at 10:29.

South Gloucestershire Council logo
LONG TERM
Between
1 Jun 2025 and 1 Jun 2026
Details
View Map
Share
Gloucester Road

South Gloucestershire Council were proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 1 June 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 8 May 2025 at 11:42.

Bristol City Council logo
LONG TERM
Between
2 Jun and 17 Oct 2025
Details
View Map
Share
Whiteladies Road

Bristol City Council were proposing to carry out Highway improvement works on Whiteladies Road, Clifton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 20 May 2025 at 11:33.

South Gloucestershire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Badminton Road

South Gloucestershire Council are carrying out Highway improvement works on Badminton Road, Downend.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 2 Jun 2025 at 12:44.

South Gloucestershire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Avon Ring Road Badminton Road Roundabout To Westerleigh Road Roundabout

South Gloucestershire Council are carrying out Highway improvement works on Avon Ring Road Badminton Road Roundabout To Westerleigh Road Roundabout, Downend.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 2 Jun 2025 at 12:44.

South Gloucestershire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

South Gloucestershire Council are carrying out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 2 Jun 2025 at 12:45.

Bristol City Council logo
LONG TERM
Until
23 Sep 2025
Details
View Map
Share
Follow
Portway

Bristol City Council are carrying out Highway improvement works on Portway, Shirehampton, Bristol.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 08:00 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 16 Jun 2025 at 08:25.

South Gloucestershire Council logo
LONG TERM
Between
17 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Badminton Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Downend.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 17 Mar 2025 at 12:09.

South Gloucestershire Council logo
LONG TERM
Between
17 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Avon Ring Road Badminton Road Roundabout To Westerleigh Road Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Badminton Road Roundabout To Westerleigh Road Roundabout, Downend.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 17 Mar 2025 at 12:10.

South Gloucestershire Council logo
LONG TERM
Between
17 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 17 Mar 2025 at 12:10.

South Gloucestershire Council logo
LONG TERM
Between
21 Jun 2025 and 21 Feb 2026
Details
View Map
Share
Follow
Old Church Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Old Church Road, Rudgeway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 21 February 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 31 Mar 2025 at 09:56.

South Gloucestershire Council logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Webbs Wood Road

South Gloucestershire Council are carrying out Highway improvement works on Webbs Wood Road, Bradley Stoke.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 2 Sep 2025 at 08:44.

South Gloucestershire Council logo
LONG TERM
Between
7 Jul and 12 Dec 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:19.

Bristol City Council logo
LONG TERM
Between
13 Jul and 30 Sep 2025
Details
View Map
Share
Follow
Snowdon Road

Bristol City Council are proposing to carry out Highway improvement works on Snowdon Road, Fishponds, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 30 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 29 Nov 2024 at 10:09.

Bristol City Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Whiteladies Road

Bristol City Council are carrying out Highway improvement works on Whiteladies Road, Clifton, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 09:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 21 Aug 2025 at 14:53.

Bristol City Council logo
LONG TERM
Between
14 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Whiteladies Road

Bristol City Council are proposing to carry out Highway improvement works on Whiteladies Road, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 20 May 2025 at 20:35.

Wales And West Utilities logo
LONG TERM
Between
14 Jul and 6 Oct 2025
Details
View Map
Share
Follow
Chelsea Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Chelsea Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 10:36.

South Gloucestershire Council logo
LONG TERM
Between
14 Jul 2025 and 6 Jun 2026
Details
View Map
Share
Follow
Down Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Down Road, Westerleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 6 June 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 22 Apr 2025 at 12:12.

Wales And West Utilities logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Wolseley Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Wolseley Road, Bishopston, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 12:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Jul 2025 at 16:16.

South Gloucestershire Council logo
LONG TERM
Between
18 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 12 Aug 2024 at 09:51.

South Gloucestershire Council logo
LONG TERM
Between
18 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 12 Aug 2024 at 09:51.

South Gloucestershire Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are carrying out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2025 at 09:30 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 30 Jul 2025 at 11:24.

South Gloucestershire Council logo
LONG TERM
Between
20 Jul and 25 Sep 2025
Details
View Map
Share
Follow
Baileys Court Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 17 Apr 2025 at 08:41.

South Gloucestershire Council logo
LONG TERM
Between
20 Jul and 25 Sep 2025
Details
View Map
Share
Follow
Webbs Wood Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 17 Apr 2025 at 08:40.

Bristol City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
South Road

Bristol City Council are proposing to carry out Highway improvement works on South Road, Redland, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 30 Jun 2025 at 15:24.

Bristol City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
South Road

Bristol City Council were proposing to carry out Highway improvement works on South Road, Redland, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 8 Jul 2025 at 08:27.

Bristol City Council logo
LONG TERM
Until
13 Sep 2025
Details
View Map
Share
Follow
South Road

Bristol City Council are carrying out Highway improvement works on South Road, Redland, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 09:30 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 20:25.

Bristol City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Redland Road

Bristol City Council were proposing to carry out Highway improvement works on Redland Road, Redland, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 7 Jul 2025 at 08:43.

Bristol City Council logo
LONG TERM
Until
13 Sep 2025
Details
View Map
Share
Follow
Redland Road

Bristol City Council are carrying out Highway improvement works on Redland Road, Redland, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 09:30 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 20:25.

Bristol City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Zetland Road

Bristol City Council are proposing to carry out Highway improvement works on Zetland Road, Redland, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 30 Jun 2025 at 15:24.

Bristol City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Zetland Road

Bristol City Council were proposing to carry out Highway improvement works on Zetland Road, Redland, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 8 Jul 2025 at 08:25.

Bristol City Council logo
LONG TERM
Until
13 Sep 2025
Details
View Map
Share
Follow
Zetland Road

Bristol City Council are carrying out Highway improvement works on Zetland Road, Redland, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 09:30 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 20:25.

Wales And West Utilities logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Hurlingham Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hurlingham Road, Montpelier, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 3 Mar 2025 at 12:20.

Wales And West Utilities logo
LONG TERM
Between
21 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Wolseley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wolseley Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 27 Feb 2025 at 09:50.

Wales And West Utilities logo
LONG TERM
Between
21 Jul and 15 Sep 2025
Details
View Map
Share
Wolseley Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Wolseley Road, Bishopston, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Apr 2025 at 13:40.

Wales And West Utilities logo
LONG TERM
Between
21 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Wolseley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wolseley Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 17 Apr 2025 at 07:48.

Wales And West Utilities logo
LONG TERM
Between
21 Jul and 24 Oct 2025
Details
View Map
Share
Little Stoke Lane

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Little Stoke Lane, Little Stoke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 9 Jun 2025 at 15:07.

National Highways logo
LONG TERM
Between
21 Jul and 4 Oct 2025
Details
View Map
Share
Follow
Trench Lane

National Highways are proposing to carry out Highway repair and maintenance works on Trench Lane, Almondsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 13 May 2025 at 07:13.

National Highways logo
LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Trench Lane

National Highways are carrying out Highway repair and maintenance works on Trench Lane, Almondsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 06:00 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 29 Jul 2025 at 08:36.

National Highways logo
LONG TERM
Between
21 Jul and 29 Sep 2025
Details
View Map
Share
Trench Lane

National Highways were proposing to carry out Highway improvement works on Trench Lane, Almondsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 29 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by National Highways on 29 Jul 2025 at 10:33.

Bristol City Council logo
LONG TERM
Until
18 Dec 2025
Details
View Map
Share
Follow
Portway

Bristol City Council are carrying out Highway improvement works on Portway, Shirehampton, Bristol.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2025 at 08:00 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 22 Jul 2025 at 08:29.

Wales And West Utilities logo
LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Hurlingham Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Hurlingham Road, Montpelier, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 14:50 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 28 Jul 2025 at 14:50.

Bristol City Council logo
LONG TERM
Between
4 Aug and 5 Dec 2025
Details
View Map
Share
Follow
Canons Road

Bristol City Council are proposing to carry out Highway improvement works on Canons Road, City Centre, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 6 Mar 2025 at 13:14.

Bristol City Council logo
LONG TERM
Between
4 Aug and 5 Dec 2025
Details
View Map
Share
Follow
College Green

Bristol City Council are proposing to carry out Highway improvement works on College Green, City Centre, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 20 Feb 2025 at 07:39.

Bristol City Council logo
LONG TERM
Between
4 Aug and 5 Dec 2025
Details
View Map
Share
Follow
St Augustines Parade

Bristol City Council are proposing to carry out Highway improvement works on St Augustines Parade, City Centre, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 6 Mar 2025 at 13:14.

Bristol City Council logo
LONG TERM
Between
4 Aug and 5 Dec 2025
Details
View Map
Share
Follow
St Augustines Parade

Bristol City Council are proposing to carry out Highway improvement works on St Augustines Parade, City Centre, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 6 Mar 2025 at 13:12.

Bristol City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hillside Road

Bristol City Council are proposing to carry out Highway improvement works on Hillside Road, St George, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 4 Jun 2025 at 12:57.

Bristol City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stottbury Road

Bristol City Council are proposing to carry out Highway improvement works on Stottbury Road, Eastville, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 12 Jun 2025 at 12:05.

South Gloucestershire Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 09:30 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 28 Aug 2025 at 13:53.

South Gloucestershire Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 09:30 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 28 Aug 2025 at 13:54.

Bristol City Council logo
LONG TERM
Between
11 Aug and 13 Dec 2025
Details
View Map
Share
College Green

Bristol City Council were proposing to carry out Highway improvement works on College Green, City Centre, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 13 December 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Bristol City Council on 14 Aug 2025 at 11:35.

Bristol City Council logo
LONG TERM
Between
11 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Newgate

Bristol City Council are proposing to carry out Highway improvement works on Newgate, City Centre, Bristol.

These works are categorised as Major.

The works will start on or after 11 August 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 9 Apr 2025 at 08:34.

Wales And West Utilities logo
LONG TERM
Until
22 Sep 2025
Details
View Map
Share
Follow
Elmdale Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Elmdale Road, Clifton, Bristol.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 15:30 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Sep 2025 at 09:07.

South Gloucestershire Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Cecil Road

South Gloucestershire Council are carrying out Highway improvement works on Cecil Road, Kingswood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 19 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 11 Aug 2025 at 09:46.

South Gloucestershire Council logo
LONG TERM
Until
9 Dec 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 11 Aug 2025 at 09:47.

Bristol City Council logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
St Augustines Parade

Bristol City Council are carrying out Highway improvement works on St Augustines Parade, City Centre, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2025 at 08:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 12 Aug 2025 at 08:12.

South Gloucestershire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 15 May 2025 at 07:11.

Bristol City Council logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
College Green

Bristol City Council are carrying out Highway improvement works on College Green, City Centre, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2025 at 08:00 and could run through until 12 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 18 Aug 2025 at 11:27.

Bristol City Council logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Broad Weir

Bristol City Council are proposing to carry out Highway improvement works on Broad Weir, City Centre, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 6 Mar 2025 at 13:25.

Bristol City Council logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Hillside Road

Bristol City Council are carrying out Highway improvement works on Hillside Road, St George, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 18 Aug 2025 at 10:00.

BT logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Church Road

BT are carrying out Utility repair and maintenance works on Church Road, Redfield, Bristol.

These works are categorised as Major.

The works started on 18 August 2025 at 09:51 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2025 at 14:14.

Western Power Distribution (South West) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Richmond Road

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Richmond Road, Montpelier, Bristol.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:15 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Aug 2025 at 11:51.

Wales And West Utilities logo
Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Balmoral Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Balmoral Road, Montpelier, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Mar 2025 at 12:20.

Bristol City Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Stottbury Road

Bristol City Council are carrying out Highway improvement works on Stottbury Road, Eastville, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 18 Aug 2025 at 09:57.

Bristol City Council logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Rousham Road

Bristol City Council were proposing to carry out Highway improvement works on Rousham Road, Eastville, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 25 Jul 2025 at 14:18.

Bristol City Council logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Rousham Road

Bristol City Council are proposing to carry out Highway improvement works on Rousham Road, Eastville, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 25 Jul 2025 at 14:20.

Bristol City Council logo
LONG TERM
Until
23 Sep 2025
Details
View Map
Share
Follow
Rousham Road

Bristol City Council are carrying out Highway improvement works on Rousham Road, Eastville, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 August 2025 at 13:00 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 20 Aug 2025 at 14:13.

Wales And West Utilities logo
LONG TERM
Between
18 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Wyck Beck Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wyck Beck Road, Brentry, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Aug 2025 at 13:05.

Wales And West Utilities logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Wyck Beck Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Wyck Beck Road, Brentry, Bristol.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 09:30 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 18 Aug 2025 at 10:34.

Wales And West Utilities logo
LONG TERM
Between
18 Aug and 3 Nov 2025
Details
View Map
Share
Wyck Beck Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Wyck Beck Road, Brentry, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Aug 2025 at 09:01.

Wales And West Utilities logo
LONG TERM
Between
25 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Bourneville Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bourneville Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Aug 2025 at 11:33.

Wales And West Utilities logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Bourneville Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Bourneville Road, Easton, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 28 Aug 2025 at 09:42.

Wales And West Utilities logo
Finishing
Friday
Details
View Map
Share
Follow
Gloucester Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gloucester Street, Eastville, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Apr 2025 at 16:02.

Wales And West Utilities logo
Finishing
Friday
Details
View Map
Share
Follow
Gloucester Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gloucester Street, Eastville, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 09:18.

Wales And West Utilities logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Passage Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Passage Road, Henbury, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Aug 2025 at 11:33.

Wales And West Utilities logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Access Between Passage Road And Wyck Beck Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Access Between Passage Road And Wyck Beck Road, Henbury, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Aug 2025 at 13:05.

Wales And West Utilities logo
Between
26 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Lansdown Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lansdown Road, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 18 Jul 2025 at 10:44.

Finishing
Today
Details
View Map
Share
Follow
St Michaels Park

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on St Michaels Park, Kingsdown, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 16 Jun 2025 at 08:37.

Bristol Waterworks Company logo
Finishing
Tuesday
Details
View Map
Share
Follow
Gerrish Avenue

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Gerrish Avenue, Redfield, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 22 Aug 2025 at 14:30.

Wales And West Utilities logo
LONG TERM
Between
26 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Kilburn Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Kilburn Street, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 10:38.

Wales And West Utilities logo
LONG TERM
Between
26 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Owen Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Owen Street, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 10:37.

Wales And West Utilities logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Belmont Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belmont Road, Montpelier, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Feb 2025 at 10:15.

Wales And West Utilities logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Belmont Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Belmont Road, Montpelier, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Apr 2025 at 13:46.

Wales And West Utilities logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Belmont Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belmont Road, Montpelier, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 9 May 2025 at 09:19.

Bristol City Council logo
LONG TERM
Until
30 Jan 2026
Details
View Map
Share
Follow
Redcliff Street

Bristol City Council are carrying out Highway improvement works on Redcliff Street, Redcliff, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 2 Sep 2025 at 08:41.

Wales And West Utilities logo
LONG TERM
Until
23 Oct 2025
Details
View Map
Share
Follow
Shadwell Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Shadwell Road, Bishopston, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 09:30 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Sep 2025 at 09:31.

Until
11 Sep 2025
Details
View Map
Share
Follow
Hanover Lane

Western Power Distribution (Telecoms) are carrying out Utility asset works on Hanover Lane, Clifton, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 10:00 and could run through until 11 September 2025. The works will impact the footpath only.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 29 Aug 2025 at 11:39.

Wales And West Utilities logo
LONG TERM
Between
1 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bourneville Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bourneville Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Jun 2025 at 11:48.

Wales And West Utilities logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Balmoral Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Balmoral Road, Montpelier, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Sep 2025 at 09:01.

Wales And West Utilities logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Hazelton Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Hazelton Road, Bishopston, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 14:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Sep 2025 at 15:22.

South Gloucestershire Council logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 13 Mar 2025 at 09:08.

South Gloucestershire Council logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Gloucester Road North

South Gloucestershire Council were proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 9 Jun 2025 at 13:53.

South Gloucestershire Council logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Follow
Northville Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Northville Road, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 13 Mar 2025 at 09:07.

South Gloucestershire Council logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Northville Road

South Gloucestershire Council were proposing to carry out Highway improvement works on Northville Road, Filton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 9 Jun 2025 at 13:53.

South Gloucestershire Council logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Follow
Braemar Avenue

South Gloucestershire Council are proposing to carry out Highway improvement works on Braemar Avenue, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 13 Mar 2025 at 09:08.

South Gloucestershire Council logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Braemar Avenue

South Gloucestershire Council were proposing to carry out Highway improvement works on Braemar Avenue, Filton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 9 Jun 2025 at 13:53.

Wales And West Utilities logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Access Between Passage Road And Wyck Beck Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Access Between Passage Road And Wyck Beck Road, Henbury, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:57 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Sep 2025 at 08:57.

Wales And West Utilities logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Street, Olveston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Jun 2025 at 12:32.

Wales And West Utilities logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Street

Wales And West Utilities are carrying out Utility repair and maintenance works on The Street, Olveston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:23 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Sep 2025 at 10:23.

Bristol City Council logo
LONG TERM
Until
30 Jan 2026
Details
View Map
Share
Follow
St Thomas Street

Bristol City Council are carrying out Highway improvement works on St Thomas Street, Redcliff, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:00 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 2 Sep 2025 at 08:41.

South Gloucestershire Council logo
Until
28 Sep 2025
Details
View Map
Share
Follow
M32 J1 Leave Ne

South Gloucestershire Council are carrying out Highway improvement works on M32 J1 Leave Ne, City Of Bristol.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 20:00 and could run through until 28 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2025 at 07:17.

South Gloucestershire Council logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Cross Hands Road

South Gloucestershire Council are carrying out Highway improvement works on Cross Hands Road, Pilning.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 2 Sep 2025 at 13:25.

South Gloucestershire Council logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Redwick Road

South Gloucestershire Council are carrying out Highway improvement works on Redwick Road, Pilning.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 2 Sep 2025 at 13:25.

South Gloucestershire Council logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Northwick Road

South Gloucestershire Council are carrying out Highway improvement works on Northwick Road, Pilning.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 2 Sep 2025 at 13:24.

Bristol Waterworks Company logo
Finishing
Friday
Details
View Map
Share
Follow
Wallscourt Road

Bristol Waterworks Company are carrying out Utility repair and maintenance works on Wallscourt Road, Filton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 3 Sep 2025 at 09:16.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Highfields Close

BT are proposing to carry out Utility repair and maintenance works on Highfields Close, Stoke Gifford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Jun 2025 at 10:47.

South Gloucestershire Council logo
LONG TERM
Between
7 Sep and 30 Oct 2025
Details
View Map
Share
Follow
Webbs Wood Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 12 Jun 2025 at 14:30.

Bristol City Council logo
LONG TERM
Between
8 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Quay Street

Bristol City Council are proposing to carry out Highway improvement works on Quay Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 5 Jun 2025 at 10:37.

Bristol City Council logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Quay Street

Bristol City Council were proposing to carry out Highway improvement works on Quay Street, City Centre, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 16:09.

Bristol City Council logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Quay Street

Bristol City Council are proposing to carry out Highway improvement works on Quay Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 2 Sep 2025 at 08:08.

Bristol City Council logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Christmas Street

Bristol City Council were proposing to carry out Highway improvement works on Christmas Street, City Centre, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 3 October 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 16:04.

Bristol City Council logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Christmas Street

Bristol City Council are proposing to carry out Highway improvement works on Christmas Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 2 Sep 2025 at 08:08.

Bristol City Council logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Christmas Street

Bristol City Council are proposing to carry out Highway improvement works on Christmas Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 28 May 2025 at 09:24.

Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Bruton Place

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Bruton Place, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 16 Jun 2025 at 08:38.

Bristol City Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Lower Castle Street

Bristol City Council are proposing to carry out Highway improvement works on Lower Castle Street, City Centre, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 21 Jul 2025 at 11:36.

Bristol City Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Lower Castle Street

Bristol City Council are proposing to carry out Highway improvement works on Lower Castle Street, City Centre, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 26 Aug 2025 at 12:43.

Bristol City Council logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
King Street

Bristol City Council were proposing to carry out Highway improvement works on King Street, St George, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 13:55.

Bristol City Council logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
King Street

Bristol City Council are proposing to carry out Highway improvement works on King Street, St George, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol City Council on 2 Sep 2025 at 13:05.

Bristol City Council logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Two Mile Hill Road

Bristol City Council are proposing to carry out Highway improvement works on Two Mile Hill Road, St George, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 13:59.

Bristol City Council logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Kingsway

Bristol City Council are proposing to carry out Highway improvement works on Kingsway, St George, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 14:00.

Bristol City Council logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
New Queen Street

Bristol City Council were proposing to carry out Highway improvement works on New Queen Street, St George, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Sep 2025 at 13:51.

Bristol City Council logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
New Queen Street

Bristol City Council are proposing to carry out Highway improvement works on New Queen Street, St George, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 2 Sep 2025 at 16:00.

South Gloucestershire Council logo
LONG TERM
Between
8 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Park Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Park Lane, Frampton Cotterell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 11 Aug 2025 at 08:35.

Between
11 and 19 Sep 2025
Details
View Map
Share
Follow
Meridian Place

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Meridian Place, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 16 Jun 2025 at 08:38.

Between
11 and 19 Sep 2025
Details
View Map
Share
Follow
Elton Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Elton Road, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 26 Jun 2025 at 07:41.

Wales And West Utilities logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Elton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Elton Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Feb 2025 at 09:50.

Wales And West Utilities logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Logan Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Logan Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Aug 2025 at 14:44.

Bristol Waterworks Company logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Old Gloucester Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Old Gloucester Road, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 26 Jun 2025 at 12:08.

Bristol Waterworks Company logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Old Gloucester Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Old Gloucester Road, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 5 Aug 2025 at 13:49.

Western Power Distribution (South West) logo
Between
17 and 30 Sep 2025
Details
View Map
Share
Follow
Foot And Cyclepath Mod Perimeter

Western Power Distribution (South West) are proposing to carry out Utility asset works on Foot And Cyclepath Mod Perimeter, Stoke Gifford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 17 September 2025 and could run through until 30 September 2025. The works will impact the cycleway and footpath.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Aug 2025 at 08:04.

Wales And West Utilities logo
Between
19 Sep and 3 Oct 2025
Details
View Map
Share
Triangle South

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Triangle South, Clifton, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 18 Jun 2025 at 10:32.

Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Gordon Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Gordon Road, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 16 Jun 2025 at 08:38.

Between
22 and 30 Sep 2025
Details
View Map
Share
Follow
St Michaels Park

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on St Michaels Park, Kingsdown, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 26 Jun 2025 at 07:15.

Between
22 and 30 Sep 2025
Details
View Map
Share
Follow
St Michaels Park

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on St Michaels Park, Kingsdown, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 30 Jun 2025 at 09:35.

South Gloucestershire Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Cecil Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Cecil Road, Kingswood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2025 at 08:08.

South Gloucestershire Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Halls Road

South Gloucestershire Council are proposing to carry out Diversionary works on Halls Road, Kingswood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2025 at 08:07.

Wales And West Utilities logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Johnsons Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Johnsons Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Jun 2025 at 11:48.

Wales And West Utilities logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Johnsons Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Johnsons Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Aug 2025 at 07:57.

Wales And West Utilities logo
Between
22 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Passage Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Passage Road, Henbury, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Aug 2025 at 13:05.

Wales And West Utilities logo
Between
22 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Passage Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Passage Road, Henbury, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 09:26.

South Gloucestershire Council logo
LONG TERM
Between
23 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Baileys Court Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 30 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 11 Jun 2025 at 09:37.

Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Hanover Lane

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Hanover Lane, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the footpath only.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 16 Jun 2025 at 08:38.

Vodafone logo
Between
29 Sep and 28 Oct 2025
Details
View Map
Share
Baldwin Street

Vodafone were proposing to carry out Utility asset works on Baldwin Street, City Centre, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 28 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 3 Sep 2025 at 11:31.

Vodafone logo
Between
29 Sep and 28 Oct 2025
Details
View Map
Share
High Street

Vodafone were proposing to carry out Utility asset works on High Street, City Centre, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 28 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 3 Sep 2025 at 10:48.

Vodafone logo
Between
29 Sep and 28 Oct 2025
Details
View Map
Share
High Street

Vodafone were proposing to carry out Utility asset works on High Street, City Centre, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 28 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 3 Sep 2025 at 11:32.

Vodafone logo
Between
29 Sep and 28 Oct 2025
Details
View Map
Share
Wine Street

Vodafone were proposing to carry out Utility asset works on Wine Street, City Centre, Bristol.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 28 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 3 Sep 2025 at 10:45.

Vodafone logo
Between
29 Sep and 28 Oct 2025
Details
View Map
Share
Wine Street

Vodafone were proposing to carry out Utility asset works on Wine Street, City Centre, Bristol.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 28 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 3 Sep 2025 at 11:32.

Wales And West Utilities logo
LONG TERM
Between
29 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Brigstocke Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Brigstocke Road, St Pauls, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Mar 2025 at 11:29.

Wales And West Utilities logo
LONG TERM
Between
29 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Shadwell Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shadwell Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Feb 2025 at 09:50.

Wales And West Utilities logo
LONG TERM
Between
29 Sep and 21 Nov 2025
Details
View Map
Share
Shadwell Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Shadwell Road, Bishopston, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Apr 2025 at 13:42.

Wales And West Utilities logo
LONG TERM
Between
29 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Shadwell Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shadwell Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Apr 2025 at 07:48.

South Gloucestershire Council logo
LONG TERM
Between
1 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Redwick Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Redwick Road, Pilning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 21 Aug 2025 at 13:33.

Wales And West Utilities logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Belmont Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belmont Road, Montpelier, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Aug 2025 at 13:35.

Wales And West Utilities logo
LONG TERM
Between
6 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Shrubbery Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Downend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Jul 2025 at 16:20.

South Gloucestershire Council logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
M32 J1 Leave Ne

South Gloucestershire Council are proposing to carry out Highway improvement works on M32 J1 Leave Ne, City Of Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 3 Jun 2025 at 13:42.

South Gloucestershire Council logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
M32 J1 Leave Ne

South Gloucestershire Council are proposing to carry out Highway improvement works on M32 J1 Leave Ne, City Of Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 4 Jun 2025 at 10:06.

Wales And West Utilities logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Berkeley Square

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Berkeley Square, Clifton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 Jun 2025 at 09:41.

Wales And West Utilities logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Berkeley Square

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Berkeley Square, Clifton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Jul 2025 at 09:01.

Wales And West Utilities logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Triangle South

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Triangle South, Clifton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 Jun 2025 at 09:41.

Wales And West Utilities logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Queens Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Queens Road, Clifton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Jun 2025 at 07:45.

Wales And West Utilities logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Queens Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Queens Road, Clifton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 Jun 2025 at 09:41.

Wales And West Utilities logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Queens Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Queens Road, Clifton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Jul 2025 at 09:01.

Wales And West Utilities logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Triangle South

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Triangle South, Clifton, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Jul 2025 at 09:01.

Wales And West Utilities logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Elmdale Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Elmdale Road, Clifton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Jun 2025 at 08:42.

Wales And West Utilities logo
LONG TERM
Between
13 Oct 2025 and 7 Jan 2026
Details
View Map
Share
Follow
Chelsea Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Chelsea Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Jun 2025 at 13:05.

South Gloucestershire Council logo
Between
13 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Cross Hands Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Cross Hands Road, Pilning.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 21 Jul 2025 at 15:43.

South Gloucestershire Council logo
Between
13 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Redwick Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Redwick Road, Pilning.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 21 Jul 2025 at 15:46.

South Gloucestershire Council logo
Between
13 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Northwick Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Northwick Road, Pilning.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 21 Jul 2025 at 15:46.

Bristol City Council logo
LONG TERM
Between
15 Oct 2025 and 30 Jan 2026
Details
View Map
Share
Follow
St Thomas Street East

Bristol City Council are proposing to carry out Highway repair and maintenance works on St Thomas Street East, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 16 Dec 2024 at 14:10.

Wales And West Utilities logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Marlborough Hill Place

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Marlborough Hill Place, Kingsdown, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 21 Jul 2025 at 13:50.

Wales And West Utilities logo
LONG TERM
Between
20 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Brigstocke Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Brigstocke Road, St Pauls, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 20 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Apr 2025 at 11:52.

Wales And West Utilities logo
LONG TERM
Between
20 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Brigstocke Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Brigstocke Road, St Pauls, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 20 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Apr 2025 at 13:56.

Wales And West Utilities logo
LONG TERM
Between
20 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Brigstocke Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Brigstocke Road, St Pauls, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 21 May 2025 at 12:03.

Wales And West Utilities logo
LONG TERM
Between
20 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Brigstocke Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Brigstocke Road, St Pauls, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Jun 2025 at 09:42.

Wales And West Utilities logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Elton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Elton Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Aug 2025 at 14:44.

Wales And West Utilities logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Highbury Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Highbury Road, Horfield, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Jul 2025 at 09:43.

Wales And West Utilities logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Highbury Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Highbury Road, Horfield, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 10:55.

Wales And West Utilities logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Southmead Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Southmead Road, Southmead, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Apr 2025 at 14:12.

Wales And West Utilities logo
Between
24 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Gloucester Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gloucester Street, Eastville, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 28 Jul 2025 at 11:29.

Wales And West Utilities logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Midland Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Midland Road, St Philips, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Jun 2025 at 11:24.

Wales And West Utilities logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Midland Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Midland Road, St Philips, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Jun 2025 at 11:28.

Wales And West Utilities logo
LONG TERM
Between
27 Oct 2025 and 16 Jan 2026
Details
View Map
Share
Follow
St Philips Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Philips Road, St Philips, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Jul 2025 at 14:45.

South Gloucestershire Council logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Halls Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Halls Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2025 at 08:05.

South Gloucestershire Council logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Cecil Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Cecil Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2025 at 08:06.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Ashley Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Ashley Road, Montpelier, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Jul 2025 at 18:58.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Ashley Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Ashley Road, Montpelier, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Jul 2025 at 11:43.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Ashley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Ashley Road, Montpelier, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Aug 2025 at 08:24.

South Gloucestershire Council logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Bromley Heath Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Bromley Heath Roundabout, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:21.

South Gloucestershire Council logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:22.

South Gloucestershire Council logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Filton Road Avon Ring Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road Avon Ring Road, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:20.

South Gloucestershire Council logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
A4174 M32 Junction 1 Interchange

South Gloucestershire Council are proposing to carry out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 12:38.

South Gloucestershire Council logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Filton Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road, Stoke Gifford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:18.

South Gloucestershire Council logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
A4174 M32 Junction 1 Interchange

South Gloucestershire Council are proposing to carry out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 10 Jul 2025 at 14:18.

Bristol Waterworks Company logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Hicks Common Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Hicks Common Road, Winterbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 21 Aug 2025 at 12:46.

Bristol Waterworks Company logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Hicks Common Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Hicks Common Road, Winterbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 1 Sep 2025 at 09:36.

Bristol Waterworks Company logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Fairford Crescent

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Fairford Crescent, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 25 Jul 2025 at 12:55.

Bristol Waterworks Company logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Fairford Crescent

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Fairford Crescent, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 30 Jul 2025 at 15:14.

Bristol City Council logo
LONG TERM
Between
3 Nov 2025 and 31 Oct 2026
Details
View Map
Share
Follow
Temple Way

Bristol City Council are proposing to carry out Highway improvement works on Temple Way, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bristol City Council on 4 Mar 2025 at 10:21.

Bristol City Council logo
LONG TERM
Between
3 Nov 2025 and 31 Oct 2026
Details
View Map
Share
Follow
Temple Back

Bristol City Council are proposing to carry out Highway improvement works on Temple Back, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bristol City Council on 5 Mar 2025 at 08:40.

Bristol City Council logo
LONG TERM
Between
3 Nov 2025 and 31 Oct 2026
Details
View Map
Share
Follow
Avon Street

Bristol City Council are proposing to carry out Highway improvement works on Avon Street, St Philips, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bristol City Council on 6 Mar 2025 at 09:09.

Bristol City Council logo
LONG TERM
Between
3 Nov 2025 and 31 Oct 2026
Details
View Map
Share
Follow
Broad Plain

Bristol City Council are proposing to carry out Highway improvement works on Broad Plain, St Philips, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bristol City Council on 6 Mar 2025 at 09:09.

Bristol City Council logo
LONG TERM
Between
3 Nov 2025 and 31 Oct 2026
Details
View Map
Share
Follow
Old Market Street Roundabout

Bristol City Council are proposing to carry out Highway improvement works on Old Market Street Roundabout, St Philips, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bristol City Council on 6 Mar 2025 at 09:07.

Bristol City Council logo
LONG TERM
Between
3 Nov 2025 and 31 Oct 2026
Details
View Map
Share
Follow
Bond Street South

Bristol City Council are proposing to carry out Highway improvement works on Bond Street South, St Pauls, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Bristol City Council on 6 Mar 2025 at 09:07.

Bristol City Council logo
LONG TERM
Between
3 Nov 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Fairfax Street

Bristol City Council are proposing to carry out Highway improvement works on Fairfax Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 5 Jun 2025 at 10:41.

Wales And West Utilities logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Hazelton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hazelton Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Feb 2025 at 09:50.

Wales And West Utilities logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Hill View

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hill View, Henleaze, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Jul 2025 at 09:21.

Wales And West Utilities logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Hill View

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hill View, Henleaze, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Aug 2025 at 09:58.

South Gloucestershire Council logo
LONG TERM
Between
8 Nov 2025 and 21 Jan 2026
Details
View Map
Share
Follow
Park Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Park Lane, Frampton Cotterell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 21 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 7 Aug 2025 at 19:02.

Wales And West Utilities logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Southmead Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Southmead Road, Southmead, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Jan 2025 at 13:20.

Bristol Waterworks Company logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Pretoria Road

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Pretoria Road, Patchway.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 12 Aug 2025 at 13:16.

Bristol Waterworks Company logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Stokemead

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Stokemead, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 7 Aug 2025 at 13:19.

Bristol Waterworks Company logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Stokemead

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Stokemead, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 11 Aug 2025 at 14:44.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 27 Nov 2026
Details
View Map
Share
Follow
Savages Wood Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Savages Wood Road, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:15.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 27 Nov 2026
Details
View Map
Share
Follow
Fiddlers Wood Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Fiddlers Wood Lane, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:15.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 27 Nov 2026
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:14.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 27 Nov 2026
Details
View Map
Share
Follow
Brook Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Brook Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:16.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 27 Nov 2026
Details
View Map
Share
Follow
Pear Tree Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Pear Tree Road, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:17.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 27 Nov 2026
Details
View Map
Share
Follow
Bowsland Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bowsland Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:16.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 27 Nov 2026
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:15.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 5 Jun 2026
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Almondsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 June 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 31 Jul 2024 at 15:03.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 5 Jun 2026
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Almondsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 June 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 13:28.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 26 Mar 2027
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Almondsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 26 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 13:31.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 26 Mar 2027
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Rudgeway.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 26 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 13:30.

South Gloucestershire Council logo
LONG TERM
Between
17 Nov 2025 and 10 Jul 2026
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Rudgeway.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 10 July 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 13:29.

Bristol Waterworks Company logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Wallscourt Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Wallscourt Road, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 19 Aug 2025 at 15:20.

Wales And West Utilities logo
LONG TERM
Between
24 Nov 2025 and 7 Jan 2026
Details
View Map
Share
Follow
West Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on West Street, St Philips, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Jun 2025 at 11:18.

Wales And West Utilities logo
LONG TERM
Between
24 Nov 2025 and 7 Jan 2026
Details
View Map
Share
Follow
West Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on West Street, St Philips, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Jul 2025 at 13:43.

Wales And West Utilities logo
LONG TERM
Between
24 Nov 2025 and 7 Jan 2026
Details
View Map
Share
Follow
West Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on West Street, St Philips, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 11:10.

Wales And West Utilities logo
LONG TERM
Between
24 Nov 2025 and 7 Jan 2026
Details
View Map
Share
West Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on West Street, St Philips, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 7 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 09:06.

Wales And West Utilities logo
LONG TERM
Between
24 Nov 2025 and 7 Jan 2026
Details
View Map
Share
Follow
Kilburn Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Kilburn Street, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Jun 2025 at 13:06.

Wales And West Utilities logo
LONG TERM
Between
24 Nov 2025 and 7 Jan 2026
Details
View Map
Share
Follow
Owen Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Owen Street, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Jun 2025 at 13:07.

Wales And West Utilities logo
LONG TERM
Between
24 Nov 2025 and 7 Jan 2026
Details
View Map
Share
Follow
Lodge Hill

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lodge Hill, Speedwell, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Jun 2025 at 13:54.

Wales And West Utilities logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Logan Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Logan Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Feb 2025 at 09:50.

Bristol Waterworks Company logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Teewell Avenue

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Teewell Avenue, Staple Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 22 Aug 2025 at 14:34.

Wales And West Utilities logo
LONG TERM
Between
24 Nov 2025 and 4 Feb 2026
Details
View Map
Share
Follow
Shrubbery Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Downend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 4 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Aug 2025 at 10:43.

Bristol City Council logo
LONG TERM
Between
26 Nov 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Broadmead

Bristol City Council are proposing to carry out Highway improvement works on Broadmead, City Centre, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 20 Mar 2025 at 12:26.

Bristol City Council logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Portway

Bristol City Council were proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 17 Dec 2024 at 10:02.

Bristol City Council logo
LONG TERM
Between
1 Dec 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Dragons Well Road

Bristol City Council are proposing to carry out Highway improvement works on Dragons Well Road, Henbury, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 2 Dec 2024 at 13:29.

South Gloucestershire Council logo
LONG TERM
Between
1 Dec 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Redwick Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Redwick Road, Pilning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 8 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 20 Aug 2025 at 16:10.


Roadworks Map near to Bolingbroke Way, BRISTOL, BS34 6FE (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bolingbroke Way, BRISTOL, BS34 6FE (38 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 19 May 2025 09:30
(Scheduled: 19 May 2025 - 23 Sep 2025)
0.3
Details
Share
Follow
2
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway, Verge - Lane closure
Cancelled
(Scheduled: 1 Jun 2025 - 1 Jun 2026)
0.3
Details
Share
3
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway, Verge - Lane closure
Planned
Scheduled: 7 Oct 2024 - 7 Oct 2025
0.3
Details
Share
Follow
4
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway - Lane closure
Planned
Scheduled: 31 Oct 2024 - 31 Oct 2025
0.3
Details
Share
Follow
5
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 19 May 2025 09:30
(Scheduled: 19 May 2025 - 23 Sep 2025)
0.3
Details
Share
Follow
6
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 18 Jul 2025 - 12 Sep 2025
0.3
Details
Share
Follow
7
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway - Road closure
In Progress
Since: 4 Aug 2025 09:30
(Scheduled: 4 Aug 2025 - 8 Sep 2025)
0.3
Details
Share
Follow
8
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 1 Jun 2025 - 1 Jun 2026)
0.3
Details
Share
9
South Gloucestershire Council logo
MAJOR
  
GLOUCESTER ROAD NORTH 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 31 Oct 2024 - 31 Oct 2025
0.3
Details
Share
Follow
10
South Gloucestershire Council logo
MAJOR
  
GIPSY PATCH LANE 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway - Lane closure
Planned
Scheduled: 31 Oct 2024 - 31 Oct 2025
0.3
Details
Share