ROADWORKS SUMMARY
Mendip Road, BRISTOL, BS20 6DE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mendip Road, BS20 6DE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Mendip Road, BRISTOL, BS20 6DE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mendip Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bristol City Council logo
LONG TERM
Between
2 Sep 2024 and 11 Apr 2025
Details
View Map
Share
Access To Portway Park And Ride

Bristol City Council were proposing to carry out Highway improvement works on Access To Portway Park And Ride, Shirehampton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol City Council on 3 Oct 2024 at 16:09.

North Somerset Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Pill Road

North Somerset Council are carrying out Section 50 on Pill Road, Abbots Leigh.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by North Somerset Council on 2 Oct 2024 at 14:37.

Wales And West Utilities logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
St Marys Grove

Wales And West Utilities are carrying out Utility repair and maintenance works on St Marys Grove, Nailsea.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 09:00 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Sep 2024 at 10:26.

North Somerset Council logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Wraxall Hill

North Somerset Council were proposing to carry out Highway repair and maintenance works on Wraxall Hill, Wraxall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by North Somerset Council on 8 Oct 2024 at 15:40.

Wales And West Utilities logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Cadbury Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cadbury Road, Portishead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Sep 2024 at 13:03.

Bristol Waterworks Company logo
Finishing
Today
Details
View Map
Share
Follow
Fosse Lane

Bristol Waterworks Company are carrying out Utility repair and maintenance works on Fosse Lane, Nailsea.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 13:40 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 20 Nov 2024 at 11:37.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
The Portbury Hundreds

National Highways are proposing to carry out roadworks on The Portbury Hundreds, Portbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 31 Oct 2024 at 11:12.

Western Power Distribution (South West) logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
The Uplands

Western Power Distribution (South West) were proposing to carry out Utility asset works on The Uplands, Nailsea.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 30 Aug 2024 at 15:16.

Wales And West Utilities logo
LONG TERM
Between
2 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Cadbury Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cadbury Road, Portishead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Sep 2024 at 09:36.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Third Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Third Way, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Nov 2024 at 13:44.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Third Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Third Way, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 10:04.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Dec 2024 and 11 Mar 2025
Details
View Map
Share
Follow
Avonmouth Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Avonmouth Way, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Nov 2024 at 13:44.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Dec 2024 and 11 Mar 2025
Details
View Map
Share
Follow
Avonmouth Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Avonmouth Way, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 10:04.

North Somerset Council logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Clevedon Road

North Somerset Council are proposing to carry out Highway repair and maintenance works on Clevedon Road, Nailsea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 21 Nov 2024 at 15:22.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Washing Pound Lane

Virgin Media were proposing to carry out Utility asset works on Washing Pound Lane, Tickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 Sep 2024 at 10:56.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Washing Pound Lane

Virgin Media were proposing to carry out Utility asset works on Washing Pound Lane, Tickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Oct 2024 at 16:22.

Bristol City Council logo
LONG TERM
Between
6 Jan and 31 Oct 2025
Details
View Map
Share
Follow
Portway

Bristol City Council are proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol City Council on 4 Oct 2024 at 07:26.

North Somerset Council logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Meadway Avenue

North Somerset Council are proposing to carry out Utility asset works on Meadway Avenue, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Somerset Council on 7 Nov 2024 at 15:39.

Bristol Waterworks Company logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Walton Down

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Walton Down, Walton-in-gordano.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 26 Sep 2024 at 11:04.

Bristol Waterworks Company logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Walton Down

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Walton Down, Walton-in-gordano.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 11 Nov 2024 at 09:31.

North Somerset Council logo
Between
22 and 31 Jan 2025
Details
View Map
Share
Follow
Birdcombe Close

North Somerset Council are proposing to carry out Highway repair and maintenance works on Birdcombe Close, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 21 Nov 2024 at 15:20.

North Somerset Council logo
Between
22 and 31 Jan 2025
Details
View Map
Share
Follow
Valley Way Road

North Somerset Council are proposing to carry out Highway repair and maintenance works on Valley Way Road, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 21 Nov 2024 at 15:19.

BT logo
Between
23 and 24 Jan 2025
Details
View Map
Share
Follow
Woodlands Road

BT are proposing to carry out Utility asset works on Woodlands Road, Portishead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Nov 2024 at 16:30.

North Somerset Council logo
Between
1 and 13 Feb 2025
Details
View Map
Share
Follow
Greenfield Crescent

North Somerset Council are proposing to carry out Highway repair and maintenance works on Greenfield Crescent, Nailsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Somerset Council on 21 Nov 2024 at 15:20.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Perrings

Western Power Distribution (South West) are proposing to carry out Utility asset works on The Perrings, Nailsea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 31 Oct 2024 at 10:45.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Queens Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queens Road, Nailsea.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Oct 2024 at 11:44.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Perrings

Western Power Distribution (South West) are proposing to carry out Utility asset works on The Perrings, Nailsea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Oct 2024 at 11:44.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Queens Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queens Road, Nailsea.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 31 Oct 2024 at 10:46.

BT logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Heron Gardens

BT are proposing to carry out Utility asset works on Heron Gardens, Portishead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Nov 2024 at 15:22.

Wessex Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
The Triangle

Wessex Water are proposing to carry out Utility repair and maintenance works on The Triangle, Clevedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Nov 2024 at 16:47.


Roadworks Map near to Mendip Road, BRISTOL, BS20 6DE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mendip Road, BRISTOL, BS20 6DE (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
QUANTOCK ROAD 
(0.1 miles)
BT
Utility repair and maintenance works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.1
Details
Share
Follow
2
Western Power Distribution (South West) logo
URGENT
  
DOWN ROAD 
(0.5 miles)
Western Power Distribution (South West)
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 10 Nov 2024 11:25
(Scheduled: 10 Nov 2024 - 22 Nov 2024)
0.5
Details
Share
Follow
3
Wales And West Utilities logo
MAJOR
  
CADBURY ROAD 
(0.9 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 18 Nov 2024 - 20 Dec 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.