ROADWORKS SUMMARY
BS15 5SN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for BS15 5SN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to BS15 5SN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

South Gloucestershire Council logo
LONG TERM
Until
24 Oct 2024
Details
View Map
Share
Follow
Brook Road

South Gloucestershire Council are carrying out Highway improvement works on Brook Road, Kingswood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2023 at 07:30 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 3 May 2023 at 08:12.

South Gloucestershire Council logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Ruffet Road

South Gloucestershire Council are carrying out Highway improvement works on Ruffet Road, Winterbourne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.

South Gloucestershire Council logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Cooks Lane

South Gloucestershire Council are carrying out Highway improvement works on Cooks Lane, Coalpit Heath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.

South Gloucestershire Council logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Coalsack Lane

South Gloucestershire Council are carrying out Highway improvement works on Coalsack Lane, Winterbourne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:05.

Western Power Distribution (South West) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Henfield Road

Western Power Distribution (South West) are carrying out Utility asset works on Henfield Road, South Gloucestershire, Pucklechurch.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2024 at 07:42 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 5 Feb 2024 at 08:51.

National Highways logo
LONG TERM
Between
13 Feb 2024 and 12 Feb 2026
Details
View Map
Share
Follow
Badminton Road

National Highways are proposing to carry out Works for road purposes on Badminton Road, Winterbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2024 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 8 Feb 2024 at 07:22.

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Tabernacle Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Tabernacle Road, Hanham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 09:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Mar 2024 at 07:23.

Wales And West Utilities logo
LONG TERM
Between
2 Apr and 10 May 2024
Details
View Map
Share
Follow
Footpaths Network Cloverlea Road To Pennine Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Footpaths Network Cloverlea Road To Pennine Road, Oldland Common.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 April 2024 and could run through until 10 May 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Wales And West Utilities on 31 Jan 2024 at 13:27.

South Gloucestershire Council logo
LONG TERM
Until
14 Jul 2024
Details
View Map
Share
Follow
Shortwood Road

South Gloucestershire Council are carrying out Highway improvement works on Shortwood Road, Pucklechurch.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 06:45 and could run through until 14 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 15 Apr 2024 at 07:01.

Wales And West Utilities logo
LONG TERM
Until
11 Jul 2024
Details
View Map
Share
Follow
Orchard Vale

Wales And West Utilities are carrying out Utility repair and maintenance works on Orchard Vale, Kingswood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 April 2024 at 09:30 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Apr 2024 at 11:13.

Wales And West Utilities logo
Finishing
Tuesday
Details
View Map
Share
Follow
Stanley Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Stanley Road, Warmley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 11:55 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Apr 2024 at 14:18.

Wales And West Utilities logo
Between
29 Apr and 17 May 2024
Details
View Map
Share
Follow
Fairview Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Fairview Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Feb 2024 at 11:14.

Wales And West Utilities logo
Between
29 Apr and 17 May 2024
Details
View Map
Share
Follow
Coronation Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coronation Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Feb 2024 at 11:13.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
29 Apr and 15 Jul 2024
Details
View Map
Share
Follow
Footpath Parkwall Road To Stephens Drive

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Footpath Parkwall Road To Stephens Drive, Barrs Court.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 April 2024 and could run through until 15 July 2024. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 25 Apr 2024 at 11:40.

Wessex Water logo
Finishing
Thursday
Details
View Map
Share
Follow
All Saints Road

Wessex Water are proposing to carry out Utility repair and maintenance works on All Saints Road, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 26 Apr 2024 at 06:55.

Bristol Waterworks Company logo
Between
6 and 8 May 2024
Details
View Map
Share
Follow
Dunsdown Lane

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Dunsdown Lane, West Littleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 15 Apr 2024 at 10:01.

Wales And West Utilities logo
LONG TERM
Between
12 May and 7 Jul 2024
Details
View Map
Share
Follow
Shellards Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shellards Road, Longwell Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Apr 2024 at 08:17.

Bath And North East Somerset Council logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
Apsley Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Apsley Road, Newbridge, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 12 Mar 2024 at 16:30.

Western Power Distribution (West Midlands) logo
Between
27 and 31 May 2024
Details
View Map
Share
Follow
Stephens Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stephens Drive, Barrs Court.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Feb 2024 at 08:56.

Bath And North East Somerset Council logo
Between
29 May and 1 Jun 2024
Details
View Map
Share
Follow
Crown Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Crown Road, Upper Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 24 Apr 2024 at 13:56.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Bath Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Bath Road, Bridgeyate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:31.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Shrubbery Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Shrubbery Road, Downend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 25 Apr 2024 at 11:08.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Downend Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Downend Road, Downend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 25 Apr 2024 at 11:07.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Croomes Hill

South Gloucestershire Council are proposing to carry out Highway improvement works on Croomes Hill, Downend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 25 Apr 2024 at 11:07.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Bridge Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Bridge Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:39.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Court Farm Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Court Farm Road, Longwell Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:29.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Forest Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Forest Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:21.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
High Street

South Gloucestershire Council are proposing to carry out Highway improvement works on High Street, Oldland Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:34.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Shortwood Hill

South Gloucestershire Council are proposing to carry out Highway improvement works on Shortwood Hill, Mangotsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:30.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Pomphrey Hill

South Gloucestershire Council are proposing to carry out Highway improvement works on Pomphrey Hill, Mangotsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:31.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Main Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Main Road, Mangotsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:30.

South Gloucestershire Council logo
LONG TERM
Between
2 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Manor Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Manor Road, Mangotsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 16 Apr 2024 at 10:20.

Wessex Water logo
LONG TERM
Between
3 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Long Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Long Road, Mangotsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 26 Mar 2024 at 16:01.

Wessex Water logo
Between
3 and 7 Jun 2024
Details
View Map
Share
Follow
Kingsholme Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Kingsholme Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Feb 2024 at 08:51.

Wessex Water logo
LONG TERM
Between
3 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Valley Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Valley Road, Mangotsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 26 Mar 2024 at 16:02.

Wales And West Utilities logo
LONG TERM
Between
9 Jun and 15 Aug 2024
Details
View Map
Share
Follow
Morley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morley Road, Staple Hill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 15 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Apr 2024 at 07:22.

Western Power Distribution (West Midlands) logo
Between
10 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Westcourt Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Westcourt Drive, Oldland Common.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Jan 2024 at 15:41.

Western Power Distribution (South West) logo
Between
10 and 17 Jun 2024
Details
View Map
Share
Follow
Charlcombe Lane

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Charlcombe Lane, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Mar 2024 at 10:10.

Bristol Waterworks Company logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Coronation Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Coronation Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 14 Mar 2024 at 08:57.

Western Power Distribution (West Midlands) logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Marsham Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Marsham Way, Longwell Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Jan 2024 at 15:27.

Wales And West Utilities logo
Between
23 Jun and 4 Jul 2024
Details
View Map
Share
Follow
Midland Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Midland Road, Staple Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Oct 2023 at 13:31.

Wales And West Utilities logo
Between
23 Jun and 4 Jul 2024
Details
View Map
Share
Follow
Alexandra Gardens

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Alexandra Gardens, Soundwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Oct 2023 at 13:34.

Wales And West Utilities logo
Between
30 Jun and 25 Jul 2024
Details
View Map
Share
Follow
Halls Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Halls Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Apr 2024 at 10:00.

Nexfibre Networks Limited logo
LONG TERM
Between
30 Jun and 30 Sep 2024
Details
View Map
Share
Follow
Camden Terrace

Nexfibre Networks Limited are proposing to carry out Utility asset works on Camden Terrace, Walcot, Bath.

These works are categorised as Major.

The works will start on or after 30 June 2024 and could run through until 30 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Jan 2024 at 15:21.

Bath And North East Somerset Council logo
Between
30 Jun and 19 Jul 2024
Details
View Map
Share
Follow
Lansdown Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lansdown Road, City Centre, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 24 Apr 2024 at 13:56.

South Gloucestershire Council logo
LONG TERM
Between
8 Jul and 30 Aug 2024
Details
View Map
Share
Follow
High Street

South Gloucestershire Council are proposing to carry out Highway improvement works on High Street, Marshfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 20 Feb 2024 at 15:26.

Bristol Waterworks Company logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
Culvers Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Culvers Road, Keynsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 12 Apr 2024 at 07:23.

BT logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Lansdown Road

BT are proposing to carry out Utility asset works on Lansdown Road, Charlcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Apr 2024 at 08:52.

BT logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Bath Road

BT are proposing to carry out Remedial works on Bath Road, Cold Ashton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Apr 2024 at 13:58.

Bath And North East Somerset Council logo
Between
17 and 20 Jul 2024
Details
View Map
Share
Follow
Lansdown Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lansdown Road, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 24 Apr 2024 at 13:57.

BT logo
On
18 Jul 2024
Details
View Map
Share
Follow
Fonthill Road

BT are proposing to carry out Utility asset works on Fonthill Road, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 18 July 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Apr 2024 at 13:34.

Bath And North East Somerset Council logo
Between
22 and 26 Jul 2024
Details
View Map
Share
Follow
High Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on High Street, Upper Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 21 Feb 2024 at 08:31.

Wales And West Utilities logo
LONG TERM
Between
23 Jul and 29 Aug 2024
Details
View Map
Share
Follow
Bristol Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bristol Road, Corston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 18 Apr 2024 at 14:47.


Roadworks Map near to BS15 5SN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Apr 2024 20:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to BS15 5SN (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.