ROADWORKS SUMMARY
Crawfords, SWANLEY, BR8 7PL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Crawfords, BR8 7PL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Crawfords, SWANLEY, BR8 7PL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Crawfords are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 13 Jan 2025
Details
View Map
Share
Follow
Willersley Avenue

Thames Water are proposing to carry out New service connection on Willersley Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 13 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:23.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Lakeside Close

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lakeside Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2024 and could run through until 20 February 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2024 at 13:16.

Kent County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Rennie Drive

Kent County Council are carrying out Highway improvement works on Rennie Drive, Dartford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2024 at 15:21 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 26 Nov 2024 at 15:24.

Thames Water logo
LONG TERM
Between
6 May 2024 and 13 May 2025
Details
View Map
Share
Longmead Drive

Thames Water were proposing to carry out New service connection on Longmead Drive, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2024 and run through until 13 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 15 Sep 2025
Details
View Map
Share
Hatherley Crescent

Thames Water were proposing to carry out New service connection on Hatherley Crescent, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 1 Dec 2025
Details
View Map
Share
Faraday Avenue

Thames Water were proposing to carry out New service connection on Faraday Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
West Hill

Kent County Council are carrying out Highway improvement works on West Hill, Dartford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 27 Aug 2024 at 08:15.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Kent Road

Kent County Council are carrying out roadworks on Kent Road, Dartford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 27 Aug 2024 at 08:16.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Spital Street

Kent County Council are carrying out Highway improvement works on Spital Street, Dartford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Oct 2024 at 07:29.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Highfield Road North

Kent County Council are carrying out Highway improvement works on Highfield Road North, Dartford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 27 Aug 2024 at 08:15.

Thames Water logo
LONG TERM
Between
2 Sep 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Beechfield Road

Thames Water are proposing to carry out Utility asset works on Beechfield Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 14:44.

Thames Water logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Beechfield Road

Thames Water are carrying out Utility asset works on Beechfield Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:46.

Thames Water logo
LONG TERM
Until
2 Sep 2025
Details
View Map
Share
Follow
Lesney Park

Thames Water are carrying out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.

London Borough Of Bexley logo
LONG TERM
Between
9 Sep 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.

Southern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Homestead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Homestead Road, Chelsfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 10:50 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:15.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Worlds End Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Worlds End Lane, Orpington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:10 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:22.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
New Road

Southern Gas Networks are carrying out Utility repair and maintenance works on New Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 15:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 12:24.

LONG TERM
Between
14 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Thames Road

Riverside Energy Park are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Riverside Energy Park on 16 Sep 2024 at 09:40.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Carlton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Carlton Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:09.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Orchard Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Orchard Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:09.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Fraser Road

Thames Water are carrying out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:30 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 15:02.

Southern Gas Networks logo
LONG TERM
Until
21 Jan 2025
Details
View Map
Share
Follow
Preston Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Preston Drive, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 10:00 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 11:28.

Southern Gas Networks logo
LONG TERM
Between
28 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Parkside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 16:17.

Southern Gas Networks logo
LONG TERM
Between
28 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Preston Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Preston Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 15:30.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 12 May 2025
Details
View Map
Share
Hollies Avenue

Thames Water were proposing to carry out New service connection on Hollies Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 12 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Eversley Cross

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eversley Cross, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 17:44.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Parkside Cross

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkside Cross, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 17:17.

National Highways logo
Finishing
Friday
Details
View Map
Share
Follow
Sidcup By Pass

National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2024 at 14:14.

National Highways logo
Finishing
Friday
Details
View Map
Share
Follow
Sidcup By Pass

National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 22 Oct 2024 at 13:02.

Southern Gas Networks logo
LONG TERM
Between
10 Dec 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Berkeley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:06.

Southern Gas Networks logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Berkeley Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 13:00 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 14:18.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are carrying out Highway improvement works on East Rochester Way, Bexley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 22:00 and could run through until 23 December 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 08:35.

Kent County Council logo
Until
26 Dec 2024
Details
View Map
Share
Follow
Cockerhurst Road

Kent County Council are carrying out Highway improvement works on Cockerhurst Road, Shoreham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 09:44 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 13 Dec 2024 at 10:21.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Susan Wood

Thames Water were proposing to carry out Utility repair and maintenance works on Susan Wood, Chislehurst.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:30.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Elm Road

Thames Water are proposing to carry out New service connection on Elm Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:59.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Elm Road

Thames Water are carrying out New service connection on Elm Road, Dartford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 08:10 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 09:59.

London Borough Of Bexley logo
Finishing
Monday
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are carrying out Highway repair and maintenance works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 07:56.

London Borough Of Bexley logo
Finishing
Monday
Details
View Map
Share
Follow
Westerham Drive

London Borough Of Bexley are carrying out Highway improvement works on Westerham Drive, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 07:58.

London Borough Of Bexley logo
Finishing
Monday
Details
View Map
Share
Follow
Ramillies Road

London Borough Of Bexley are carrying out Highway improvement works on Ramillies Road, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 07:57.

London Borough Of Bexley logo
Finishing
Monday
Details
View Map
Share
Follow
Overcourt Close

London Borough Of Bexley are carrying out Highway improvement works on Overcourt Close, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 07:57.

London Borough Of Bromley logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Midfield Way

London Borough Of Bromley are carrying out Highway improvement works on Midfield Way, St Pauls Cray.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 17 Dec 2024 at 09:03.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Mayplace Road East

Southern Gas Networks are carrying out Utility repair and maintenance works on Mayplace Road East, Bexleyheath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:30 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 13:22.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Sheepcote Lane

Thames Water are proposing to carry out New service connection on Sheepcote Lane, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 08:07.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Montrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:55.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Montrose Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:23.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Cavendish Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:53.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Cavendish Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:21.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:58.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Rutland Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:21.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Fairlawn Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 14:25.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Fairlawn Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 14:55.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Herbert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Herbert Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:31.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Herbert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Herbert Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:04.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Hudson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:28.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Hudson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:03.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Mayfair Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:22.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Mayfair Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 13:28.

Thames Water logo
LONG TERM
Between
2 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:25.

Thames Water logo
LONG TERM
Between
2 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:10.

Thames Water logo
LONG TERM
Between
2 Jan and 4 Mar 2025
Details
View Map
Share
Avenue Road

Thames Water were proposing to carry out Utility asset works on Avenue Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:02.

Southern Gas Networks logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Chelsfield Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Chelsfield Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 09:22.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Green Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Green Lane, Chislehurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:28.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Green Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Green Lane, Chislehurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:25.

Thames Water logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:37.

Southern Gas Networks logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Hansol Road

Southern Gas Networks are proposing to carry out New service connection on Hansol Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 12:00.

Southern Gas Networks logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Hansol Road

Southern Gas Networks are proposing to carry out New service connection on Hansol Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 15:50.

Between
6 and 26 Jan 2025
Details
View Map
Share
Bob Dunn Way

Riverside Energy Park were proposing to carry out Utility asset works on Bob Dunn Way, Dartford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 11:35.

Between
6 and 29 Jan 2025
Details
View Map
Share
Follow
Brampton Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Brampton Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 6 Nov 2024 at 11:09.

Southern Gas Networks logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:05.

Southern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 14:51.

Southern Gas Networks logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:02.

Southern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 14:51.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 4 Dec 2024 at 15:42.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 16:13.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 4 Dec 2024 at 15:42.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 16:13.

Thames Water logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bexley Road

Thames Water are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:27.

Thames Water logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bexley Road

Thames Water are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:54.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Jan and 19 Jun 2025
Details
View Map
Share
Follow
Sandy Lane

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Jan and 19 Jun 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.

London Borough Of Bexley logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 10:12.

London Borough Of Bexley logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Hurst Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 14:30.

London Borough Of Bexley logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Hurst Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 14:08.

London Borough Of Bexley logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Selborne Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Selborne Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 14:35.

London Borough Of Bexley logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Selborne Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Selborne Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 14:08.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Jan and 2 Jul 2025
Details
View Map
Share
Sevenoaks Way

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 2 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 11:11.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Heathside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Heathside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:05.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Heathside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 15:06.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jan and 29 Jul 2025
Details
View Map
Share
Cray Avenue

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.

These works were categorised as Major.

The works were originally planned to start 13 January 2025 and run through until 29 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 11:40.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Thorndon Close

Thames Water are proposing to carry out New service connection on Thorndon Close, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 10:56.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Thorndon Close

Thames Water are proposing to carry out New service connection on Thorndon Close, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 16:16.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Thorndon Close

Thames Water were proposing to carry out New service connection on Thorndon Close, St Pauls Cray.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:40.

Transport for London (TfL) logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:14.

Transport for London (TfL) logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:27.

Transport for London (TfL) logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:52.

Transport for London (TfL) logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:29.

Southern Gas Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sydney Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:34.

Southern Gas Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sydney Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:14.

Southern Gas Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sydney Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:34.

Southern Gas Networks logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Slades Drive

Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:23.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Slades Drive

Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:34.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Slades Drive

Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Welbeck Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:19.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Welbeck Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:19.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Chatsworth Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:00.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Chatsworth Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:20.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Collindale Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:20.

London Borough Of Bexley logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Horsham Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Horsham Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Oct 2024 at 12:05.

London Borough Of Bexley logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Horsham Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Horsham Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 16:50.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:30.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Jan and 3 Mar 2025
Details
View Map
Share
Sandy Lane

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:22.

London Borough Of Bexley logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Martens Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Martens Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Oct 2024 at 12:02.

London Borough Of Bexley logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Martens Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Martens Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 13:18.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Jan and 14 Aug 2025
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:35.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:10.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:49.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:33.

Southern Gas Networks logo
LONG TERM
Between
17 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Bristow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.

London Borough Of Bromley logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Station Square

London Borough Of Bromley are proposing to carry out Highway improvement works on Station Square, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 11:44.

London Borough Of Bexley logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Follow
Cray Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Cray Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 14:40.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Burnt Oak Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Burnt Oak Lane, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:15.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Chatsworth Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 10 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:17.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:40.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:14.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:36.

Southern Gas Networks logo
LONG TERM
Between
23 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Elmwood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 13:30.

Transport for London (TfL) logo
LONG TERM
Between
26 Jan 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 28 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 16:13.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Spring Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Gardens, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Meadway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Meadway, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:41.

London Borough Of Bromley logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Midfield Way

London Borough Of Bromley are proposing to carry out Highway improvement works on Midfield Way, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 12:00.

Transport for London (TfL) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:19.

Transport for London (TfL) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:34.

Transport for London (TfL) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:24.

Transport for London (TfL) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:39.

Thames Water logo
Between
27 Jan and 2 Feb 2025
Details
View Map
Share
Elm Road

Thames Water were proposing to carry out New service connection on Elm Road, Dartford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:25.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Collindale Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:11.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Hill Crest

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hill Crest, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:11.

London Borough Of Bexley logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Galloway Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Galloway Drive, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 15:29.

London Borough Of Bexley logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Galloway Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Galloway Drive, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
29 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Old Farm Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:13.

Between
29 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Crook Log

Harlaxton Energy Networks are proposing to carry out Utility asset works on Crook Log, Bexleyheath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 6 Nov 2024 at 11:09.

Southern Gas Networks logo
LONG TERM
Between
30 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:14.

Southern Gas Networks logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
The Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 14:56.

London Borough Of Bexley logo
Between
31 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Baugh Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Baugh Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 13:32.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Tower Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tower Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 15:13.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Feb and 23 May 2025
Details
View Map
Share
Follow
Cray Avenue

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.

These works are categorised as Major.

The works will start on or after 3 February 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 09:05.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:51.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Penhill Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:33.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Penhill Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:22.

Thames Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Priory Road South

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Road South, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 07:43.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Penhill Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 Oct 2024 at 18:42.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:34.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Blendon Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 Oct 2024 at 18:15.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Blendon Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Blendon Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:28.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Danson Underpass

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Danson Underpass, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:33.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Danson Underpass

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Danson Underpass, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:32.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:35.

London Borough Of Bexley logo
Between
5 and 8 Feb 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 5 Nov 2024 at 11:17.

Southern Gas Networks logo
LONG TERM
Between
6 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:46.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 17 Mar 2025
Details
View Map
Share
Follow
The Woodlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Woodlands, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:41.

Trooli logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Shellbank Lane

Trooli are proposing to carry out Utility asset works on Shellbank Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 22 Oct 2024 at 09:56.

Trooli logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Shellbank Lane

Trooli are proposing to carry out Utility asset works on Shellbank Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 25 Nov 2024 at 07:54.

Trooli logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Shellbank Lane

Trooli are proposing to carry out Utility asset works on Shellbank Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 3 Dec 2024 at 08:06.

Trooli logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Shellbank Lane

Trooli are proposing to carry out Utility asset works on Shellbank Lane, Bean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 22 Oct 2024 at 09:55.

Trooli logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Shellbank Lane

Trooli are proposing to carry out Utility asset works on Shellbank Lane, Bean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 23 Oct 2024 at 09:13.

Transport for London (TfL) logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:29.

Transport for London (TfL) logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:11.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Knoll Road

Thames Water were proposing to carry out New service connection on Knoll Road, Bexley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 08:10.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Knoll Road

Thames Water are proposing to carry out New service connection on Knoll Road, Bexley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:48.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Wilmot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wilmot Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:54.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 15:12.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:40.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:16.

Southern Gas Networks logo
LONG TERM
Between
12 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Dale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:30.

Southern Gas Networks logo
LONG TERM
Between
12 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Dale Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale Close, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 13:48.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:36.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:17.

London Borough Of Bexley logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 15:48.

London Borough Of Bexley logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 07:29.

Southern Gas Networks logo
Between
13 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Haslemere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haslemere Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 15:38.

Southern Gas Networks logo
LONG TERM
Between
14 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Elmwood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 15:56.

Southern Gas Networks logo
Between
15 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hook Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 11:01.

Southern Gas Networks logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Approach

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Approach, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:42.

Southern Gas Networks logo
Between
17 and 26 Feb 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out New service connection on Park Road, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:34.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out New service connection on Park Road, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:06.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out New service connection on Park Road, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 09:09.

London Borough Of Bexley logo
Between
17 and 21 Feb 2025
Details
View Map
Share
North Cray Road

London Borough Of Bexley were proposing to carry out Highway improvement works on North Cray Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 12:00.

Thames Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Elm Road

Thames Water were proposing to carry out New service connection on Elm Road, Dartford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 11:34.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Danson Road

Thames Water were proposing to carry out Utility asset works on Danson Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 16:31.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 13:27.

Southern Gas Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 12:45.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Long Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:37.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Long Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 12:44.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Well Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Well Hill, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 08:15.

Kent County Council logo
Between
19 and 22 Feb 2025
Details
View Map
Share
Follow
Home Gardens

Kent County Council are proposing to carry out Highway improvement works on Home Gardens, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 29 Nov 2024 at 10:00.

Kent County Council logo
Between
19 and 22 Feb 2025
Details
View Map
Share
Follow
Home Gardens

Kent County Council are proposing to carry out Highway improvement works on Home Gardens, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 2 Dec 2024 at 07:55.

Southern Gas Networks logo
Between
23 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:08.

Southern Gas Networks logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Oxenden Wood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:23.

Southern Gas Networks logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Tower Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tower Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 15:43.

Southern Gas Networks logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Chelsfield Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Chelsfield Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 15:31.

Southern Gas Networks logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out New service connection on Park Road, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 09:11.

Southern Gas Networks logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out New service connection on Park Road, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 12:00.

Transport for London (TfL) logo
LONG TERM
Between
24 Feb and 11 May 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 16:31.

Southern Gas Networks logo
Between
25 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Spring Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Gardens, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 11:15.

Southern Gas Networks logo
LONG TERM
Between
25 Feb and 31 Mar 2025
Details
View Map
Share
Follow
The Meadway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Meadway, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 11:15.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Rock Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Rock Hill, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 14:02.

London Borough Of Bexley logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Howbury Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Howbury Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Oct 2024 at 15:39.

Southern Gas Networks logo
Between
27 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Woodside Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodside Lane, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:11.

Kent County Council logo
Between
2 and 21 Mar 2025
Details
View Map
Share
Follow
Highfield Road

Kent County Council are proposing to carry out Highway improvement works on Highfield Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 11:03.

Kent County Council logo
Between
2 and 21 Mar 2025
Details
View Map
Share
Follow
West Hill

Kent County Council are proposing to carry out Highway improvement works on West Hill, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 11:03.

Kent County Council logo
Between
2 and 21 Mar 2025
Details
View Map
Share
Follow
Highfield Road North

Kent County Council are proposing to carry out Highway improvement works on Highfield Road North, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 11:00.

Kent County Council logo
Between
2 and 21 Mar 2025
Details
View Map
Share
Follow
Westgate Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Westgate Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 11:01.

Thames Water logo
Between
3 and 13 Mar 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out New service connection on High Street, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 09:41.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Mar and 6 May 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 17:33.

Southern Gas Networks logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Elmwood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 14:00.

G2 Energy IDNO logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Westwood Lane

G2 Energy IDNO are proposing to carry out Utility asset works on Westwood Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by G2 Energy IDNO on 13 Dec 2024 at 14:53.

Southern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 16:55.

Southern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 16:52.

Transport for London (TfL) logo
LONG TERM
Between
6 Mar and 1 Jun 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 1 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 16:29.

Transport for London (TfL) logo
Between
6 and 8 Mar 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:44.

Transport for London (TfL) logo
Between
6 and 8 Mar 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 11:30.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Maplescombe Lane

BT are proposing to carry out Utility asset works on Maplescombe Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 08:11.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Maplescombe Lane

BT are proposing to carry out Utility asset works on Maplescombe Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 10:49.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Beesfield Lane

BT are proposing to carry out Utility asset works on Beesfield Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 08:12.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Beesfield Lane

BT are proposing to carry out Utility asset works on Beesfield Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 10:48.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Willett Way

BT are proposing to carry out Utility asset works on Willett Way, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 6 Dec 2024 at 09:54.

Southern Gas Networks logo
Between
11 and 25 Mar 2025
Details
View Map
Share
Follow
Mayplace Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayplace Avenue, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 10:42.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Birling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 09:45.

Southern Gas Networks logo
Between
17 Mar and 14 Apr 2025
Details
View Map
Share
Follow
The Woodlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Woodlands, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 11:15.

National Highways logo
Between
17 and 22 Mar 2025
Details
View Map
Share
Follow
Sidcup By Pass

National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Nov 2024 at 14:05.

London Borough Of Bexley logo
Between
17 and 22 Mar 2025
Details
View Map
Share
North Cray Road

London Borough Of Bexley were proposing to carry out Highway improvement works on North Cray Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 22 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 07:40.


Roadworks Map near to Crawfords, SWANLEY, BR8 7PL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Crawfords, SWANLEY, BR8 7PL (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
LOWER ROAD, KENT 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Dec 2024 - 23 Dec 2024
0.4
Details
Share
Follow
2
BT logo
LOWER ROAD, KENT 
(0.5 miles)
BT
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
Complete
17 Dec 2024 08:00 - 12:10
0.5
Details
Share
3
Thames Water logo
MAIDSTONE ROAD 
(0.8 miles)
Thames Water
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.8
Details
Share
4
Virgin Media logo
NURSERY CLOSE 
(0.8 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 19 Dec 2024
0.8
Details
Share
Follow
5
BT logo
ASH CLOSE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
17 Dec 2024 09:10 - 10:28
0.8
Details
Share
6
National Highways logo
BARTHOLOMEW WAY 
(0.8 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Cancelled
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.8
Details
Share
7
National Highways logo
HIGH STREET 
(0.9 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Cancelled
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.