ROADWORKS SUMMARY
Chantry Close, BN8 5GH
Introduction
View current and future planned roadworks and road closures for Chantry Close, BN8 5GH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Chantry Close, BN8 5GH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chantry Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Friday
East Sussex County Council are carrying out Highway repair and maintenance works on Wick Street, Firle.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2025 at 16:15 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 6 Jan 2025 at 06:41.
7 Feb 2025
East Sussex County Council are carrying out roadworks on London Road, East Hoathly.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:00 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 6 Jan 2025 at 07:28.
Tomorrow
East Sussex County Council are carrying out Highway repair and maintenance works on Ashcombe Lane, Kingston.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:30 and could run through until 7 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 6 Jan 2025 at 07:19.
13 and 15 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on School Hill, Barcombe Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 22 Oct 2024 at 12:27.
13 and 15 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Spithurst Road, Barcombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 22 Oct 2024 at 12:34.
16 Jan and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Oct 2024 at 11:22.
20 and 24 Jan 2025
East Sussex County Council are proposing to carry out roadworks on Firle Bostal, Firle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 23 Oct 2024 at 12:48.
20 and 28 Jan 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Ashcombe Lane, Kingston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 08:23.
25 Jan and 2 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 11:31.
30 Jan and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Bypass, Little Horsted, Uckfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 10:09.
1 and 9 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Nov 2024 at 10:59.
6 and 15 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Bypass, Little Horsted, Uckfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 15 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 08:27.
17 Feb and 15 Mar 2025
East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Iford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.
17 Feb and 18 Apr 2025
East Sussex County Council are proposing to carry out roadworks on Eastbourne Road, Ridgewood, Uckfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 28 Oct 2024 at 12:47.
17 Feb and 21 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Terrace, Lewes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 26 Nov 2024 at 12:14.
17 Feb and 21 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Terrace, Lewes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 5 Nov 2024 at 11:11.
17 and 21 Feb 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Friars Walk, Lewes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 12 Nov 2024 at 09:10.
17 Feb and 15 Mar 2025
East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Rodmell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.
17 Feb and 15 Mar 2025
East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Kingston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.
17 and 23 Feb 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Ashcombe Lane, Kingston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 13:54.
17 and 23 Feb 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Ashcombe Lane, Kingston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 11:10.
17 and 25 Feb 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Ashcombe Lane, Kingston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Oct 2024 at 09:35.
17 Feb and 15 Mar 2025
East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Northease.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.
17 Feb and 15 Mar 2025
East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Swanborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.
18 and 26 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Road, Stoneham, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 11:40.
18 and 26 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Road, Stoneham, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 10:02.
24 Feb and 4 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on South Street, Lewes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:41.
24 and 26 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Sandhill Lane, East Sussex, Halland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 28 Nov 2024 at 08:14.
3 and 5 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Rodmell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 13 Nov 2024 at 11:16.
3 and 5 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Rodmell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 24 Dec 2024 at 09:02.
10 and 14 Mar 2025
South East Water are proposing to carry out Utility asset works on Bishops Lane, Ringmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 24 Dec 2024 at 09:17.
10 and 14 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Broomham Lane, Whitesmith, Chiddingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 18 Dec 2024 at 12:52.
10 and 14 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Broomham Lane, Whitesmith, Chiddingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 10 Dec 2024 at 08:28.
10 Mar and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bradfords Lane, Little Horsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 10:37.
10 Mar and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bradfords Lane, Little Horsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 10:19.
10 Mar and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bradfords Lane, Little Horsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 10:39.
10 Mar and 22 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ringmer Road, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 08:42.
10 Mar and 22 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ringmer Road, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 11:26.
10 Mar and 22 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ringmer Road, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 08:18.
10 Mar and 29 Apr 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Ringmer Road, Ringmer.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 29 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 08:02.
10 and 21 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on White Hill, Lewes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 12:54.
19 and 21 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Hill, Ringmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 27 Dec 2024 at 08:00.
26 and 28 Mar 2025
South East Water are proposing to carry out New service connection on Common Lane, Laughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 6 Jan 2025 at 10:20.
31 Mar and 2 Apr 2025
South East Water are proposing to carry out Utility repair and maintenance works on Palehouse Common, Framfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 2 Jan 2025 at 08:20.
1 and 3 Apr 2025
South East Water are proposing to carry out Utility repair and maintenance works on Norlington Lane, Ringmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 3 Jan 2025 at 08:54.
4 and 7 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Itford Farm Lane, Itford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Dec 2024 at 11:39.
Roadworks Map near to Chantry Close, BN8 5GH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Chantry Close, BN8 5GH (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 12 Aug 2024 - 11 Mar 2026)
(Scheduled: 2 Sep 2024 - 20 Mar 2026)
(Scheduled: 6 Jan 2025 - 8 Jan 2025)
(Scheduled: 14 Oct 2024 - 24 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.