ROADWORKS SUMMARY
Wood Lane, HENFIELD, BN5 9YF
Introduction
View current and future planned roadworks and road closures for Wood Lane, BN5 9YF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Wood Lane, HENFIELD, BN5 9YF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Jan 2023 and 30 Dec 2027
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Edburton Road, Fulking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2023 and could run through until 30 December 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 21 Jul 2023 at 10:35.
18 Mar 2024 and 18 Mar 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Woodmancote, Henfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2024 and could run through until 18 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 26 Sep 2023 at 06:24.
25 Jul 2024 and 25 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Footway Greenacres 47 To 52, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2024 and could run through until 25 February 2025. The works will impact the footpath only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 26 Mar 2024 at 11:11.
14 Sep 2024 and 15 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hebe Road, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 15 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 14:30.
13 Oct 2024 and 13 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Ropewalk, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 13 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 23 Sep 2024 at 10:18.
14 Oct 2024 and 4 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Road, Shoreham-by-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 11:32.
14 Oct 2024 and 4 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Road, Shoreham-by-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 10:25.
14 Oct 2024 and 4 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Road, Shoreham-by-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 09:30.
6 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on New Road, Shoreham-by-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:09.
7 and 9 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Castle Lane, Bramber.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 14 Dec 2024 at 08:48.
7 and 9 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Castle Lane, Bramber.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 19 Nov 2024 at 15:04.
7 and 24 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Castle Lane, Bramber.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 09:34.
13 Jan and 7 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Ham Road, Shoreham-by-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 4 Dec 2024 at 08:29.
13 Jan and 7 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Ham Road, Shoreham-by-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 27 Dec 2024 at 13:22.
13 Jan and 7 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Ham Road, Shoreham-by-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 26 Nov 2024 at 15:57.
17 and 20 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brunswick Road, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Jul 2024 at 13:21.
17 and 20 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brunswick Road, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Dec 2024 at 14:33.
20 and 25 Jan 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Steyning Road, Shoreham-by-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 25 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 09:46.
20 and 24 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on John Street, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:45.
20 and 24 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on John Street, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Nov 2024 at 13:55.
27 and 29 Jan 2025
South East Water are proposing to carry out New service connection on Clappers Lane, Fulking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 14 Oct 2024 at 10:19.
27 and 29 Jan 2025
South East Water are proposing to carry out New service connection on Clappers Lane, Fulking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 27 Oct 2024 at 14:39.
27 and 29 Jan 2025
South East Water are proposing to carry out New service connection on Clappers Lane, Fulking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 29 Oct 2024 at 10:28.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway improvement works on Kent Street, Cowfold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 08:29.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway improvement works on Kent Street, Cowfold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 Dec 2024 at 08:33.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway improvement works on Wineham Lane, Wineham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 Dec 2024 at 10:20.
27 Jan and 2 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Adur Bridge Roundabout, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 Dec 2024 at 11:39.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway improvement works on Wineham Lane, Wineham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Dec 2024 at 09:30.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Buckingham Road, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 11:40.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Ravens Road, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 Nov 2024 at 15:37.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Ravens Road, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 11:18.
27 and 30 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Ravens Road, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 13 Nov 2024 at 12:49.
27 and 30 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Queens Place, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 13 Nov 2024 at 12:32.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Queens Place, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 11:20.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Queens Place, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 Nov 2024 at 15:38.
27 and 29 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Brunswick Road, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Oct 2024 at 20:27.
4 and 6 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Southdown Road, Portslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 10:19.
4 and 6 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Southdown Road, Portslade.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 18 Nov 2024 at 13:39.
10 and 12 Feb 2025
South East Water are proposing to carry out Utility repair and maintenance works on Truslers Hill Lane, Albourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 10 Dec 2024 at 09:25.
10 and 12 Feb 2025
South East Water are proposing to carry out Utility repair and maintenance works on Truslers Hill Lane, Albourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 27 Nov 2024 at 15:17.
17 and 21 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on New Road, Upper Beeding.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 15:24.
17 and 21 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on New Road, Upper Beeding.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Nov 2024 at 14:11.
17 and 21 Feb 2025
National Highways are proposing to carry out Highway repair and maintenance works on New Barn Road To New Kingston Barn, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 10:01.
17 and 19 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Southdown Road, Portslade.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:41.
3 Mar and 25 Apr 2025
West Sussex County Council are proposing to carry out Highway improvement works on Upper Shoreham Road, Shoreham-by-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 12:48.
3 Mar and 25 Apr 2025
West Sussex County Council are proposing to carry out Highway improvement works on Upper Shoreham Road, Shoreham-by-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:51.
3 Mar and 25 Apr 2025
West Sussex County Council are proposing to carry out Highway improvement works on Upper Shoreham Road, Shoreham-by-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 12 Dec 2024 at 14:22.
3 Mar and 17 Apr 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Drive, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:53.
3 Mar and 17 Apr 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Drive, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 12:42.
3 Mar and 17 Apr 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Drive, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 12 Dec 2024 at 14:05.
10 and 14 Mar 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Downside, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Dec 2024 at 08:34.
10 and 14 Mar 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Downside, Shoreham-by-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Dec 2024 at 15:27.
Roadworks Map near to Wood Lane, HENFIELD, BN5 9YF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Wood Lane, HENFIELD, BN5 9YF (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.