ROADWORKS SUMMARY
Golden Cross, HAILSHAM, BN27 4AW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Golden Cross, BN27 4AW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Golden Cross, HAILSHAM, BN27 4AW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Golden Cross are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

East Sussex County Council logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
New North Street

East Sussex County Council are carrying out roadworks on New North Street, Hellingly.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 07:00 and could run through until 24 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 30 Oct 2024 at 07:17.

Electricity Network Company logo
Finishing
Wednesday
Details
View Map
Share
Follow
High Street

Electricity Network Company are carrying out Utility asset works on High Street, East Hoathly.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 11 Nov 2024 at 08:39.

East Sussex County Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Old Swan Lane

East Sussex County Council are carrying out roadworks on Old Swan Lane, Hailsham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:47 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 11 Nov 2024 at 07:47.

East Sussex County Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Station Road

East Sussex County Council are carrying out roadworks on Station Road, Hailsham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:48 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 11 Nov 2024 at 07:48.

East Sussex County Council logo
Finishing
Tomorrow
Details
View Map
Share
A27 From J A26 Roundabout At Beddingham To J A22

East Sussex County Council were proposing to carry out Highway repair and maintenance works on A27 From J A26 Roundabout At Beddingham To J A22, Lewes.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 24 Sep 2024 at 08:33.

East Sussex County Council logo
Finishing
Saturday
Details
View Map
Share
The Village

East Sussex County Council were proposing to carry out Highway repair and maintenance works on The Village, Alciston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 2 Oct 2024 at 09:00.

Electricity Network Company logo
Between
27 Nov and 18 Dec 2024
Details
View Map
Share
Follow
The Broyle

Electricity Network Company are proposing to carry out New service connection on The Broyle, Ringmer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 3 Sep 2024 at 13:43.

Until
18 Dec 2024
Details
View Map
Share
Follow
The Broyle

GTC Pipelines are carrying out New service connection on The Broyle, Ringmer.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 10:00 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 27 Nov 2024 at 11:16.

Between
27 Nov and 18 Dec 2024
Details
View Map
Share
Follow
The Broyle

GTC Pipelines are proposing to carry out New service connection on The Broyle, Ringmer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 9 Sep 2024 at 11:16.

Between
27 Nov and 18 Dec 2024
Details
View Map
Share
Follow
The Broyle

GTC Pipelines are proposing to carry out New service connection on The Broyle, Ringmer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 3 Sep 2024 at 13:44.

Between
27 Nov and 18 Dec 2024
Details
View Map
Share
The Broyle

GTC Pipelines were proposing to carry out New service connection on The Broyle, Ringmer.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 3 Sep 2024 at 13:30.

Between
27 Nov and 18 Dec 2024
Details
View Map
Share
The Broyle

GTC Pipelines were proposing to carry out New service connection on The Broyle, Ringmer.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 3 Sep 2024 at 13:28.

Electricity Network Company logo
Until
18 Dec 2024
Details
View Map
Share
Follow
The Broyle

Electricity Network Company are carrying out New service connection on The Broyle, Ringmer.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 10:30 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 27 Nov 2024 at 11:16.

Electricity Network Company logo
Between
27 Nov and 18 Dec 2024
Details
View Map
Share
Follow
The Broyle

Electricity Network Company are proposing to carry out New service connection on The Broyle, Ringmer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 11:18.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ripe Lane

Network Rail are proposing to carry out Works for Rail Purposes on Ripe Lane, Firle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Jun 2024 at 13:37.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ripe Lane

Network Rail are proposing to carry out Works for Rail Purposes on Ripe Lane, Firle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 12:50.

Network Rail logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
The Street

Network Rail are proposing to carry out Works for Rail Purposes on The Street, Selmeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 08:13.

Network Rail logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
The Street

Network Rail are proposing to carry out Works for Rail Purposes on The Street, Selmeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Jun 2024 at 10:41.

Electricity Network Company logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
South Street

Electricity Network Company are proposing to carry out Utility asset works on South Street, East Hoathly.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 May 2024 at 14:38.

East Sussex County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chilver Bridge Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Chilver Bridge Road, Arlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Nov 2024 at 15:05.

UK Power Networks South Eastern logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
North Street

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on North Street, Waldron.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 15:18.

UK Power Networks South Eastern logo
Between
13 and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2024 at 08:14.

East Sussex County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Lewes Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Aug 2024 at 17:18.

East Sussex County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Lewes Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 11 Sep 2024 at 12:11.

East Sussex County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

East Sussex County Council are proposing to carry out roadworks on London Road, East Hoathly.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 28 Oct 2024 at 10:56.

Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 21 Nov 2024 at 10:30.

Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 9 Oct 2024 at 12:35.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 9 Oct 2024 at 08:57.

UK Power Networks South Eastern logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 10:22.

East Sussex County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lewes Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Aug 2024 at 17:19.

East Sussex County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lewes Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 30 Sep 2024 at 11:28.

South East Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
New Road

South East Water are proposing to carry out New service connection on New Road, Hellingly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 10 Sep 2024 at 10:18.

UK Power Networks South Eastern logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 14:45.

South East Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
New Road

South East Water are proposing to carry out New service connection on New Road, Hellingly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 18 Sep 2024 at 06:29.

UK Power Networks South Eastern logo
Between
16 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Eastbourne Road

UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Oct 2024 at 11:22.

East Sussex County Council logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Lewes Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 12 Nov 2024 at 16:08.

UK Power Networks South Eastern logo
Between
25 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Eastbourne Road

UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 11:31.

UK Power Networks South Eastern logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Uckfield Bypass

UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Bypass, Little Horsted, Uckfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 10:09.

UK Power Networks South Eastern logo
Between
1 and 9 Feb 2025
Details
View Map
Share
Follow
Eastbourne Road

UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Nov 2024 at 10:59.

Southern Gas Networks logo
Between
3 and 13 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Southern Gas Networks are proposing to carry out New service connection on Vicarage Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 14:08.

East Sussex County Council logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Lewes Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 9 Aug 2024 at 11:52.

South East Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Chalvington Road

South East Water are proposing to carry out New service connection on Chalvington Road, Chalvington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 18 Sep 2024 at 06:38.

South East Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Chalvington Road

South East Water are proposing to carry out New service connection on Chalvington Road, Chalvington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 20 Sep 2024 at 10:26.

UK Power Networks South Eastern logo
Between
6 and 15 Feb 2025
Details
View Map
Share
Follow
Uckfield Bypass

UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Bypass, Little Horsted, Uckfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 15 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 08:27.

South East Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Grove Hill

South East Water are proposing to carry out New service connection on Grove Hill, Hellingly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 25 Sep 2024 at 11:41.

Southern Gas Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Vicarage Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:18.

East Sussex County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
The Village

East Sussex County Council are proposing to carry out Highway repair and maintenance works on The Village, Alciston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 26 Nov 2024 at 13:23.

Southern Gas Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Southern Gas Networks are proposing to carry out New service connection on Vicarage Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:06.

South East Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Mill Road

South East Water are proposing to carry out Utility asset works on Mill Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 20 Nov 2024 at 14:30.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Sandhill Lane

BT are proposing to carry out Utility repair and maintenance works on Sandhill Lane, East Sussex, Halland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Nov 2024 at 19:30.


Roadworks Map near to Golden Cross, HAILSHAM, BN27 4AW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Nov 2024 05:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Golden Cross, HAILSHAM, BN27 4AW (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South East Water logo
URGENT
  
CHALVINGTON ROAD 
(0.7 miles)
South East Water
Utility repair and maintenance works - Verge - Give and take
Complete
25 Nov 2024 14:48 - 16:03
0.7
Details
Share