ROADWORKS SUMMARY
Hedley Way, HAILSHAM, BN27 3FZ
Introduction

View current and future planned roadworks and road closures for Hedley Way, BN27 3FZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hedley Way, HAILSHAM, BN27 3FZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hedley Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
Tomorrow
East Sussex County Council are proposing to carry out roadworks on New North Street, Hellingly.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 June 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by East Sussex County Council on 4 Dec 2024 at 08:05.
Tomorrow
East Sussex County Council are proposing to carry out roadworks on New North Street, Hellingly.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 June 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by East Sussex County Council on 10 Dec 2024 at 08:38.
Tomorrow
East Sussex County Council are carrying out roadworks on New North Street, Hellingly.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 07:00 and could run through until 4 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 3 Feb 2025 at 07:38.
31 Mar and 31 Jul 2025
East Sussex County Council were proposing to carry out Highway improvement works on Golden Jubilee Way, Eastbourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 6 Feb 2025 at 10:13.
31 Mar and 31 Jul 2025
East Sussex County Council were proposing to carry out Highway improvement works on Golden Jubilee Way, Westham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 6 Feb 2025 at 10:13.
23 Apr and 18 Jul 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Mill Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 4 Mar 2025 at 11:11.
5 May and 13 Jun 2025
South East Water were proposing to carry out New service connection on Amberstone, Hailsham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 18 Feb 2025 at 10:11.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Eastbourne Road, Polegate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Electricity Network Company on 20 Jan 2025 at 13:36.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Eastbourne Road, Polegate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Electricity Network Company on 4 Feb 2025 at 10:09.
Monday
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Vicarage Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 08:55.
2 and 13 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellbanks Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Mar 2025 at 10:01.
Monday
South East Water are carrying out Utility repair and maintenance works on Ersham Way, Hailsham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 11:38 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 3 Jun 2025 at 12:24.
Today
East Sussex County Council are carrying out Highway repair and maintenance works on Hale Green, Chiddingly.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 3 June 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 3 Jun 2025 at 09:12.
Today
East Sussex County Council are carrying out Highway repair and maintenance works on Stonehill, Chiddingly.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 3 June 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 3 Jun 2025 at 09:10.
5 Jun and 25 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Dittons Road, Stone Cross.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 24 Apr 2025 at 12:43.
5 Jun and 25 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Dittons Road, Stone Cross.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 11:58.
5 Jun and 18 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Dittons Road, Stone Cross.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 12:04.
5 Jun and 19 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Dittons Road, Stone Cross.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 23 May 2025 at 14:32.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Golden Jubilee Way, Westham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 15:42.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Dittons Road, Polegate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 15:32.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Dittons Road Roundabout South, Stone Cross, Westham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 15:29.
Monday
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Aberdale Road, Polegate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 26 Feb 2025 at 14:18.
Monday
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lynholm Road, Polegate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 26 Feb 2025 at 14:19.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Golden Jubilee Way, Westham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 15:47.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Arlington Eagles Roundabout, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 15:03.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Polegate Road, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 15:18.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on South Road, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 13:00.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway improvement works on Hailsham Bypass, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 14:05.
5 Jun and 25 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hempstead Lane, Hailsham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 12:24.
5 Jun and 25 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hawks Road, Hailsham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 23 May 2025 at 15:52.
5 Jun and 25 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hempstead Lane, Hailsham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 12:21.
5 Jun and 19 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hempstead Lane, Hailsham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 19 July 2025. The works were due to impact the verge only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 12:26.
5 Jun and 25 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on London Road, Hailsham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 23 May 2025 at 15:52.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hailsham Bypass, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 15:22.
5 Jun and 27 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on The Dicker, Lower Dicker.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 11:53.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Boship Roundabout, Lower Dicker.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 15:15.
5 Jun and 25 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Lower Horsebridge, Hellingly.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 15:34.
5 Jun and 25 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on New North Street, Hellingly.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Apr 2025 at 13:51.
6 Jun and 31 Oct 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Jevington Road, Filching, Willingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 24 Apr 2025 at 16:11.
9 and 20 Jun 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Wannock Road, Wannock, Willingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 14:06.
9 and 20 Jun 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Wannock Road, Wannock, Willingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 28 May 2025 at 15:13.
9 and 20 Jun 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Wannock Road, Polegate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 14:05.
9 and 20 Jun 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Wannock Road, Polegate.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 28 May 2025 at 15:13.
9 Jun and 30 Sep 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on The Street, Wilmington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 11 Mar 2025 at 14:49.
9 Jun and 19 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Dittons Road, Stone Cross.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:56.
9 Jun and 19 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Golden Jubilee Way, Westham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 15:02.
9 Jun and 19 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Dittons Road, Polegate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 15:01.
9 Jun and 19 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Dittons Road Roundabout South, Stone Cross, Westham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:56.
9 Jun and 19 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Golden Jubilee Way, Westham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 15:00.
9 Jun and 4 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellbanks Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 10:54.
9 Jun and 4 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellbanks Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 11:33.
9 Jun and 16 Aug 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hailsham Bypass, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:53.
9 Jun and 4 Jul 2025
East Sussex County Council are proposing to carry out roadworks on Lower Horsebridge, Hellingly.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by East Sussex County Council on 20 Feb 2025 at 09:52.
9 Jun and 30 Sep 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Trolliloes Lane, Cowbeech, Herstmonceux.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 10 Mar 2025 at 13:29.
9 Jun and 30 Sep 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Meadow Rise, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 10 Mar 2025 at 10:23.
9 Jun and 30 Sep 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Downline Close, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 10 Mar 2025 at 10:52.
9 Jun and 30 Sep 2025
East Sussex County Council are proposing to carry out Highway improvement works on Hillside Drive, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 10 Mar 2025 at 10:41.
9 and 12 Jun 2025
South East Water are proposing to carry out Utility repair and maintenance works on Nettlesworth Lane, Vines Cross, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 3 Mar 2025 at 14:53.
9 and 12 Jun 2025
South East Water are proposing to carry out Utility repair and maintenance works on Nettlesworth Lane, Vines Cross, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 22 May 2025 at 15:13.
16 and 24 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Swan Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 24 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 12:31.
16 and 24 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Swan Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 24 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 11:26.
16 Jun and 15 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Mar 2025 at 09:55.
20 Jun and 17 Jul 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on A27 From J A26 Roundabout At Beddingham To J A22, Lewes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 1 Apr 2025 at 12:34.
23 Jun and 31 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Jevington Road, Filching, Willingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 19 May 2025 at 14:36.
23 Jun and 1 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Hailsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 15:12.
23 Jun and 1 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Hailsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 11:32.
23 Jun and 4 Jul 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Garfield Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 23 Apr 2025 at 10:14.
26 Jun and 31 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Jevington Road, Filching, Willingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 28 May 2025 at 07:43.
30 Jun and 4 Jul 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Horsebridge, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Apr 2025 at 08:49.
1 and 20 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on The Street, Wilmington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 20 May 2025 at 14:11.
7 and 18 Jul 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Garfield Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 30 Apr 2025 at 09:16.
7 and 18 Jul 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Garfield Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 6 May 2025 at 10:22.
7 Jul and 15 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Street, Lower Horsebridge, Hellingly.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 11:29.
7 and 10 Jul 2025
South East Water are proposing to carry out Utility repair and maintenance works on Laundry Lane, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 10 Apr 2025 at 10:20.
7 and 10 Jul 2025
South East Water are proposing to carry out Utility repair and maintenance works on Laundry Lane, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 23 May 2025 at 11:17.
8 and 21 Jul 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Pevensey Road, Polegate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 16 Apr 2025 at 09:09.
8 and 21 Jul 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Pevensey Road, Polegate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 24 Apr 2025 at 14:47.
14 and 30 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Trolliloes Lane, Cowbeech, Herstmonceux.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 11:20.
14 and 16 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hammer Lane, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 14 Apr 2025 at 08:54.
15 and 30 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Meadow Rise, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 11:14.
15 and 30 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Downline Close, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 11:07.
15 and 30 Jul 2025
East Sussex County Council are proposing to carry out Highway improvement works on Hillside Drive, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 21 May 2025 at 11:13.
16 and 30 Jul 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Bellbanks Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 9 May 2025 at 14:56.
16 and 30 Jul 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Bellbanks Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 2 Jun 2025 at 15:35.
21 Jul and 22 Aug 2025
East Sussex County Council are proposing to carry out roadworks on Hailsham Road, Stone Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 6 May 2025 at 10:16.
21 Jul and 16 Aug 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Arlington Eagles Roundabout, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:07.
21 Jul and 16 Aug 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Polegate Road, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:40.
21 Jul and 16 Aug 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on South Road, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:51.
21 Jul and 16 Aug 2025
East Sussex County Council were proposing to carry out Highway improvement works on Hailsham Bypass, Hailsham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 16 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 10:08.
21 Jul and 16 Aug 2025
East Sussex County Council are proposing to carry out Highway improvement works on Hailsham Bypass, Hailsham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:55.
21 Jul and 16 Aug 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on The Dicker, Lower Dicker.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 16 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 10:10.
21 Jul and 16 Aug 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on The Dicker, Lower Dicker.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:45.
21 Jul and 16 Aug 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Boship Roundabout, Lower Dicker.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 16 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 10:09.
21 Jul and 16 Aug 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Boship Roundabout, Lower Dicker.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:10.
21 Jul and 16 Aug 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Lower Horsebridge, Hellingly.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 16 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 10:12.
21 Jul and 16 Aug 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Lower Horsebridge, Hellingly.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 16 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 10:24.
21 Jul and 16 Aug 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on New North Street, Hellingly.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 May 2025 at 14:54.
21 and 23 Jul 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Chiddingly Road, Horam.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 24 Mar 2025 at 08:44.
21 and 23 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Chiddingly Road, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 1 Apr 2025 at 08:31.
21 and 23 Jul 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Chiddingly Road, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 3 Apr 2025 at 12:24.
23 Jul and 1 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Broad Road, Lower Willingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 3 Mar 2025 at 07:46.
23 Jul and 1 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Broad Road, Lower Willingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 3 Mar 2025 at 09:23.
23 Jul and 15 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Eastbourne Road, Polegate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Electricity Network Company on 17 Feb 2025 at 12:12.
23 Jul and 15 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Eastbourne Road, Polegate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Electricity Network Company on 21 Feb 2025 at 09:25.
23 Jul and 15 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Eastbourne Road, Polegate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Electricity Network Company on 24 Feb 2025 at 07:37.
23 Jul and 15 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Eastbourne Road, Polegate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Electricity Network Company on 24 Feb 2025 at 11:36.
23 Jul and 15 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Eastbourne Road, Polegate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Electricity Network Company on 24 Feb 2025 at 13:39.
23 Jul and 15 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Eastbourne Road, Polegate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Electricity Network Company on 24 Feb 2025 at 14:51.
28 Jul and 19 Sep 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Mill Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 13 May 2025 at 14:06.
28 Jul and 19 Sep 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Mill Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 2 Jun 2025 at 15:12.
28 Jul and 22 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Hailsham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 22 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 10:26.
28 Jul and 22 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Hailsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Apr 2025 at 08:29.
28 Jul and 17 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hempstead Lane, Hailsham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 17 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 08:19.
28 Jul and 17 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hempstead Lane, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 13:38.
28 Jul and 3 Aug 2025
Telefonica UK are proposing to carry out Utility asset works on Park Road, Hellingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 9 Apr 2025 at 09:56.
28 Jul and 4 Aug 2025
Telefonica UK are proposing to carry out Utility asset works on Park Road, Hellingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 16 Apr 2025 at 16:17.
28 Jul and 15 Aug 2025
East Sussex County Council are proposing to carry out Section 50 on West End, Herstmonceux.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 1 May 2025 at 11:30.
28 Jul and 15 Aug 2025
East Sussex County Council are proposing to carry out Section 50 on West End, Herstmonceux.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 8 May 2025 at 08:59.
1 and 4 Aug 2025
BT are proposing to carry out Utility asset works on Downash Road, East Sussex, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 4 August 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 14 May 2025 at 08:03.
1 and 4 Aug 2025
BT are proposing to carry out Utility asset works on Chilsham Lane, East Sussex, Herstmonceux.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 4 August 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 12 May 2025 at 08:35.
4 Aug and 19 Sep 2025
Electricity Network Company were proposing to carry out Utility asset works on Old Swan Lane, Hailsham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 19 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 12 May 2025 at 08:03.
4 Aug and 19 Sep 2025
GTC Pipelines were proposing to carry out Utility asset works on Station Road, Hailsham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 19 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 12 May 2025 at 08:02.
5 Aug and 14 Oct 2025
East Sussex County Council are proposing to carry out roadworks on Ersham Road, Hailsham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 15 May 2025 at 09:20.
6 and 8 Aug 2025
South East Water are proposing to carry out New service connection on Hawthylands Road, Hailsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 14 May 2025 at 13:31.
11 and 16 Aug 2025
Telefonica UK are proposing to carry out Utility asset works on Park Road, Hellingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 9 Apr 2025 at 10:10.
11 and 16 Aug 2025
Telefonica UK are proposing to carry out Utility asset works on Park Road, Hellingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 16 Apr 2025 at 16:13.
14 and 18 Aug 2025
South East Water are proposing to carry out New service connection on Church Lane, Laughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 12 May 2025 at 11:17.
14 and 18 Aug 2025
South East Water are proposing to carry out New service connection on Church Lane, Laughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 14 May 2025 at 12:42.
21 Aug and 30 Sep 2025
Electricity Network Company are proposing to carry out Utility asset works on Old Swan Lane, Hailsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 14 May 2025 at 10:01.
21 Aug and 30 Sep 2025
GTC Pipelines are proposing to carry out Utility asset works on Station Road, Hailsham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 14 May 2025 at 10:02.
26 Aug and 12 Sep 2025
East Sussex County Council are proposing to carry out Section 50 on West End, Herstmonceux.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 29 May 2025 at 12:59.
Roadworks Map near to Hedley Way, HAILSHAM, BN27 3FZ (Loading...)













- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hedley Way, HAILSHAM, BN27 3FZ (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 May 2025 - 6 Jun 2025)
(Scheduled: 30 Sep 2024 - 20 Mar 2026)
(Scheduled: 3 Feb 2025 - 4 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.