ROADWORKS SUMMARY
Brunel Drive, HAILSHAM, BN27 3FY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Brunel Drive, BN27 3FY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Brunel Drive, HAILSHAM, BN27 3FY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brunel Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Wannock Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wannock Road, Polegate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 08:49.

East Sussex County Council logo
LONG TERM
Between
14 Oct and 1 Dec 2024
Details
View Map
Share
Follow
Banner Way

East Sussex County Council are proposing to carry out Section 50 on Banner Way, Stone Cross, Westham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Sussex County Council on 22 Aug 2024 at 11:39.

East Sussex County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Banner Way

East Sussex County Council are carrying out Section 50 on Banner Way, Stone Cross, Westham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 07:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by East Sussex County Council on 14 Oct 2024 at 07:57.

Southern Water logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Joes Lane

Southern Water are carrying out Utility repair and maintenance works on Joes Lane, Windmill Hill, Herstmonceux.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:06 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 15 Nov 2024 at 13:50.

Southern Water logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Windmill Hill Road

Southern Water are carrying out Utility repair and maintenance works on Windmill Hill Road, Windmill Hill, Herstmonceux.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:05 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 14 Nov 2024 at 13:46.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Wannock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wannock Road, Wannock, Willingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:51.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Wannock Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wannock Road, Wannock, Willingdon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 12:49.

East Sussex County Council logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
New North Street

East Sussex County Council are carrying out roadworks on New North Street, Hellingly.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 07:00 and could run through until 24 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 30 Oct 2024 at 07:17.

East Sussex County Council logo
LONG TERM
Between
4 Nov 2024 and 16 May 2025
Details
View Map
Share
Follow
Golden Jubilee Way

East Sussex County Council are proposing to carry out Highway improvement works on Golden Jubilee Way, Eastbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 31 Jul 2024 at 12:40.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Coopers Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Coopers Hill, Willingdon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 12:20 and could run through until 26 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 14:35.

East Sussex County Council logo
LONG TERM
Between
4 Nov 2024 and 16 May 2025
Details
View Map
Share
Follow
Golden Jubilee Way

East Sussex County Council are proposing to carry out Highway improvement works on Golden Jubilee Way, Westham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 31 Jul 2024 at 12:00.

East Sussex County Council logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Hankham Road

East Sussex County Council are proposing to carry out Section 50 on Hankham Road, Hankham, Westham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 16 Sep 2024 at 11:45.

East Sussex County Council logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Hankham Road

East Sussex County Council are carrying out Section 50 on Hankham Road, Hankham, Westham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:00 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 11 Nov 2024 at 07:59.

East Sussex County Council logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Hailsham Road

East Sussex County Council are proposing to carry out Section 50 on Hailsham Road, Stone Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 16 Sep 2024 at 11:51.

East Sussex County Council logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Hailsham Road

East Sussex County Council are carrying out Section 50 on Hailsham Road, Stone Cross.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:52 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 11 Nov 2024 at 07:52.

East Sussex County Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Station Road

East Sussex County Council are carrying out roadworks on Station Road, Hailsham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:48 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 11 Nov 2024 at 07:48.

East Sussex County Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Old Swan Lane

East Sussex County Council are carrying out roadworks on Old Swan Lane, Hailsham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:47 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 11 Nov 2024 at 07:47.

East Sussex County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
A27 From J A26 Roundabout At Beddingham To J A22

East Sussex County Council were proposing to carry out Highway repair and maintenance works on A27 From J A26 Roundabout At Beddingham To J A22, Lewes.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 24 Sep 2024 at 08:33.

UK Power Networks South Eastern logo
Finishing
Sunday
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2024 at 09:09.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Victoria Road

UK Power Networks South Eastern are carrying out Disconnection or alteration of supply on Victoria Road, Polegate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 13:31 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 08:44.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Victoria Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Victoria Road, Polegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Aug 2024 at 11:51.

South East Water logo
Finishing
Today
Details
View Map
Share
Follow
Bemzells Lane

South East Water are proposing to carry out Utility repair and maintenance works on Bemzells Lane, Herstmonceux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 28 Aug 2024 at 14:55.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Thornwell Road

Network Rail were proposing to carry out Works for Rail Purposes on Thornwell Road, Wilmington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Oct 2024 at 12:21.

South East Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Nettlesworth Lane

South East Water are proposing to carry out Utility repair and maintenance works on Nettlesworth Lane, Vines Cross, Horam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by South East Water on 28 Aug 2024 at 13:25.

South East Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Nettlesworth Lane

South East Water are proposing to carry out Utility repair and maintenance works on Nettlesworth Lane, Vines Cross, Horam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by South East Water on 6 Sep 2024 at 08:34.

South East Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Nettlesworth Lane

South East Water are proposing to carry out Utility repair and maintenance works on Nettlesworth Lane, Vines Cross, Horam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by South East Water on 9 Sep 2024 at 12:47.

South East Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Nettlesworth Lane

South East Water are proposing to carry out Utility repair and maintenance works on Nettlesworth Lane, Vines Cross, Horam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by South East Water on 16 Sep 2024 at 13:44.

Network Rail logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
The Street

Network Rail are proposing to carry out Works for Rail Purposes on The Street, Selmeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Jun 2024 at 10:41.

Network Rail logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
The Street

Network Rail are proposing to carry out Works for Rail Purposes on The Street, Selmeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 08:13.

East Sussex County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chilver Bridge Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Chilver Bridge Road, Arlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 21 Nov 2024 at 09:40.

UK Power Networks South Eastern logo
Between
13 and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2024 at 08:14.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Wannock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wannock Road, Wannock, Willingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Jul 2024 at 11:22.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 9 Oct 2024 at 08:57.

Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 9 Oct 2024 at 12:35.

Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 21 Nov 2024 at 10:30.

South East Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
New Road

South East Water are proposing to carry out New service connection on New Road, Hellingly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 18 Sep 2024 at 06:29.

South East Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
New Road

South East Water are proposing to carry out New service connection on New Road, Hellingly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 10 Sep 2024 at 10:18.

UK Power Networks South Eastern logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 10:22.

UK Power Networks South Eastern logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Station Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 14:45.

Southern Gas Networks logo
Between
3 and 13 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Southern Gas Networks are proposing to carry out New service connection on Vicarage Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 14:08.

South East Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Chalvington Road

South East Water are proposing to carry out New service connection on Chalvington Road, Chalvington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 20 Sep 2024 at 10:26.

South East Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Chalvington Road

South East Water are proposing to carry out New service connection on Chalvington Road, Chalvington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 18 Sep 2024 at 06:38.

BT logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Cross Street

BT are proposing to carry out Utility repair and maintenance works on Cross Street, Polegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 14:58.

South East Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Grove Hill

South East Water are proposing to carry out New service connection on Grove Hill, Hellingly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 25 Sep 2024 at 11:41.

Southern Gas Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Vicarage Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:18.

Southern Gas Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Southern Gas Networks are proposing to carry out New service connection on Vicarage Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:06.

South East Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Mill Road

South East Water are proposing to carry out Utility asset works on Mill Road, Hailsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 20 Nov 2024 at 14:30.


Roadworks Map near to Brunel Drive, HAILSHAM, BN27 3FY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Brunel Drive, HAILSHAM, BN27 3FY (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South East Water logo
URGENT
  
LONDON ROAD 
(0.4 miles)
South East Water
Utility repair and maintenance works - Verge - No carriageway incursion
Complete
19 Nov 2024 12:50 - 14:00
0.4
Details
Share
2
East Sussex County Council logo
MAJOR
  
NEW NORTH STREET 
(0.7 miles)
East Sussex County Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - No carriageway incursion
In Progress
Since: 30 Sep 2024 07:00
(Scheduled: 30 Sep 2024 - 20 Mar 2026)
0.7
Details
Share
Follow
3
East Sussex County Council logo
MAJOR
  
NEW NORTH STREET 
(0.9 miles)
East Sussex County Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway, Verge - Multi-way signals
In Progress
Since: 30 Oct 2024 07:00
(Scheduled: 30 Oct 2024 - 24 Dec 2024)
0.9
Details
Share
Follow
4
South East Water logo
MAJOR
  
BATTLE ROAD 
(0.9 miles)
South East Water
Permanent reinstatement - Carriageway - Road closure
Planned
Scheduled: 20 Nov 2024 - 21 Nov 2024
0.9
Details
Share
Follow
5
South East Water logo
MAJOR
  
BATTLE ROAD 
(0.9 miles)
South East Water
Permanent reinstatement - Carriageway - Road closure
Cancelled
(Scheduled: 20 Nov 2024 - 21 Nov 2024)
0.9
Details
Share
6
East Sussex County Council logo
SOUTH ROAD 
(1.0 miles)
East Sussex County Council
Section 50 - Carriageway - Multi-way signals
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
1.0
Details
Share
Follow
7
East Sussex County Council logo
SOUTH ROAD 
(1.0 miles)
East Sussex County Council
Section 50 - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 18 Nov 2024 07:00
(Scheduled: 18 Nov 2024 - 29 Nov 2024)
1.0
Details
Share
Follow